New Buck Corporation FP-BR-10-ZC manual Gas Pressure Check

Page 20
GAS PRESSURE CHECK

GAS PRESSURE CHECK

Check the inlet pressure to the burner to insure that it is as shown in the table below.

NOTE: The pressure check point is located on the right side of the valve facing burner.

The appliance and its appliance main gas valve must be disconnected from the gas supply piping system during any pressure testing of that system at test pressures in excess of 1/2 psi (3.5kPa).

The appliance must be isolated from the gas supply piping system by closing its equipment shut-off valve during any pressure testing of the gas supply piping system at test pressures equal to or less than 1/2 psi (3.5 kPa).

MODEL

FP-BR10-ZC

FP-BR10-ZC

Gas

Natural

Propane

Maximum Heat Input

10000

10000

Gas Inlet Pressure:

 

 

Maximum

10.5 ins. W.C.

13 ins. W.C.

Minimum

* 5 ins. W.C.

*11 ins. W.C.

Manifold Pressure

3.5 ins. W.C.

9 ins. W.C.

NOTE: On initial installation it may be necessary to bleed out air in the gas lines. Do this by holding the control knob and turning the knob to the pilot position for about 30 seconds.

To check the Regulator pressure, remove the pressure tag plug at the left side of the Regulator facing the heater. The pressure should be checked with the heater burning and the control set on high. After measuring the pressure, replace the pressure tap plug,ensuring that there are no leaks.

* For the purpose of minimum input adjustment.

Page 18

Image 20
Contents MODEL FP-BR-10-ZC VENT-FREE MarchManufacturer NEW BUCK CORPORATION P.O. Box 69 8000 Highway 226 SouthPage TABLE OF CONTENTS Page Page Page Page INSTALLATION CHOOSING THE LOCATION FOR YOUR FIREPLACEGAS LINES DRAFTS11 5/8” 1/8”1/8” 25 1/8” 24” 1 3/4” 25 1/8”INSTALLING THE FIREBOX FIREPLACE CLEARANCESInstall the Firebox 17-3/4FINISHING YOUR FIREPLACE CLEARANCESSIDE WALL 7 MINMANTEL PROFILES FOR ZERO CLEARANCE CABINET MUST BE FOLLOWEDof Unit if mantel is 10 wide or more if mantel is 12 wide or lessNOTE See page 18 for “Gas Pressure Check” 1/2 WOOD SCREWS TOP MANTELMANTEL BASE REARFLAME INSTALLATION AFTER-MARKETMOBILE HOMESGAS CONNECTION PRODUCING ADEQUATE VENTILATION DETERMINING FRESH-AIRFLOW FOR HEATER LOCATION VENTILATION AIR VENTILATION AIR FROM INSIDE BUILDINGVENTILATION AIR FROM OUTDOORS Ventilated Attic Outlet AirOutlet Air To AtticGAS PRESSURE CHECK LOG PLACEMENT Logs are shipped secured in unitFront View of Logs PageOPERATING INSTRUCTIONS Page Page Page FLAME CHECK FLAME NATURAL PROPANEWIRING DIAGRAM POWER CORDMOTOR JUMPERTHERMOSTATPage NOTE #PESBRO84 Blower MotorRating 120 volts/60HZ/0.54 Amps. 1 P.H IMPORTANT SAFEGUARDS CLEANINGTROUBLESHOOTING PROBLEMSOLUTION OBSERVEDDepleted gas supply 6. Burner backfiring during Important above WARNING aboveWARNING above WARNING aboveREPAIR PARTS SERVICINGPARTS LIST Maxitrol ValveBLOWN UP VIEW OF BURNER ASSEMBLY PageLIMITED WARRANTY MODEL FP-BR10-ZC NEW BUCK CORPORATIONPage