INSTALLATION
Checking Gas Connections (Cont.) Installing Remote Receiver Unit
13
INSTALLATION
Continued
5.Correct all leaks at once.
6.Reconnect heater and equipment shutoff valve to gas supply. Check reconnected fittings for leaks.
Test Pressures Equal To or Less Than 1/2 PSIG (3.5 kPa)
1.Close equipment shutoff valve (see Figure 15).
2.Pressurize supply piping system by either opening propane/LP sup- ply tank valve for propane/LP gas or opening main gas valve lo- cated on or near gas meter for natural gas, or using compressed air.
3.Check all joints from propane/LP supply tank to equipment shutoff valve for propane/LP gas (see Figure 16) or from gas meter to equipment shutoff valve for natural gas (see Figure 17). Apply noncorrosive leak detection fluid to gas joints. Bubbles forming show a leak.
4.Correct all leaks at once.
Pressure Testing Heater Gas Connections
1.Open equipment shutoff valve (see Figure 15).
2.Open propane/LP supply tank valve or main gas valve located on or near gas meter for natural gas.
3.Make sure control knob of heater is in the OFF position.
4.Check all joints from propane/LP supply tank to equipment shutoff valve for propane/LP gas (see Figure 16) or from gas meter to equipment shutoff valve for natural gas (see Figure 17). Apply noncorrosive leak detection fluid to gas joints. Bubbles forming show a leak.
5.Correct all leaks at once.
Equipment |
Shutoff Valve |
Gas Meter |
Thermostat Gas Valve or |
Control Valve Location |
Figure 17 - Checking Gas Joints
INSTALLING REMOTE RECEIVER UNIT
1.Disconnect switch wires from the control valve.
2.Remove phillips head screws and heat shield.
3.Remove switch plate (see Figure 18). Discard after removing.
4.Install remote receiver unit onto gas log heater base using phillips head screws.
5.Connect wires as shown in Figure 20.
Front
Screws
Back
6.Light heater (see Operating Heater, pages 16 through 18). Check all other internal joints for leaks.
7.Turn off heater (see To Turn Off Gas to Appliance, page 17).
Open
Equipment
Shutoff
Valve
Wires
Figure 18 - Switch Plate and Wiring Harness (Switch Plate and Orientation May Vary Depending On Model)
Front
Screws
| Closed |
| |
| PO |
| |
Figure 15 - Equipment Shutoff Valve |
| ||
| Equipment | Remote | |
Propane/LP | Shutoff Valve | ||
Receiver | |||
| |||
Tank |
| Figure 19 - Installing Remote Receiver | |
|
| ||
|
| White Wire | |
|
| From Receiver | |
| Thermostat Gas | Red Wire | |
| From Receiver | ||
| Valve or Control | ||
|
| ||
Figure 16 - Checking Gas Joints | Valve Location | Figure 20 - Connecting Wires | |
| |||
|
|
For morevisit www..com
Back
Valve