Samsung AR24HSFSEWKNMG manual Safety Information on Installation

Page 33

Safety Information on Installation

Installation

Carefully follow the precautions listed below because they are essential to guarantee the safety of both the air conditioner and the workers.

Always disconnect the air conditioner from the power supply before servicing it or accessing its internal components.

Verify that installation and testing operations are performed by qualified personnel.

Verify that the air conditioner is not installed in an easily accessible area.

General information

Carefully read the content of this manual before installing the air conditioner and store the manual in a safe place in order to be able to use it as reference after installation.

For maximum safety, installers should always carefully read the following warnings.

Store the operation and installation manual in a safe location and remember to hand it over to the new owner if the air conditioner is sold or transferred.

This manual explains how to install an indoor unit with a split system with two SAMSUNG units. The use of other types of units with different control systems may damage the units and invalidate the warranty. The manufacturer shall not be responsible for damages arising from the use of non compliant units.

This product has been determined to be in compliance with the Low Voltage Directive (2006/95/EC) and the Electromagnetic Compatibility Directive (2004/108/ EC) of the European Union.

The manufacturer shall not be responsible for damage originating from unauthorised changes or the improper connection of electric and requirements set forth in the “Operating limits” table, included in the manual, shall immediately invalidate the warranty.

The air conditioner should be used only for the applications for which it has been designed: the indoor unit is not suitable to be installed in areas used for laundry.

Do not use the units if damaged. If problems occur, switch the unit off and disconnect it from the power supply.

In order to help prevent electric shocks, fires or injuries, always stop the unit, disable the protection switch and contact SAMSUNG’s technical support if the unit produces smoke, if the power cable is hot or damaged or if the unit is very noisy.

Always remember to inspect the unit, electric connections, refrigerant tubes and protections regularly. These operations should be performed by qualified personnel only.

The unit contains moving parts, which should always be kept out of the reach of children.

Do not attempt to repair, move, alter or reinstall the unit. If performed by unauthorised personnel, these operations may cause electric shocks or fires.

Do not place containers with liquids or other objects on the unit.

All the materials used for the manufacture and packaging of the air conditioner are recyclable.

The packing material and exhaust batteries of the remote control (optional) must be disposed of in accordance with current laws.

The air conditioner contains a refrigerant that has to be disposed of as special waste. At the end of its life cycle, the air conditioner must be disposed of in authorised centres or returned to the retailer so that it can be disposed of correctly and safely.

Installation of the unit

IMPORTANT: When installing the unit, always remember to connect first the refrigerant tubes, then the electrical lines. Always disassemble the electric lines before the refrigerant tubes.

Upon receipt, inspect the product to verify that it has not been damaged during transport. If the product appears damaged, DO NOT INSTALL it and immediately report the damage to the carrier or retailer (if the installer or the authorised technician has collected the material from the retailer.)

After completing the installation, always carry out a functional test and provide the instructions on how to operate the air conditioner to the user.

Do not use the air conditioner in environments with hazardous substances or close to equipment that release free flames to avoid the occurrence of fires, explosions or injuries.

32English

DB68-06043A-00.indd 32

4/1/2016 5:44:25 PM

Image 33
Contents Samsung Air conditionergioner Contents Safety Information on Installation Preparation InstallationFor Installation Safety InformationSafety Information For Power Supply For Using Safety Information Safety Information For Cleaning 2016 54325 PM Display Indoor Unit OverviewInserting batteries Remote Control OverviewControlling temperature Remote Control OperationOperation modes To 24 CControlling air flow direction Controlling fan speedCool mode Cooling OperationStep cooling function Dehumidifying Operation Dry modeHeating Operation Heat modeQuick Smart Features Auto modeFan mode Fast function Quiet function Comfort functionBeep sound function Single user function Energy-Saving OperationTimed on/Timed off function Good’sleep function Running Auto clean Cleaning at a GlanceCleaning the filter Troubleshooting Cleaning and Maintenance 11.85 Btu/hr/W 55 Btu/hr/W 12.10 Btu/hr/W 70 Btu/hr/W Technical Specifications16.0 kg 55.2 kg95 W/W 12.00 Btu/hr/W 75 Btu/hr/W 11.95 Btu/hr/W 65 Btu/hr/W20 ˚C 15 ˚CInstallation Safety Information on InstallationPower supply line, fuse, or circuit breaker Overview of installation location requirements Choosing the installation locationPreparation Minimum clearances for the outdoor unitPacking and Unpacking Indoor unitOutdoor unit Accessories Checking and preparing accessories and toolsTools Drilling a hole through the wallTaping the pipes, cables, and drain hose Indoor Unit Installation Disassembling the installation plateDisassembling the cover panel Connecting the power and communication cables assembly cable Prepare a compressor and the following tools Optional Extending the power cableOptional Extending the drain hose Installing and connecting the drain hoseOptional Changing the direction of the drain hose Shortening or extending the refrigerant pipes assembly pipe 10 Fixing the installation plate When fixing the indoor unit on a wallWhen fixing the indoor unit on a window frame When fixing the indoor unit on a gypsum board 11 Fixing the indoor unit to the installation plate12 Assembling the cover PanelOutdoor Unit Installation Fixing the outdoor unit in placeOptional Fixing the outdoor unit to a wall with a rack Evacuating the air Adding refrigerant Installation Inspection Running the Smart Install modePerforming the gas leak tests LED Performing final check and trial operation Pumping down refrigerantPumping down for removing the product