Williams 2903511, 2903512 installation instructions Annual Maintenance Requirements

Page 16

Annual Maintenance Requirements

1.Clean fan blades.

2.Clean air blower.

3.Check and clean silicone red pipes.

4.Check air flow switch.

5.Clean and check exhaust flue pipe and air intake pipe.

6.Check for gas leaks on all connections.

7.Check and adjust gas pressure.

Check red O-Ring Gasket (NRNG003). If it is damaged, replace it.

Gas inlet pressure

Gas

(pipeline)

manifold

 

pressure

 

(burner)

 

Gas burner pressure

 

adjustment

 

15

Image 16
Contents Direct-Vent Wall Furnace Table of Contents General Information and Technical DataSafety Information for Users of LP Gas Safety Rules and General WarningsLP Gas Warning Odor Technical Data Some Points to RememberInstallation Wall InstallationPage Outside Location for Vent Terminal Ring Gasket Gas Conversions Gas Type Nozzle Part NumberNozzle Diameter Minimum Manifold Gas PressureInstalling a New Main Gas Shutoff Valve Pressure Testing of the Gas Supply SystemGas Supply High Altitudes U.S. OnlyChecking the Gas Inlet Pressure First Firing of the FurnaceChecking the Gas Manifold Pressure Electrical Wiring For Your Safety Read Before Operating Operating InstructionsWhat to do if the RED Lamp is LIT Checking and Adjusting the Gas Manifold Pressure ServicingLubrication of Moving Parts Flame Visual CheckAnnual Maintenance Requirements Programmable Timer OverviewSetting and Adjustment Initial Conditions Day and Time SettingProgramming the Timer Manual OperationCancelling a Single Program Cancelling of all Preset ProgramsUsing the Skip Function Skip Function Procedure During OperationTroubleshooting Starting Sequence ElectricalTroubleshooting Step Starting Sequence Gas Replacement Parts Gas AssemblyJMTR018