Heatiator ADI60S Air Shutter Setting, Removing Glass Assembly, Replacing Glass Assembly

Page 25

G. Glass Assembly

WARNING

Handle glass doors with care.

Inspect the gasket to ensure it is undamaged.

Inspect the glass for cracks, chips or scratches.

Do NOT strike, slam or scratch glass.

Do NOT operate appliance with glass door removed, cracked, broken or scratched.

Replace glass door assembly as a complete appliance.

Removing Glass Assembly

ADI60S

To release glass assembly, pull the two bottom spring- loaded latches forward and allow them to retract away from the glass assembly. Remove glass assembly by carefully pulling the bottom side of the glass assembly out first. Carefully slide the glass assembly outward and downward until the top tabs are disengaged from the slots.

Replacing Glass Assembly

ADI60S

Tilt glass assembly toward fireplace and slide glass assembly up to engage top two tabs with the corresponding slots. Fasten the two bottom latches.

GLASS ASSEMBLY

BOTTOM LATCH

Figure 11.5 Glass Assembly

H. Air Shutter Setting

Optimal flame appearance is dependent on the air shutter setting. Adjustments should be made by a qualified technician.

 

Model

NG

LP

Burner

ADI60S

3/8 in.

Full Open (3/4 in.)

Heatilator • ADI60S • 345-900 Rev. G • 9/08

25

Image 25
Contents What to do if you smell gas ModelHOT Surfaces Xxxxxxxx Homeowner Reference InformationTable of Contents Listing and Code Approvals Getting Started Design and Installation ConsiderationsTools and Supplies Needed Inspect Appliance and ComponentsMinimum Fireplace Opening Fireplace Size RequirementsADI60 Clearances to Mantels or other Combustibles above Appliance ClearancesVent Termination Minimum Clearances Termination LocationsVent Table Key Vent Information and DiagramsHorizontal Venting Measuring StandardsInstallation Preparation Connecting Vent Pipe Installing Vent Pipe and ApplianceVenting Components Placing, Securing and Leveling the Appliance Factory Built Wood Burning Installing Adaptor and Termination CapDamper Flashing Kit Optional Class a PipeFuel Conversions Gas Connection Gas InformationGas Pressures Check for GAS Leaks High Altitude InstallationsON/OFF Switch Wiring the ApplianceElectrical Information Appliance RequirementsOptional Accessories Junction Box InstallationFAN Junction BOX Mantel Projections FinishingClean the Appliance Appliance SetupAccessories Ember PlacementModels Supreme-XT, Grand-XT Refractory PlacementQVI30, QVI35, ADI60 Refractory from the packagingPositioning the Logs Log Set Assembly LOGS-ADI60Areas for LOG #4 Placement Heatilator ADI60S 345-900 Rev. G 9/08 Air Shutter Setting Glass AssemblyRemoving Glass Assembly Replacing Glass AssemblyBefore Lighting Appliance Operating InstructionsBefore operating this appliance have a qualified technician Standing Pilot Ignition Lighting ApplianceWhat to do if YOU Smell GAS Check Pilot Flame Appearance Initial Break-in ProcedureAfter Appliance is Lit Issue Solutions Frequently Asked QuestionsSymptom Possible Causes Corrective Action TroubleshootingStanding Pilot Ignition System Symptom Possible Cause Corrective Action TroubleshootingMaintaining and Servicing Appliance Maintenance TasksDoors, Surrounds Inspect Maintenance TasksReference Materials Appliance Dimension DiagramDirect Vent Flex Liner Kits Vent Kits ComponentsService Parts Log Set AssemblyPart number list on following At Depot Service PartsStocked Standing Pilot Valve AssemblyCONDITIONS, Exclusions & Limitation of Liability Limited Lifetime Warranty Contact Information