Williams 2903511, 2903512 installation instructions Starting Sequence Gas

Page 22

Point 13 (TR)

No inlet voltage (120 V).

Check 5 pole connector and control box.

If everything is okay, replace the connector.

No outlet voltage (24 V) during ignition.

Check wiring and connections.

If everything is okay, replace the transformer.

Point 14 (EV1)

Valve closed during ignition (Z2 down).

Check wiring, connections and voltage.

If everything is okay, replace the gas valve.

Point 15 (RP7)

No spark during ignition.

Check electrode, wiring and connections.

If everything is okay, replace the flame control box.

Point 16 (RP8) No flame sensing.

Check flame sensor, wiring and connections. Check gas pressure and exhaust flue pipe.

If everything is okay, replace the flame control box.

Point 17 (EV2)

No voltage on EV2 with Z2 up.

Check wiring and connections.

If everything is okay, replace the switch.

Valve closed with voltage with Z2 up.

Check wiring, connections and voltage.

If everything is okay, replace the gas valve.

Starting Sequence (Gas)

1.Check and clean exhausted flue pipes;

2.Check and clean air blower and fan motor;

3.Check and clean burner and combustion chamber;

4.Check and clean gas nozzle;

5.Check gas type;

6.Check supply gas line pressure (see the manual);

7.Check gas losses;

8.Set burner gas pressure (see the manual).

21

Image 22
Contents Direct-Vent Wall Furnace Table of Contents General Information and Technical DataSafety Information for Users of LP Gas Safety Rules and General WarningsLP Gas Warning Odor Technical Data Some Points to RememberInstallation Wall InstallationPage Outside Location for Vent Terminal Ring Gasket Nozzle Diameter Gas ConversionsGas Type Nozzle Part Number Minimum Manifold Gas PressureGas Supply Installing a New Main Gas Shutoff ValvePressure Testing of the Gas Supply System High Altitudes U.S. OnlyChecking the Gas Inlet Pressure First Firing of the FurnaceChecking the Gas Manifold Pressure Electrical Wiring For Your Safety Read Before Operating Operating InstructionsWhat to do if the RED Lamp is LIT Lubrication of Moving Parts Checking and Adjusting the Gas Manifold PressureServicing Flame Visual CheckAnnual Maintenance Requirements Programmable Timer OverviewProgramming the Timer Setting and Adjustment Initial ConditionsDay and Time Setting Manual OperationUsing the Skip Function Cancelling a Single ProgramCancelling of all Preset Programs Skip Function Procedure During OperationTroubleshooting Starting Sequence ElectricalTroubleshooting Step Starting Sequence Gas Replacement Parts Gas AssemblyJMTR018