New Buck Corporation FP-BR-10-ZC Wiring Diagram, Motor, Jumperthermostat, Green, Rheost, Black

Page 27
Image 27
Contents P.O. Box 69 8000 Highway 226 South MODEL FP-BR-10-ZC VENT-FREEMarch Manufacturer NEW BUCK CORPORATIONPage TABLE OF CONTENTS Page Page Page Page DRAFTS INSTALLATIONCHOOSING THE LOCATION FOR YOUR FIREPLACE GAS LINES25 1/8” 24” 1 3/4” 25 1/8” 11 5/8”1/8” 1/8”17-3/4 INSTALLING THE FIREBOXFIREPLACE CLEARANCES Install the Firebox7 MIN FINISHING YOUR FIREPLACECLEARANCES SIDE WALLif mantel is 12 wide or less MANTEL PROFILES FOR ZERO CLEARANCE CABINETMUST BE FOLLOWED of Unit if mantel is 10 wide or moreNOTE See page 18 for “Gas Pressure Check” REAR 1/2 WOOD SCREWSTOP MANTEL MANTEL BASEINSTALLATION AFTER-MARKETMOBILE HOMES GAS CONNECTIONFLAME PRODUCING ADEQUATE VENTILATION DETERMINING FRESH-AIRFLOW FOR HEATER LOCATION VENTILATION AIR FROM INSIDE BUILDING VENTILATION AIRTo Attic VENTILATION AIR FROM OUTDOORSVentilated Attic Outlet Air Outlet AirGAS PRESSURE CHECK Page LOG PLACEMENTLogs are shipped secured in unit Front View of LogsOPERATING INSTRUCTIONS Page Page Page FLAME NATURAL PROPANE FLAME CHECKJUMPERTHERMOSTAT WIRING DIAGRAMPOWER CORD MOTORNOTE #PESBRO84 Blower Motor Rating 120 volts/60HZ/0.54 Amps. 1 P.HPage CLEANING IMPORTANT SAFEGUARDSOBSERVED TROUBLESHOOTINGPROBLEM SOLUTIONDepleted gas supply 6. Burner backfiring during WARNING above Important aboveWARNING above WARNING aboveSERVICING REPAIR PARTSMaxitrol Valve PARTS LISTPage BLOWN UP VIEW OF BURNER ASSEMBLYNEW BUCK CORPORATION LIMITED WARRANTY MODEL FP-BR10-ZCPage