INSTALLATION INSTRUCTIONS
2.6Or
• Fit a
This must be done with the frame removed, see Section 3
9
PR8084
2.7Fit a Contemporary
The removable frame base is not shown for clarity but must be in place before the Log Bar is fitted, See Section 3A.
10
PR8082
3.Fitting of Frames
3.1Brass or Brushed Steel Profil Frames
•Fit the brass or brushed steel Profil Frame, Diagram 11
11
•Locate the frame around the flange
•Fold the tabs around the back edge of the flange - shown in detail (2 on sides and 2 on top)
3.2Arts Frames
•Drill 4 Ø7.5 holes in the positions shown, Diagram 12
A 1:1 scale drilling template is provided with the frame to assist in correctly locating the holes.
| 12 |
|
|
|
|
|
| 16" Frame Drilling Template |
|
|
|
|
|
|
|
| 18 | 338 |
|
Ø7,5THRO - 4 POS
547
| 30 | 20 |
| 434 | |
+ |
| |
All dims to be - 0.5mm |
|
|
•Attach Upper ('U' shaped) and Lower (L shaped) brackets on the front of the firebox flange using M6 Countersunk Screws and Nuts, Diagram 13
13M6
Countersunk
Screw
M6 Nut
PR8086
•Line the frame up with the flange
•Lower the frame over the brackets and slide into bracket slots
•Check it is located securely, Diagram 14
Tab
21