Heatiator ADI60S owner manual Termination Locations, Vent Termination Minimum Clearances

Page 8

4 Termination Locations

A. Vent Termination Minimum Clearances

Figure 4.1 specifies minimum vent heights for various pitched roofs.

HORIZONTAL

OVERHANG

2FT.

MIN.

GAS DIRECT VENT

TERMINATION CAP

20 INCHES MIN.

VERTICAL

LOWEST

WALL

 

DISCHARGE

 

OPENING

 

X

12

ROOF PITCH

IS X/ 12

H (MIN.) - MINIMUM HEIGHT FROM ROOF TO LOWEST DISCHARGE OPENING

Roof Pitch

H (Min.) Ft.

Flat to 6/12

1.0*

Over 6/12 to 7/12

1.25*

Over 7/12 to 8/12

1.5*

Over 8/12 to 9/12

2.0*

Over 9/12 to 10/12

2.5*

Over 10/12 to 11/12

3.25

Over 11/12 to 12/12

4.0

Over 12/12 to 14/12

5.0

Over 14/12 to 16/12

6.0

Over 16/12 to 18/12

7.0

Over 18/12 to 20/12

7.5

Over 20/12 to 21/12

8.0

* 3 foot minimum in snow regions

Figure 4.1 Minimum height from roof to lowest discharge opening

WARNING

Fire Risk.

Asphyxiation Risk.

Terminations MUST meet minimum clearances.

Exhaust gases are hot.

• Nearby vents may draw fumes into house.

8

Heatilator • ADI60S • 345-900 Rev. G • 9/08

Image 8
Contents HOT Surfaces ModelWhat to do if you smell gas Homeowner Reference Information XxxxxxxxTable of Contents Listing and Code Approvals Design and Installation Considerations Getting StartedTools and Supplies Needed Inspect Appliance and ComponentsADI60 Fireplace Size RequirementsMinimum Fireplace Opening Clearances Clearances to Mantels or other Combustibles above ApplianceTermination Locations Vent Termination Minimum ClearancesVent Information and Diagrams Vent Table KeyHorizontal Venting Measuring StandardsInstallation Preparation Venting Components Installing Vent Pipe and ApplianceConnecting Vent Pipe Placing, Securing and Leveling the Appliance Installing Adaptor and Termination Cap Factory Built Wood BurningDamper Flashing Kit Optional Class a PipeGas Pressures Gas InformationFuel Conversions Gas Connection High Altitude Installations Check for GAS LeaksWiring the Appliance ON/OFF SwitchElectrical Information Appliance RequirementsJunction Box Installation Optional AccessoriesFAN Junction BOX Finishing Mantel ProjectionsAppliance Setup Clean the ApplianceAccessories Ember PlacementRefractory Placement Models Supreme-XT, Grand-XTQVI30, QVI35, ADI60 Refractory from the packagingLog Set Assembly LOGS-ADI60 Positioning the LogsAreas for LOG #4 Placement Heatilator ADI60S 345-900 Rev. G 9/08 Glass Assembly Air Shutter SettingRemoving Glass Assembly Replacing Glass AssemblyBefore operating this appliance have a qualified technician Operating InstructionsBefore Lighting Appliance What to do if YOU Smell GAS Lighting ApplianceStanding Pilot Ignition After Appliance is Lit Initial Break-in ProcedureCheck Pilot Flame Appearance Frequently Asked Questions Issue SolutionsStanding Pilot Ignition System TroubleshootingSymptom Possible Causes Corrective Action Troubleshooting Symptom Possible Cause Corrective ActionMaintenance Tasks Maintaining and Servicing ApplianceInspect Maintenance Tasks Doors, SurroundsAppliance Dimension Diagram Reference MaterialsVent Kits Components Direct Vent Flex Liner KitsPart number list on following Log Set AssemblyService Parts Service Parts At DepotStanding Pilot Valve Assembly StockedCONDITIONS, Exclusions & Limitation of Liability Limited Lifetime Warranty Contact Information