Williams 2903512, 2903511 installation instructions Troubleshooting Step

Page 21

Troubleshooting Step 3

Point 5 (Z1)

Z1 is open and no ignition. Check wiring and connections. If everything is okay, replace the switch.

Point 7 (M2)

M2 is closed and fan thermostat temperature lower than 104 °F.

Check wiring and connections. If they are okay, replace the thermostat.

Step 4

8.Check Z9 (Room thermostat). Close the thermostat with a clockwise rotation.

9.Check M1 (Overheat thermostat, automatic reset). The thermostat is closed at a temperture lower than 140 °F.

10.Check S (Combustion blower motor).

Troubleshooting Step 4

Point 8 (Z9)

After a clockwise rotation, the contact is still open. Check wiring and connections. If they are okay, and the room temperature is cold, replace the switch.

Point 9 (M1)

M1 is open and fan thermostat temperature is lower than 140 °F. Check wiring, connections, gas pressure and fan motor. Clean fan blades and air grids. If everything is okay, replace the thermostat.

Point 10 (S)

S motor does not run. Check voltage, wiring and connections.

If everything is okay, replace the motor.

Step 5

 

 

11.

Check NP (Pressure switch).

 

 

12.

Check electrical supply to flame control box

24 V

120 V

 

(120 V)

 

 

13.Check TR (electrical transformer) (120V/24V)

14.Check EV1 (Min gas valve, 24V)

15.Check RP7 (ignition electrode)

16.Check RP8 (flame sensor)

17.Check EV2 (Max gas valve, 24 V)

Troubleshooting Step 5

Point 11 (NP)

NP contact is open and air blower ON.

Check wiring and connections. Check and clean blower pipes.

Check and clean burner and flue gas pipe. Clean blower.

If everything is okay, replace the switch.

20

Image 21
Contents Direct-Vent Wall Furnace General Information and Technical Data Table of ContentsSafety Rules and General Warnings Safety Information for Users of LP GasLP Gas Warning Odor Some Points to Remember Technical DataWall Installation InstallationPage Outside Location for Vent Terminal Ring Gasket Gas Type Nozzle Part Number Gas ConversionsNozzle Diameter Minimum Manifold Gas PressurePressure Testing of the Gas Supply System Installing a New Main Gas Shutoff ValveGas Supply High Altitudes U.S. OnlyFirst Firing of the Furnace Checking the Gas Inlet PressureChecking the Gas Manifold Pressure Electrical Wiring Operating Instructions For Your Safety Read Before OperatingWhat to do if the RED Lamp is LIT Servicing Checking and Adjusting the Gas Manifold PressureLubrication of Moving Parts Flame Visual CheckAnnual Maintenance Requirements Overview Programmable TimerDay and Time Setting Setting and Adjustment Initial ConditionsProgramming the Timer Manual OperationCancelling of all Preset Programs Cancelling a Single ProgramUsing the Skip Function Skip Function Procedure During OperationStarting Sequence Electrical TroubleshootingTroubleshooting Step Starting Sequence Gas Gas Assembly Replacement PartsJMTR018