COMMISSIONING
COMMISSIONING
1.1To commission:
•Check the soundness of seals, castings and joints (Convector box flange and flue gather)
•Check the operation of the air controls
1.2Now carry out a final smoke draw test:
•First warming the flue with a blowlamp, or similar, for about 10 minutes
•Place a smoke pellet on the centre of the firebox, with the air controls open
Smoke should now be drawn up the flue and be seen to exit from the flue terminal.
•Complete test with all doors and windows closed in the room where the appliance is fitted
•If there are any extractor fans in adjacent rooms, the test must be repeated with the fans running on maximum and interconnecting doors open
•Check the effect of ceiling fans during the test
If the test fails,
•Light the appliance and slowly increase the temperature to operating levels
•Ensure no combustion products enter the room
•When the appliance reaches operating condition carry out a spillage test with a smoke match or pellet around the opening
1.3If excessive spillage occurs:
•Allow the appliance to cool and
1.7Finally:
•Explain the safe operation of the appliance and the use of the controls to the user and the importance of only using suitable fuels
•Explain the cleaning and routine maintenance requirements
•Explain the requirement to use a suitable fireguard when children, elderly or infirm persons are near the appliance
•Record dealer/supplier details and installer details in Instructions
•Record serial number in page 3 of Instructions This number is required when ordering spare parts and making warranty claims
•Give the copy of the Instructions to the customer