New Buck Corporation FP-BR-10-ZC Mantel Profiles For Zero Clearance Cabinet, Must Be Followed

Page 12
MANTEL PROFILES FOR ZERO CLEARANCE CABINET

MANTEL PROFILES FOR ZERO CLEARANCE CABINET

MUST BE FOLLOWED

 

 

 

MANTELS WITH 3/4" BASE

 

 

 

CEILING

 

 

 

 

 

 

 

 

12"

 

 

 

 

COMBUSTIBLE

3-1/2"

 

 

 

 

3"

COMBUSTIBLE

 

10"

 

MATERIAL

 

 

 

 

MATERIAL

 

3-1/2"

42"

 

 

 

 

3/4"

3"

 

3/4"

 

 

 

2-1/2"

 

 

 

 

 

 

 

 

 

 

 

 

 

STAND OFF

 

 

 

 

 

 

LOUVERS

STAND OFF

 

 

LOUVERS

FP-BR10-ZC

2"

FP-BR10-ZC

2"

 

 

HOOD

 

 

 

 

 

HOOD

 

 

 

 

 

 

 

Bottom of 3/4" Base or Support must be Flush with top of Unit if mantel is 10" wide or less.

Bottom of 3/4" Base or Support must be at least 2-1/2" from top

of Unit if mantel is 10" wide or more.

 

 

MANTELS WITH 2-1/2" BASE

 

 

COMBUSTIBLE

 

 

 

12"

SUPPORT

12"

 

COMBUSTIBLE

 

3"

MATERIAL

 

 

 

6"

SUPPORT

MATERIAL

 

 

 

 

 

 

 

 

3"

 

2-1/2"

 

 

2-1/2"

 

 

 

2-1/2"

 

 

 

 

 

STAND OFF

 

 

STAND OFF

 

 

 

 

LOUVERS

 

 

 

2"

 

 

LOUVERS

FP-BR10-ZC

 

 

2"

 

HOOD

FP-BR10-ZC

HOOD

 

 

 

 

 

 

 

Bottom of 2-1/2" Base or Support must be Flush with top of Unit

if mantel is 12" wide or less.

Bottom of 2-1/2" Base or Support must be at least 2-1/2" from top of Unit if mantel is 12" wide or more.

Page 10

Image 12
Contents MODEL FP-BR-10-ZC VENT-FREE MarchManufacturer NEW BUCK CORPORATION P.O. Box 69 8000 Highway 226 SouthPage TABLE OF CONTENTS Page Page Page Page INSTALLATION CHOOSING THE LOCATION FOR YOUR FIREPLACEGAS LINES DRAFTS11 5/8” 1/8”1/8” 25 1/8” 24” 1 3/4” 25 1/8”INSTALLING THE FIREBOX FIREPLACE CLEARANCESInstall the Firebox 17-3/4FINISHING YOUR FIREPLACE CLEARANCESSIDE WALL 7 MINMANTEL PROFILES FOR ZERO CLEARANCE CABINET MUST BE FOLLOWEDof Unit if mantel is 10 wide or more if mantel is 12 wide or lessNOTE See page 18 for “Gas Pressure Check” 1/2 WOOD SCREWS TOP MANTELMANTEL BASE REARINSTALLATION AFTER-MARKETMOBILE HOMES GAS CONNECTIONFLAME PRODUCING ADEQUATE VENTILATION DETERMINING FRESH-AIRFLOW FOR HEATER LOCATION VENTILATION AIR VENTILATION AIR FROM INSIDE BUILDINGVENTILATION AIR FROM OUTDOORS Ventilated Attic Outlet AirOutlet Air To AtticGAS PRESSURE CHECK LOG PLACEMENT Logs are shipped secured in unitFront View of Logs PageOPERATING INSTRUCTIONS Page Page Page FLAME CHECK FLAME NATURAL PROPANEWIRING DIAGRAM POWER CORDMOTOR JUMPERTHERMOSTATNOTE #PESBRO84 Blower Motor Rating 120 volts/60HZ/0.54 Amps. 1 P.HPage IMPORTANT SAFEGUARDS CLEANINGTROUBLESHOOTING PROBLEMSOLUTION OBSERVEDDepleted gas supply 6. Burner backfiring during Important above WARNING aboveWARNING above WARNING aboveREPAIR PARTS SERVICINGPARTS LIST Maxitrol ValveBLOWN UP VIEW OF BURNER ASSEMBLY PageLIMITED WARRANTY MODEL FP-BR10-ZC NEW BUCK CORPORATIONPage