New Buck Corporation
FP-BR-10-ZC
manual
Page
Troubleshooting
Install
Repair Parts
Parts list
Wiring Diagram
Cleaning
Log Placement
Page 4
Page 2
Page 3
Page 5
Image 4
Page 3
Page 5
Contents
MODEL FP-BR-10-ZC VENT-FREE
March
Manufacturer NEW BUCK CORPORATION
P.O. Box 69 8000 Highway 226 South
Page
TABLE OF CONTENTS
Page
Page
Page
Page
INSTALLATION
CHOOSING THE LOCATION FOR YOUR FIREPLACE
GAS LINES
DRAFTS
11 5/8”
1/8”
1/8”
25 1/8” 24” 1 3/4” 25 1/8”
INSTALLING THE FIREBOX
FIREPLACE CLEARANCES
Install the Firebox
17-3/4
FINISHING YOUR FIREPLACE
CLEARANCES
SIDE WALL
7 MIN
MANTEL PROFILES FOR ZERO CLEARANCE CABINET
MUST BE FOLLOWED
of Unit if mantel is 10 wide or more
if mantel is 12 wide or less
NOTE See page 18 for “Gas Pressure Check”
1/2 WOOD SCREWS
TOP MANTEL
MANTEL BASE
REAR
GAS CONNECTION
INSTALLATION AFTER-MARKETMOBILE HOMES
FLAME
PRODUCING ADEQUATE VENTILATION
DETERMINING FRESH-AIRFLOW FOR HEATER LOCATION
VENTILATION AIR
VENTILATION AIR FROM INSIDE BUILDING
VENTILATION AIR FROM OUTDOORS
Ventilated Attic Outlet Air
Outlet Air
To Attic
GAS PRESSURE CHECK
LOG PLACEMENT
Logs are shipped secured in unit
Front View of Logs
Page
OPERATING INSTRUCTIONS
Page
Page
Page
FLAME CHECK
FLAME NATURAL PROPANE
WIRING DIAGRAM
POWER CORD
MOTOR
JUMPERTHERMOSTAT
Rating 120 volts/60HZ/0.54 Amps. 1 P.H
NOTE #PESBRO84 Blower Motor
Page
IMPORTANT SAFEGUARDS
CLEANING
TROUBLESHOOTING
PROBLEM
SOLUTION
OBSERVED
Depleted gas supply
6. Burner backfiring during
Important above
WARNING above
WARNING above
WARNING above
REPAIR PARTS
SERVICING
PARTS LIST
Maxitrol Valve
BLOWN UP VIEW OF BURNER ASSEMBLY
Page
LIMITED WARRANTY MODEL FP-BR10-ZC
NEW BUCK CORPORATION
Page
Related pages
How can I optimize recipes in my
Mr. Coffee Bread Maker
?
Top
Page
Image
Contents