Stovax (P)8127**UC, (P)8120**UC manual Coal & Pebble Layout Medium Chamonix, Large Aspen & Chamonix

Page 7

USER INSTRUCTIONS

7.5 Coal & Pebble Layout -

Medium Chamonix, Large Aspen & Chamonix

7.5.1Place 15 large square blocks in a solid mass in the centre of the burner tray as shown, ensure they fit tightly together. See diagram 9.

9

AR1266

7.5.2Place 18 small coals or pebbles around the edge of the tray as shown, ensure that there are gaps between each coal or pebble. Place one on top of the pilot shield. See diagram 10.

10

AR1267

7.5.3Starting at the front, place 18 alternating large and small coals or pebbles around the perimeter of the fire, they should sit on the bottom row of small coals or pebbles and rest against the inner mass of square blocks. See diagram 11.

11

7.5.4Place the remaining 11 large coals or pebbles on top of the square blocks, ensure that there are gaps between each coal or pebble. See diagram 12.

12

AR1269

7.6Coal & Pebble Layout - Tahoe

7.6.1Place 10 small coals or pebbles around the edge of the tray as shown, ensure that there are gaps between each coal or pebble. See diagram 13.

13

AR1270

7.6.2Place 6 large square blocks in a solid mass in the centre of the burner tray as shown, ensure they fit tightly together. See diagram 14.

14

AR1268

AR1271

7

Image 7
Contents Aspen, Chamonix & Tahoe Decorative Gas Basket Fires Contents Flue Check Pass Fail Appliance Commissioning ChecklistGAS Check Turning the Appliance OFF User InstructionsGeneral Lighting the ApplianceUpgrading Your Fire Cleaning the FireArrangement of Fuel BED Components Coal & Pebble Layout Small Aspen & Chamonix Coal & Pebble Layout Tahoe Coal & Pebble Layout Medium Chamonix, Large Aspen & ChamonixLog & Driftwood Layout Small Aspen & Chamonix AR1276 Log & Driftwood Layout Tahoe Servicing Oxygen Depletion SensorFlame Failure Device RunningHigh Flue and Chimney Requirements Installation InstructionsInstallation of the GAS Supply Site RequirementsAppliance Location Control UpgradeUnpacking InstallationSafety Precautions InstallationArrangement of Fuel BED Components AR1265 AR1268 AR1277 AR1274 AR1278 AR1285 Commissioning CommissioningServicing Instructions Servicing / Fault Finding ChartsServicing Requirements Ignition Functional Check Ignition Functional CheckFlame Failure Functional Check Fault Finding ChartsFire Removal Replacing PartsIgnition Lead ODS Pilot Unit PiezoMain Injector Magnetic UnitPrimary Aeration Plate GAS Valve Engine Assembly Air Box Gasket Pilot Assembly DatabadgeChanging Between GAS Types LPG Gas Components Natural Gas ComponentsService Records Member of the Stovax Group