Quadra-Fire 31M-ACC-GT, 31ST-ACC, 31M-ACC-NT 7Appliance Set Up, Begin installing the ARS System

Page 21

R

3100 Wood Stove Series (ACC)

7Appliance Set Up

A.Pedestal Assembly and Ash Removal System (ARS) Installation for Step Top Uni-body

NOTE: The Ash Removal System, must be installed first before installing the pedestal.

Included in Kit: Door assembly, door handle & magnet, ash grate, ash grate channel, ash drawer, fastener package. A cover plate that is required for a floor outside air instal- lation on a pedestal model is also included, If not needed, discard.

Tools Required: Phillips head screw driver, 7/16 socket wrench, 3/32 and 5/36 Allen wrench.

Begin installing the ARS System.

1.Remove 2 bricks as shown in Figure 21.1

2.Lay body of stove on its back on a protective pad or pallet.

3.Remove the 2 nuts and 2 bolts holding the grate in place and set the grate aside. Discard the 2 nuts. Install the gasket over the 4 protruding screws. Figure 21.2.

4.Install ash door assembly by sliding the rod at an angle into the slot on the left side and sliding over the 4 screws protruding from the bottom of the stove. Secure with nuts provided. Figure 21.2.

5.Install magnet using a Phillips head screw driver. This magnet will hold the door handle in an open position which in turn holds the ash door open so ashes can be brushed into the ash drawer. Figure 21.2.

6.Install door handle by placing over rod and sliding to the right. While in an open position, line up the set screw with the flat side of the rod and tighten the set screw using a 3/32 Allen wrench. The set screw needs to be snug.

Figure 21.3.

WARNING

Do NOT operate before fully assembling components.

Burning your stove without a pedestal or leg kit attached:

Will void your warranty.

May result in property damage or personal injury.

Remove for installation and then re-install

Figure 21.1

Door Handle

Gasket

Lay stove flat on

protective padding or

pallet

Magnet

Slide rod at an

angle into slot

Ash Door

Assembly

Figure 21.2

Set Screw

(align with flat

side of rod)

Ash Door Rod shown in installed position

Door handle must be in open position to tighten set screw

Figure 21.3

March 2, 2007

7033-277C

Page 21

Image 21
Contents Step Top Uni-Body Model Millennium Model Pedestal Model ShownFire Risk Welcome to the Quadra-Fire Family Wood Stove Series ACCTable of Contents BTU & Efficiency Specifications Listing and Code ApprovalsAppliance Certification Mobile Home ApprovedService / Maintenance Tip Fire SafetyAsphyxiation Risk Any such action that may cause a fire hazard Fire RiskWood Stove Series ACC Negative Pressure Appliance needs to draft properly for safetyVenting Systems Wood Stove Series ACC Flue Draft ConsiderationsTools And Supplies Needed Inspect Appliance & Components and Pre-Use Check ListMasonry Chimney Wood Stove Series ACC Typical Stove Systems3Dimensions and Clearances Appliance DimensionsMillennium Model 34-1/4 in mm 457mm 14-15/16 19-1/16 in.379mm 484mm 33-1/8 Double Wall Pipe Wood Stove Series ACC Clearances to Combustibles UL and ULCHearth Protection Requirements InstallationMillennium Model See FigureWood Stove Series ACC Step-Top Uni-Body Model Wood Stove Series ACC Outside Air Kit Installation Items Needed for Installation not suppliedFire Risk Asphyxiation Risk Shock Risk Wood Stove Series ACC Blower OptionalVenting Components Chimney Systems 5Chimney RequirementsAir Clearances ComponentsInstructions Solid Pack Chimney with Metal Supports as a ThimbleInstalling Chimney Components Solid Pack Chimney with Metal Supports as a Thimble Cont’dChimney Height / Rise and Run Rule Wood Stove Series ACC Chimney Termination RequirementsPart SRV7033-041 for installation in a mobile Home Mobile Home InstallationBegin installing the ARS System 7Appliance Set UpInstalling Pedestal Assembly Finishing the ARS InstallationStep Top model with a pedestal assembly you must attach Attach the 2 bottom screws of the mounting brackets to Installing Leg KitAdjusting The Blower Speed Control Wood Stove Series ACC Door Handle AssemblyBurning Process Operating InstructionsWood Selection & Storage Kindling or First StageAir Controls Automatic Combustion Control ACCBurn Rates and Operating Efficiency Wood Stove Series ACC Building a Fire Wood Stove Series ACC Blower Operating Instructions Initial cold start-up and all Burn SettingsOpacity Smoke OverfiringIssues Solutions Wood Stove Series ACC Frequently Asked QuestionsCreosote Chimney Cleaning General MaintenanceARS Operating and Cleaning Disposal of AshesGlass Cleaning Glass ReplacementCleaning Plated Surfaces Fire Risk Injury RiskBrick Size Qty Wood Stove Series ACC Firebrick ReplacementBaffle Wood Stove Series ACC Baffle Removal Snap Disc ReplacementWood Stove Series ACC Tube Channel Assembly Replacement Removing Tube Channel AssemblyReplacing Tube Channel Assembly Diagnostic Question Possible Causes of Condition Solutions TroubleshootingDon’t get enough/any heat. What can I do about it? Exploded view Reference MaterialsSizes Step Top Uni-Body Model Item # Accessories Wood Stove Series ACC Service Parts & AccessoriesItem # Service Parts Item # Service Parts Date of Service Performed By Description of Service Wood Stove Series ACC Service And Maintenance LogWood Stove Series ACC Homeowner’s Notes Wood Stove Series ACC Homeowner’s Notes Cont’d Wood Stove Series ACC Warranty Policy Lifetime WarrantyContact Information Wood Stove Series ACC