Lennox International Inc Elite Series Gas Furnace Upflow/Horizontal Air Discharge Venting

Page 13

Venting

A 4−inch diameter flue transition is factory-installed on the combustion air inducer outlet of all models. Figure 16 shows the combustion air inducer as shipped from the factory.

Mounting Screws Location

Mounting Screws

FIGURE 15

UPFlow Position

UPFLOW POSITION

Top Vent Discharge

Vent Pipe

Flue

Collector Box

Transition

 

Pressure

 

Switch

 

Make−Up

 

Box

 

AIR

FLOW

FIGURE 16

IMPORTANT

The unit will not vent properly with the flue transition pointed down in the 6 o’clock position.

The combustion air inducer may be rotated clock- wise or counterclockwise by 90° to allow for top or side vent discharge in all applications. When the unit is installed, the flue transition must be in the 9 o’clock, 12 o’clock or 3 o’clock position.

If necessary reposition the combustion air inducer, pres- sure switch and or make up box as needed per the follow- ing steps and see figures 17 through 22.

1 − Remove the four mounting screws which secure the combustion air inducer / pressure switch assembly to the orifice plate. See figure 15. Lift and rotate the as- sembly 90 degrees clockwise or counter clockwise to either the 3 o’clock position or to 9 o’clock position and re−secure with four screws. Gasket should be left in place.

2 − Use tin snips to cut preferred opening on the cabinet for repositioning the flue outlet. Use the cut out piece as a cover plate to patch unused opening on cabinet.

UPFLOW POSITION

Left Side Vent Discharge

Cover Plate

 

 

 

 

 

Collector Box

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Pressure

Switch

 

Make−Up

Vent Pipe

Box

Flue

Transition

AIR FLOW

SGas supply piping must be brought into the unit from the right side in order to accommodate the flue pipe.

SRemove make−up box assembly (2 screws) and cut wire tie to free make−up box wires. Re−install make−up box on other side of cabinet.

SRe−secure make−up box wires, either pulling excess wires through the blower compartment and securing with supplied wire tie, or coil excess wire and secure to the gas manifold.

FIGURE 17

UPFLOW POSITION

Right Side Vent Discharge

Cover Plate

Pressure

Flue Transition

Vent Pipe

Switch

 

Collector

 

Box

 

Make−Up

 

Box

 

AIR FLOW

SPressure switch tubing may be too long. Cut to fit , then re−attach to barbed fitting on pressure switch. Tubing must not be allowed to sag.

FIGURE 18

Page 13

Image 13
Contents Table of Contents Installation Instructions EL280UHSupply AIR Opening Unit Dimensions − inches mmParts Arrangement EL280UH Gas Furnace Safety InformationShipping and Packing List General Use of Furnace as Construction HeaterCombustion, Dilution & Ventilation Air Equipment in Confined Space ALL AIR from Inside Equipment in Confined Space Setting Equipment Return Air Bracket Duct System FiltersUpflow Position VentingHorizontal Right Position Horizontal Left PositionVent Connection Upflow and Horizontal Position Common Venting Using Metal−Lined Masonry Chimney −1/2 To these instructions and the provided venting tables. If Feet FAN + FAN FAN + NAT 130 Carbon Monoxide Poisoning Hazard Leum gases Gas PipingHorizontal Applications Possible Gas Piping Configurations Electrical Interior MAKE−UP BOX InstallationElectrostatic Discharge ESD Page Field Wiring Applications OFF EL280UH Schematic Wiring Diagram TWO−STAGE Integrated Control Typical EL280UH Field Wiring DiagramIntegrated Control Unit Start−Up For Your Safety Read Before LightingProper Combustion Gas Pressure AdjustmentHigh Altitude Manifold Pressure Settings at all Altitudes Heat FAN-OFF Time in Seconds Other Unit AdjustmentsHeating Sequence of Operation Blower Data Pressure Bottom and One Side Electrical SHOCK, Fire Or Explosion Hazard ServiceHeat Exchanger Removal EL280UH BURNER, Combustion AIR Inducer AssemblyPage Repair Parts List Planned ServiceFlash Code Status / Error Description Integrated Control Diagnostic CodesLED On Next Troubleshooting Heating Sequence of OperationHeating Sequence of Operation U1.40 microamps Or Heat Demand is SATISFIED. a Five Cooling Sequence of Operation Troubleshooting Cooling Sequence of OperationContinuous LOW Speed FAN Sequence of Operation Troubleshooting Continuous Fan Sequence of OperationStart−Up & Performance Check List Temperature Rise Cooling ModeUnit Operation Drain Line
Related manuals
Manual 7 pages 50.25 Kb

Elite Series Gas Furnace Upflow/Horizontal Air Discharge, EL280UH specifications

Lennox International Inc. has established itself as a leader in the heating and cooling industry, providing innovative solutions for both residential and commercial environments. One of their notable products is the EL280UH, a high-efficiency gas furnace designed to offer optimal comfort while minimizing energy consumption.

The EL280UH operates with an impressive Annual Fuel Utilization Efficiency (AFUE) rating of up to 80%. This efficiency rating means that 80% of the fuel consumed is converted into heat, making it a cost-effective option for homeowners looking to reduce their utility bills. The furnace’s design is tailored to deliver reliable warmth during the coldest months, ensuring a comfortable home environment.

A key feature of the EL280UH is its two-stage heating capability. This technology allows the furnace to operate at a lower heating output for less demanding conditions, which not only conserves energy but also helps maintain a more consistent temperature in the home. When the demand for heat increases, the furnace can seamlessly transition to its higher output setting, providing quick and effective heating when needed.

Additionally, the EL280UH is equipped with a durable cabinet that minimizes heat loss, enhancing overall performance. The design incorporates several sound-dampening features as well, which contributes to quieter operation, allowing homeowners to enjoy a serene indoor environment.

The furnace also includes an advanced control system that integrates easily with smart home technology. This feature enables users to monitor and adjust their heating settings from anywhere using a smartphone app, creating added convenience and control over home heating.

Safety is another paramount aspect of the EL280UH. It includes an integrated flame sensor and pressure switch, ensuring reliable operation while minimizing risks associated with furnace malfunctions. The design adheres to stringent safety standards, providing users with peace of mind.

In summary, the Lennox EL280UH furnace stands out for its high efficiency, advanced features, and commitment to user safety. Its two-stage heating capability, quiet operation, and smart home integration make it an excellent choice for homeowners looking to enhance their heating system while being energy-conscious. The EL280UH embodies Lennox's dedication to quality and innovation, ensuring that comfort and efficiency go hand in hand.