INSTALLATION INSTRUCTIONS
14
PR8087
3.3Steel Square/Rectangular Frames
• Drill 4 Ø7.5 holes in required positions, 16" Diagram 12, 22" Diagram 15, 26" Diagram 16
A 1:1 scale drilling template is provided with the frame to assist in correctly locating the holes.
| 15 |
|
|
|
|
|
| 22" Frame Drilling Template |
|
|
|
|
|
|
|
| 30 | 464 |
|
Ø7,5THRO - 4 POS
607
|
|
| 30 | 20 |
|
|
|
|
|
| |
All dims to be | + | 584 |
|
| |
|
|
| |||
- 0.5mm |
|
|
| ||
16 |
|
|
|
|
|
|
|
| 26" Frame Drilling Template |
|
|
|
|
|
|
|
|
|
| 30 | 564 |
|
|
|
|
|
| ||
Ø7,5THRO - 4 POS |
|
|
|
607
30 | 20 |
|
684
All dims to be +- 0.5mm
•Attach upper and lower brackets on the front of the firebox flange using M6 Countersunk Screw and Nuts, Diagram 17
17 | Upper Bracket |
| Return |
| Top Flange |
| PR80088 |
The top brackets have a return that sits on the top flange, see detail views. The bottom brackets must line up horizontally with the upper.
•Slide the air deflector in a right direction, behind the
Upper Frame brackets, See Diagram 18
18 | Frame not shown for clarity |
|
|
|
|
|
|
|
| PR8092 - 1 |
|
|
| |
| PR8092 - 2 | ||||
|
|
|
|
|
|
•Line the frame up above the brackets and lower into bracket slots locating the top first
19 |
|
|
|
|
|
| Front |
| Back |
| |
|
|
|
|
|
|
PR8089
•Check the frame is located securely with all 4 frame brackets in the bracket slots
22