6.Promptly apply solvent cement to end of pipe and inside socket surface of fitting. Cement should be applied lightly but uniformly to inside of socket. Take care to keep excess cement out of socket. Apply second coat to end of pipe.

7.Immediately after applying last coat of cement to pipe, and while both inside socket surface and end of pipe are wet with cement, forcefully insert end of pipe into socket until it bottoms out. Turn PVC pipe 1/4 turn during assembly (but not after pipe is fully inserted) to distribute cement evenly. Do not turn ABS or cellular core pipe.

NOTE: Assembly should be completed within 20 seconds after last application of cement. Hammer blows should not be used when inserting pipe.

8.After assembly, wipe excess cement from pipe at end of fitting socket. A properly made join will show a bead around its entire perimeter. Any gaps may indicate an improper defective assembly due to insufficient solvent.

9.Handle joints carefully until completely set.

Venting Practices

Piping Suspension Guidelines

NOTE: Isolate piping at the point where it exits the outside wall or roof in order to prevent transmission of vibration to the structure.

Wall Thickness Guidelines

Figure 18

If this gas furnace replaces a furnace which was commonly vented with another gas appliance, the size of the existing vent pipe for that gas appliance must be checked. Without the heat of the original furnace flue products, the existing vent pipe is probably oversized for the single water heater or other appliance. The vent should be checked for proper draw with the remaining appliance.

Figure 19

Exhaust Piping (Figures 22 and 23)

1.In areas where piping penetrates joist or interior walls, hole must be large enough to allow clearance on all sides of pipe through center of hole using a hanger.

2.When furnace is installed in a residence where unit is shut down for an extended period of time, such as a vacation home, make provisions for draining condensate collection from trap and lines.

3.Route piping to outside of structure. Continue with installation following instructions given in piping termination section.

CAUTION

Do not discharge exhaust into an existing stack or stack that also serves another gas appliance. If vertical discharge through an existing unused stack is required, insert PVC pipe inside the stack until the end is even with the top or outlet end of the metal stack.

CAUTION

The exhaust vent pipe operates under positive pressure and must be completely sealed to prevent leakage of combustion products into the living space.

Page 16 of 48

Issue 1031

506501-01

Image 16
Contents Table of Contents A95UH, A93UH, 95G1UH & 92G1UHA95UH, A93UH, 95G1UH & 92G1UH Unit Dimensions inches mm Front View Side ViewExpanded View Safety Information A95UH, A93UH, 95G1UH &92G1UH Gas FurnaceShipping and Packing List Building CodesInstalled in Combination with a Cooling Coil Installed LocationsUse of Furnace as a Construction Heater Product Contains Fiberglass Wool Combustion, Dilution & Ventilation AirUnconfined Space Confined SpaceAir from Inside Equipment in Confined Space All Air From InsideAir from Outside Installation Setting EquipmentShipping Bolt Removal Upflow ApplicationsReturn Air Guidlines Installation ClearancesSide Return Air With transition and filter Removing the Bottom Panel Optional Return Air Base Upflow Applications OnlyHorizontal Applications Horizontal Application Installation Clearances Suspended Installation of Horizontal UnitPipe & Fittings Specifications Return Air -- Horizontal ApplicationsFilters Duct SystemPiping and Fittings Specifications Canadian Applications OnlyJoint Cementing Procedure Outdoor Termination Kits UsageExhaust Piping Figures 22 Horizontal Application Exhaust PipeMinimum Vent Pipe Lengths Maximum Allowable Vent Length Right Hand Discharge Shown Intake Piping Figures 24 through Typical AIR Intake Pipe Connections For Canadian Installations Only General Guidelines for Vent TerminationsFor NON-DIRECT Vent INSTALLATiONS in the USA and Canada Vent Termination ClearancesFor Direct Vent INSTALLATiONS in the USA and Canada 15F75 or 44J41 Field Supplied Wall TerminationDirect Vent Concentric Rooftop Termination Direct Vent Application Using Existing Chimney NON-DIRECT Vent Application Using Existing Chimney NON-DIRECT Vent Roof Termination KITNON-DIRECT Vent Field Supplied Wall Termination Condensate PipingCondensate Trap and Plug Locations Unit shown in upflow positionCondensate Trap Locations Unit shown in upflow position with remote trapLeak Check Gas PipingFire or Explosion Hazard Horizontal Applications Possible Gas Piping Configurations Carbon Monoxide Poisoning Hazard Precautions and Procedures Interior MAKE-UP BOX InstallationAccessory Terminals ElectricalTypical Field Wiring Diagram Furnace & Condensing Unit Thermostat DesignationsIndoor Blower Speeds Generator Use Voltage RequirementsTypical Wiring Diagram Automatic Hot Surface Ignition System Unit Start-Up Integrated ControlPlacing the furnace into operation GAS Valve Shown in on Position Gas Pressure Adjustment Supply Pressure MeasurementManifold Pressure Measurement High Altitude InformationCarbon Monoxide Poisoning Hazard Heat FAN-OFF Time Seconds Electrical SHOCK, Fire Or Explosion Hazard Cleaning the Burner Assembly Planned Service Failure CodesRepair Parts List Cabinet Parts Heating PartsControl Panel Parts Blower PartsUnit SET UP Unit Operation BELOW. Keep Clear of ALL Obstructions Manufacturer Requirements

92G1UH, 95G1UH, A95UH, A93UH specifications

Allied Air Enterprises is renowned for producing high-quality HVAC systems, and its models A93UH, 92G1UH, A95UH, and 95G1UH are no exception. These units exemplify cutting-edge technology, efficiency, and reliability, making them popular choices for residential and commercial applications.

The A93UH model is a high-efficiency gas furnace designed with advanced features that maximize performance while maintaining low operating costs. It boasts a 93% Annual Fuel Utilization Efficiency (AFUE) rating, which ensures that a significant portion of the fuel consumed translates into heat. The A93UH incorporates variable-speed blower technology, allowing for precise airflow adjustments that enhance comfort and energy savings.

Similarly, the 92G1UH is built to provide exceptional heating capabilities. With a robust construction and innovative design, this model also achieves a 92% AFUE rating. It features a durable heat exchanger and a reliable ignition system that ensures consistent performance. The 92G1UH is engineered for quiet operation, minimizing noise levels and contributing to a more comfortable indoor environment.

Moving on to the A95UH, this unit represents the pinnacle of efficiency with its impressive 95% AFUE rating. This model not only emphasizes energy savings but also focuses on long-term durability. Equipped with a two-stage gas valve, the A95UH allows for flexible heating based on demand, which translates into enhanced comfort and efficiency. Additionally, the integrated SmartComfort technology provides homeowners with user-friendly control options.

The 95G1UH model shares many of the same advanced features as the A95UH but is tailored for different installation scenarios. With a comparable efficiency rating, the 95G1UH emphasizes ease of maintenance and installation. Its compact design and lightweight construction make it an ideal choice for various settings where space is limited.

All four models incorporate the latest in comfort control technology, allowing for seamless connectivity and programmability. Homeowners can utilize smart thermostats to optimize their heating schedules, further enhancing energy savings. The featured robust warranty and service support from Allied Air Enterprises provide peace of mind, ensuring that these units will deliver reliable performance for years to come.

Overall, the A93UH, 92G1UH, A95UH, and 95G1UH models stand out in the HVAC market due to their efficiency, innovative features, and durability. These units cater to a variety of heating needs while keeping operational costs low, making them wise investments for any property owner.