Samsung AR24HSFSEWKNMG manual Fixing the installation plate, When fixing the indoor unit on a wall

Page 46

CAUTION

If you need a pipe longer than specified in piping codes and standards, you must add refrigerant to the pipe. Otherwise, the indoor unit may freeze.

While removing burrs, put the pipe face down to make sure that the burrs do not get in to the pipe.

Step 2.10 Fixing the installation plate

You can install the indoor unit on a wall, window frame, or gypsum board.

WARNING

Make sure that the wall, window frame, or gypsum board can withstand the weight of the indoor unit. If you install the indoor unit in a place where it is not strong enough to withstand the unit's weight, the unit could fall and cause injury.

Liquid service port

Gas service port

<High pressure>

<Low pressure>

When fixing the indoor unit on a wall

Fix the installation plate to the wall giving attention to the weight of the indoor unit.

Plastic anchor

20 mm

Wall

 

A

B

D

C

Correct

 

 

 

 

(Unit : mm)

 

 

 

 

 

 

Model

A

B

C

 

D

 

 

 

 

 

 

✴✴18/24✴✴

33

110

110

 

33

 

 

 

 

 

 

 

Pipe bundle hole: Ø 65 mm

Inclined

Cracked

Uneven

Damaged

 

 

thickness

surface

<Flare nut>

NOTE

Excessive torque may cause gas leakage. When extending the pipe with welding or brazing, ensure that nitrogen is used during the welding or brazing process. The joint must be accessible and serviceable.

CAUTION

Tighten the flare nut at the specified torque. If the flare nut is over-tightened, it may break to cause leakage of refrigerant gas.

NOTE

If you mount the plate to a concrete wall using plastic anchors, make sure that gaps between the wall and the plate, created by projected anchor, is less than 20 mm.

When fixing the indoor unit on a window frame

1Determine the positions of the wooden uprights to be attached to the window frame.

2Attach the wooden uprights to the window frame giving attention to the weight of the indoor unit.

3Attach the installation plate to the wooden upright using tapping screws.

English 45

Installation

DB68-06043A-00.indd 45

4/1/2016 5:44:44 PM

Image 46
Contents Samsung Air conditionergioner Contents Installation Safety Information on Installation PreparationSafety Information For InstallationSafety Information For Power Supply For Using Safety Information Safety Information For Cleaning 2016 54325 PM Indoor Unit Overview DisplayRemote Control Overview Inserting batteriesOperation modes Remote Control OperationControlling temperature To 24 CControlling fan speed Controlling air flow directionCooling Operation Cool modeStep cooling function Dry mode Dehumidifying OperationHeat mode Heating OperationAuto mode Quick Smart FeaturesFan mode Fast function Comfort function Quiet functionBeep sound function Energy-Saving Operation Single user functionTimed on/Timed off function Good’sleep function Cleaning at a Glance Running Auto cleanCleaning the filter Troubleshooting Cleaning and Maintenance 16.0 kg Technical Specifications11.85 Btu/hr/W 55 Btu/hr/W 12.10 Btu/hr/W 70 Btu/hr/W 55.2 kg20 ˚C 12.00 Btu/hr/W 75 Btu/hr/W 11.95 Btu/hr/W 65 Btu/hr/W95 W/W 15 ˚CSafety Information on Installation InstallationPower supply line, fuse, or circuit breaker Preparation Choosing the installation locationOverview of installation location requirements Minimum clearances for the outdoor unitIndoor unit Packing and UnpackingOutdoor unit Checking and preparing accessories and tools AccessoriesDrilling a hole through the wall ToolsTaping the pipes, cables, and drain hose Disassembling the installation plate Indoor Unit InstallationDisassembling the cover panel Connecting the power and communication cables assembly cable Optional Extending the power cable Prepare a compressor and the following tools Installing and connecting the drain hose Optional Extending the drain hoseOptional Changing the direction of the drain hose Shortening or extending the refrigerant pipes assembly pipe When fixing the indoor unit on a wall 10 Fixing the installation plateWhen fixing the indoor unit on a window frame 12 Assembling the cover 11 Fixing the indoor unit to the installation plateWhen fixing the indoor unit on a gypsum board PanelFixing the outdoor unit in place Outdoor Unit InstallationOptional Fixing the outdoor unit to a wall with a rack Evacuating the air Adding refrigerant Running the Smart Install mode Installation InspectionPerforming the gas leak tests LED Pumping down refrigerant Performing final check and trial operationPumping down for removing the product