Stovax (P)8143**UC, (P)8120**UC, (P)8136**UC, (P)8144**UC, (P)8135**UC manual Piezo, ODS Pilot Unit

Page 27

SERVICING INSTRUCTIONS

REPLACING PARTS

2.5replace with a new ignition lead following the same route as the old one. replace the valve cover and securing screw.

2.6check the operation of the new ignition lead.

3.PIEZO

3.1The piezo unit used on this appliance is not serviceable and unlikely to fail. If a new piezo is required it will be necessary to change the gas valve, refer to section 7.

4.ODS PILOT UNIT

4.1Remove the fire, see section 1.

4.2Remove the pilot shield and place to one side. Gently pull the ignition lead off the electrode. See diagram 5.

5

4.3Undo the thermocouple connection from the back of the gas valve and carefully pull the thermocouple clear of the pipework and valve. See diagram 6, arrow A.

6

A

AR1114

4.4Undo the pilot pipe connection from the pilot unit, remove the 2 screws securing the pilot and remove the pilot assembly. See diagram 7.

7

4.5Replace with a new pilot unit of the correct type (refer to short spares list) and re-assemble. Set the spark gap as shown in diagram 5, replace the appliance and check the pipework for gas soundness, especially the inlet connection and pilot pipe connection.

4.6Carry out flame failure functional check as detailed in the flow chart paying particular attention to the mag drop out time.

27

Image 27
Contents Aspen, Chamonix & Tahoe Decorative Gas Basket Fires Contents Appliance Commissioning Checklist Flue Check Pass FailGAS Check Turning the Appliance OFF User InstructionsGeneral Lighting the ApplianceCleaning the Fire Upgrading Your FireArrangement of Fuel BED Components Coal & Pebble Layout Small Aspen & Chamonix Coal & Pebble Layout Tahoe Coal & Pebble Layout Medium Chamonix, Large Aspen & ChamonixLog & Driftwood Layout Small Aspen & Chamonix AR1276 Log & Driftwood Layout Tahoe Servicing Oxygen Depletion SensorFlame Failure Device RunningHigh Flue and Chimney Requirements Installation InstructionsInstallation of the GAS Supply Site RequirementsAppliance Location Control UpgradeUnpacking InstallationSafety Precautions InstallationArrangement of Fuel BED Components AR1265 AR1268 AR1277 AR1274 AR1278 AR1285 Commissioning CommissioningServicing / Fault Finding Charts Servicing InstructionsServicing Requirements Ignition Functional Check Ignition Functional CheckFlame Failure Functional Check Fault Finding ChartsReplacing Parts Fire RemovalIgnition Lead ODS Pilot Unit PiezoMagnetic Unit Main InjectorPrimary Aeration Plate Engine Assembly Air Box Gasket Pilot Assembly Databadge GAS ValveChanging Between GAS Types LPG Gas Components Natural Gas ComponentsService Records Member of the Stovax Group