Lennox Hearth
MN54-VDLPM, MN04-VDLPM, MN03-VDLPM, MP54-VDLPM, MP03-VDLPM, MP04-VDLPM, EN03-VDLPM
Install
Vent Section Length Chart
Field Wiring
Meter/regulator assembly
Burner Adjustments
Page 30
30
NOTE: THIS PAGE INTENTIONALLY LEFT BLANK.
Page 29
Page 31
Image 30
Page 29
Page 31
Contents
OTL Report No -F-47-5
MPLDV-35NM-2
Table of Contents
Model Orifice size
Millivolt And Electronic Models
All Models
Nat Prop
Model No Shelf Height inches mm
Typical Locations
Location
Top Vent Application
Vent Termination Clearances
Vertical Vent Termination Clearances
Appliance and Vent Clearances
Horizontal Vent Termination Clearances
Routing GAS Line
Typical Installation Sequence
Detailed Installation Steps
Horizontal Vent Termination Clearances
= Clearance to service regulator vent outlet Feet 91cm
Canadian Installation US Installation
Meter/regulator assembly
Inches 30cm
1030 1162 419 1092
Model No
903 1035 419 965
Framing
Model No
Install the Vent System
These fireplaces must be vented directly to the outside
Vertical Termination Systems Roof
Vent Section Length Chart
10 1/2 Min 267 mm
Vent / 45 Degree Starter Elbow Connection
Connection
12/12
Framing Dimensions for Roof Pitch
10-1/2 267 mm
10-1/2
Bracket
Vertical Vent FIGURES/TABLES
Support
Ceiling Firestop/Spacer SV4.5VF Detail View
Horizontal Outside Wall Termination System
Plan the vent run
Frame exterior wall opening
Typical Horizontal Vent Installation
Install firestop/spacer at ceiling
Four incline channels on the collar refer to on
Mm as shown in Figure
Install Firestop/Spacer at exterior wall
Install the desired termination
Slide the collars of the termination onto
Horizontal Vent FIGURES/TABLES
Exterior Wall Thickness
Wall
Connection not Directly AT Appliance
Connection Directly AT Appliance
Wall Firestop/Spacer
Wall
Ceiling Firestop/Spacer SV4.5VF
Pull and extend the outer flexible vent pipe
Install the Outer Flex Pipe
Pull and extend the inner flexible vent pipe
Route Flex Vent
Electronic Wiring See Figure
Field Wiring
Millivolt Wiring See Figure
After the wiring is complete, replace the cover plate
Connecting GAS Line
ING Embers and Volcanic Stones
Installing the Glass Door and Optional Hood
Installing the Glass Door
Millivolt
Finishing Requirements
Burner Adjustments
Burner Adjustment
Wall Details
Installation Accessories
Cold Climate Insulation
Mantel Clearances
Cat
Cat. No. Model No. Description
.2 Installation Code
GAS Conversion Kits
Millivolt Appliances
Pilot Orifice Electronic Appliances Dexen Electronic Valves
Model No Orifice size Natural
Page
Page
850,043M REV. F 09/2008
West Taft Avenue Orange, CA
Related pages
Trouble Shooting for Hunter Fan 90055
Specifications Model SP100W for Giant SP100W
Error Codes for Royal Sovereign RDH-170
Wiring Diagram for Avalon Stoves 700 B-VENT
Where to find answers for Apple 8600
Installation for Samsung 460MX-3
Common Parts List for Jacuzzi EC33000
Error Code List for Mitsubishi FR - S500
Wiring Instructions for Emerson 16C26S-010
How do I update the firmware on Asus RT-N12?
Firmware update guide here
Top
Page
Image
Contents