Removing the Bottom Panel

Remove the two screws that secure the bottom cap to the furnace. Pivot the bottom cap down to release the bottom panel. Once the bottom panel has been removed, reinstall the bottom cap. See figure 11.

Removing the Bottom Panel

Screw

Bottom Cap

Bottom Panel

FIGURE 11

Horizontal Application

Installation Clearances

Top

Left

 

FLOW

Right

 

AIR

End

 

 

End

 

Bottom

 

 

Vent Connector

Type C

 

Type B1

Type

 

 

 

 

Top

0

 

0

*Front

2−1/4 in. (57 mm)**

 

2−1/4 in. (57 mm)

Back

0

 

0

Ends

2 in. (51 mm)

 

2 in. (51 mm)

Vent

6 in. (152 mm)

 

1 in. (25 mm)

Floor

0‡

 

0‡

*Front clearance in alcove installation must be 24 in. (610 mm). Maintain a minimum of 24 in. (610 mm) for front service access. ** 4−1/2 in. if singlewall vent pipe is used.

‡For installations on a combustible floor, do not install the furnace directly on carpeting, tile or other combustible materials other than wood flooring.

FIGURE 12

Horizontal Applications

The EL280UH furnace can be installed in horizontal ap- plications. Order horizontal suspension kit (51W10) from Lennox, or use equivalent suspension method.

Allow for clearances to combustible materials as indicated on the unit nameplate. Minimum clearances for closet or al- cove installations are shown in figure 12.

This furnace may be installed in either an attic or a crawl- space. Either suspend the furnace from roof rafters or floor joists, as shown in figure 13, or install the furnace on a platform, as shown in figure 14.

Typical Horizontal Application

Unit Suspended in Attic or Crawlspace

Bracket

Metal Strap

Bottom Cap

3/16 inch

Air Flow

FIGURE 13

NOTE − Heavy−gauge perforated sheet metal straps may be used to suspend the unit from roof rafters or ceiling joists. When straps are used to suspend the unit in this way, support must be provided for both the ends. The straps must not interfere with the plenum or exhaust pip- ing installation. Cooling coils and supply and return air plenums must be supported separately.

NOTE − When the furnace is installed on a platform in a crawlspace, it must be elevated enough to avoid water damage and to allow the evaporator coil to drain.

Return Air −− Horizontal Applications

Return air must be brought in through the end of a furnace installed in a horizontal application. The furnace is equipped with a removable bottom panel to facilitate installation. See figure 11.

CAUTION

If this unit is being installed in a space serviced by an exhaust fan, power exhaust fan, or other device which may create a negative pressure in the space, take care when sizing the inlet air opening. The in- let air opening must be sized to accommodate the maximum volume of exhausted air as well as the maximum volume of combustion air required for all gas appliances serviced by this space.

Page 11

Image 11
Contents Table of Contents Installation Instructions EL280UHSupply AIR Opening Unit Dimensions − inches mmParts Arrangement Shipping and Packing List Safety InformationEL280UH Gas Furnace General Use of Furnace as Construction HeaterCombustion, Dilution & Ventilation Air Equipment in Confined Space ALL AIR from Inside Equipment in Confined Space Setting Equipment Return Air Bracket Duct System FiltersUpflow Position VentingHorizontal Right Position Horizontal Left PositionVent Connection Upflow and Horizontal Position Common Venting Using Metal−Lined Masonry Chimney −1/2 To these instructions and the provided venting tables. If Feet FAN + FAN FAN + NAT 130 Carbon Monoxide Poisoning Hazard Leum gases Gas PipingHorizontal Applications Possible Gas Piping Configurations Electrostatic Discharge ESD Interior MAKE−UP BOX InstallationElectrical Page Field Wiring Applications OFF EL280UH Schematic Wiring Diagram TWO−STAGE Integrated Control Typical EL280UH Field Wiring DiagramIntegrated Control Unit Start−Up For Your Safety Read Before LightingHigh Altitude Gas Pressure AdjustmentProper Combustion Manifold Pressure Settings at all Altitudes Heat FAN-OFF Time in Seconds Other Unit AdjustmentsHeating Sequence of Operation Blower Data Pressure Bottom and One Side Electrical SHOCK, Fire Or Explosion Hazard ServiceHeat Exchanger Removal EL280UH BURNER, Combustion AIR Inducer AssemblyPage Repair Parts List Planned ServiceLED Integrated Control Diagnostic CodesFlash Code Status / Error Description On Next Troubleshooting Heating Sequence of OperationHeating Sequence of Operation U1.40 microamps Or Heat Demand is SATISFIED. a Five Cooling Sequence of Operation Troubleshooting Cooling Sequence of OperationContinuous LOW Speed FAN Sequence of Operation Troubleshooting Continuous Fan Sequence of OperationStart−Up & Performance Check List Drain Line Cooling ModeTemperature Rise Unit Operation
Related manuals
Manual 7 pages 50.25 Kb

Elite Series Gas Furnace Upflow/Horizontal Air Discharge, EL280UH specifications

Lennox International Inc. has established itself as a leader in the heating and cooling industry, providing innovative solutions for both residential and commercial environments. One of their notable products is the EL280UH, a high-efficiency gas furnace designed to offer optimal comfort while minimizing energy consumption.

The EL280UH operates with an impressive Annual Fuel Utilization Efficiency (AFUE) rating of up to 80%. This efficiency rating means that 80% of the fuel consumed is converted into heat, making it a cost-effective option for homeowners looking to reduce their utility bills. The furnace’s design is tailored to deliver reliable warmth during the coldest months, ensuring a comfortable home environment.

A key feature of the EL280UH is its two-stage heating capability. This technology allows the furnace to operate at a lower heating output for less demanding conditions, which not only conserves energy but also helps maintain a more consistent temperature in the home. When the demand for heat increases, the furnace can seamlessly transition to its higher output setting, providing quick and effective heating when needed.

Additionally, the EL280UH is equipped with a durable cabinet that minimizes heat loss, enhancing overall performance. The design incorporates several sound-dampening features as well, which contributes to quieter operation, allowing homeowners to enjoy a serene indoor environment.

The furnace also includes an advanced control system that integrates easily with smart home technology. This feature enables users to monitor and adjust their heating settings from anywhere using a smartphone app, creating added convenience and control over home heating.

Safety is another paramount aspect of the EL280UH. It includes an integrated flame sensor and pressure switch, ensuring reliable operation while minimizing risks associated with furnace malfunctions. The design adheres to stringent safety standards, providing users with peace of mind.

In summary, the Lennox EL280UH furnace stands out for its high efficiency, advanced features, and commitment to user safety. Its two-stage heating capability, quiet operation, and smart home integration make it an excellent choice for homeowners looking to enhance their heating system while being energy-conscious. The EL280UH embodies Lennox's dedication to quality and innovation, ensuring that comfort and efficiency go hand in hand.