New Buck Corporation FP-BR-10-ZC manual Page

Page 6
Manual background

Page 4

Image 6
Contents Manufacturer NEW BUCK CORPORATION MODEL FP-BR-10-ZC VENT-FREEMarch P.O. Box 69 8000 Highway 226 SouthPage TABLE OF CONTENTS Page Page Page Page GAS LINES INSTALLATIONCHOOSING THE LOCATION FOR YOUR FIREPLACE DRAFTS1/8” 11 5/8”1/8” 25 1/8” 24” 1 3/4” 25 1/8”Install the Firebox INSTALLING THE FIREBOXFIREPLACE CLEARANCES 17-3/4SIDE WALL FINISHING YOUR FIREPLACECLEARANCES 7 MINof Unit if mantel is 10 wide or more MANTEL PROFILES FOR ZERO CLEARANCE CABINETMUST BE FOLLOWED if mantel is 12 wide or lessNOTE See page 18 for “Gas Pressure Check” MANTEL BASE 1/2 WOOD SCREWSTOP MANTEL REARINSTALLATION AFTER-MARKETMOBILE HOMES GAS CONNECTIONFLAME PRODUCING ADEQUATE VENTILATION DETERMINING FRESH-AIRFLOW FOR HEATER LOCATION VENTILATION AIR VENTILATION AIR FROM INSIDE BUILDINGOutlet Air VENTILATION AIR FROM OUTDOORSVentilated Attic Outlet Air To AtticGAS PRESSURE CHECK Front View of Logs LOG PLACEMENTLogs are shipped secured in unit PageOPERATING INSTRUCTIONS Page Page Page FLAME CHECK FLAME NATURAL PROPANEMOTOR WIRING DIAGRAMPOWER CORD JUMPERTHERMOSTATNOTE #PESBRO84 Blower Motor Rating 120 volts/60HZ/0.54 Amps. 1 P.HPage IMPORTANT SAFEGUARDS CLEANINGSOLUTION TROUBLESHOOTINGPROBLEM OBSERVEDDepleted gas supply 6. Burner backfiring during WARNING above Important aboveWARNING above WARNING aboveREPAIR PARTS SERVICINGPARTS LIST Maxitrol ValveBLOWN UP VIEW OF BURNER ASSEMBLY PageLIMITED WARRANTY MODEL FP-BR10-ZC NEW BUCK CORPORATIONPage