7.Refer to Figure 7, the rear cover has (4) keyholes for attachment to the casting sides. Stand the casting sides on the floor with the (2) bolts attached half-way into the edges of the rear cover positioned at the rear. The large diameter holes in the keyholes of the rear cover will be toward the floor. Working with one casting side at a time, place the large diameter holes in the keyholes over and behind both of the bolts at the same time. Push downward on the rear cover to lock the keyholes into position behind the bolts. Finish tightening both bolts to secure rear cover to casting side. Repeat this procedure to secure rear cover to the second casting side.

8.Position the completed portion of the casting in the approximate location for installation as the completed assembly will be heavy.

9.Refer to Figure 8, remove protective packing foam from casting front and window. Remove the (1) 3/4" bolt and (1) 1/4" washer from top of window. Remove (1) 3/8" bolt and 1 - 5/8" x 3/4" retaining tab from bottom of window. Remove the window from casting front. Remove the protective sheet of foam from the casting front.

Place the window into the casting front. Attach the top of the window to the casting front with (1) 1/4" washer and (1) 3/4" bolt. Place the 1 -5/8" x 3/4" retaining tab into the locator notch on the bottom of the casting front. Attach the bottom of the window to the casting front by inserting (1) 3/8" bolt through retaining tab and into locator notch.

10.Refer to Figure 8, attach the (4) 1-1/4" x 1/2" retaining tabs to the casting front with (4) 3/8" bolts. The retaining tabs should be positioned downward, from the casting front, top to the casting front, bottom.

Figure 7

Figure 8

16938-3-0806

Page 11

Image 11
Contents Installation Instructions Table of Contents Minimize this effect. The use of this fan will also improve Important Safety InformationLP-GAS Warning Odor Safety Information for Users of LP-GASIntroduction SpecificationsInstructions to Installer Qualified Installing AgencyUnusually tight construction is defined as construction where Unusually Tight ConstructionChecking Manifold Pressure Installing a New Main Gas CockPressure Testing of the Gas Supply System Recommended Gas Pipe DiameterClearances Figures 2, 3 Installation on Rugs and TileClearances Appliance Hardware Package Appliance Hardware Package Parts ListDetailed Instructions Follow Assembly of Stove Casting16938-3-0806 Assembly of Stove Casting Parts List Optional Stone Inlay InstallationWire Channel Installation Installation of Optional Stone InlayStanding Pilot Operation LOG PlacementOperating Guidelines Initial Lighting FigureLighting Instructions For Your Safety Read Before LightingCorrect Pilot Flame Pattern Incorrect Pilot Flame Pattern Pilot Flame CharacteristicsCleaning the Log Set and Firebox Main Burner Flame CharacteristicsWiring Wiring Diagram Figure MaintenanceMain burner does not light after ODS/pilot is lit TroubleshootingDelayed ignition of main burner HOW to Order Repair Parts Parts List for CIVF-25-21 Parts List for Stove CastingParts View for Stove Casting Parts View for CIVF-25-21 Fan Control Optional Blower Installation InstructionsInstalling Optional CIB-2 Blower Index Part Description CleaningWiring Blower MotorService Notes