Heat & Glo LifeStyle SLR-B (COSMO) Termination Locations, Vent Termination Minimum Clearances

Page 22

6 Termination Locations

A. Vent Termination Minimum Clearances

WARNING

Fire Risk.

Maintain vent clearance to combustibles as specifi ed.

DO NOT pack air space with insulation or other materials.

Failure to keep insulation or other materials away from vent pipe may cause overheating and fi re.

A

B

6 in. (minimum) up to 20 in.

18 in. minimum

152 mm/508 mm

457 mm

20 in. and over

0 in. minimum

Gas, Wood or Fuel Oil

Termination Cap

B

A *

2 FT. MIN.

GAS DIRECT VENT TERMINATION CAP

 

 

 

 

HORIZONTAL

 

 

 

 

20 INCHES MIN.

 

 

OVERHANG

 

 

 

VERTICAL

 

 

LOWEST

 

 

WALL

 

 

 

DISCHARGE

 

 

 

OPENING

 

 

 

X

12

ROOF PITCH

IS X/ 12

H (MIN.) - MINIMUM HEIGHT FROM ROOF TO LOWEST DISCHARGE OPENING

Gas

Termination

Cap **

*If using decorative cap cover(s), this distance may need to be increased. Refer to the installation instructions supplied with the decorative cap cover.

**In a staggered installation with both gas and wood or fuel oil terminations, the wood or fuel oil termination cap must be higher than the gas termination cap.

Figure 6.2 Staggered Termination Caps

Roof Pitch

H (Min.) Ft.

Flat to 6/12

1.0*

Over 6/12 to 7/12

1.25*

Over 7/12 to 8/12

1.5*

Over 8/12 to 9/12

2.0*

Over 9/12 to 10/12

2.5

Over 10/12 to 11/12

3.25

Over 11/12 to 12/12

4.0

Over 12/12 to 14/12

5.0

Over 14/12 to 16/12

6.0

Over 16/12 to 18/12

7.0

Over 18/12 to 20/12

7.5

Over 20/12 to 21/12

8.0

* 3 foot minimum in snow regions

Figure 6.1 Minimum Height From Roof To Lowest Discharge Opening

22

Heat & Glo • SLR-B2195-900 Rev. P • 12/11

Image 22
Contents What to do if you smell gas ModelHOT Surfaces Congratulations Homeowner Reference InformationTable of Contents User GuideFinishing Appliance SetupTroubleshooting Reference MaterialsLimited Lifetime Warranty Limited Lifetime WarrantyWarranty Conditions Listing and Code Approvals Installation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsOperating Instructions User Guide Gas Fireplace SafetyYour Fireplace Clear Space Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Decorative Doors and FrontsWhat to do if YOU Smell GAS Lighting Instructions IPIFinal inspection by GAS ValveIssue Solutions Frequently Asked QuestionsInitial Break-in Procedure After Fireplace is LitGlass Cleaning Maintenance and ServiceMaintenance Tasks-Homeowner Remote ControlVenting Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection FireboxGetting Started Typical Appliance SystemTools and Supplies Needed Design and Installation ConsiderationsInspect Appliance and Components Framing and Clearances Selecting Appliance LocationConstructing the Appliance Chase Minimum Framing Dimensions ClearancesCombustible Mantels IN. Thick Wall Sheathing12 Mantel and Wall ProjectionsNon-combustible Mantels Thick Wall Sheathing Non-Combustible Zone Termination Locations Vent Termination Minimum ClearancesCovered Alcove Applications Minimum Clearances for TerminationVent Information and Diagrams Top Vent Horizontal Termination Venting with 1 elbow Top Vent Horizontal Termination Venting with 2 elbows Top Vent Horizontal Termination Venting with 3 elbows SLR-BInstalled Horizontally Top Vent Vertical Termination No Elbows V1 = 44 ft. Max .4 m Exhaust restrictor InstructionsTop Vent Vertical Termination Venting with 2 elbows V1 Minimum Maximum V1 + V2 MinimumTop Vent Vertical Termination Venting with 3 elbows Top Vent Vertical Termination Venting with 4 elbows V1 MIN H1 MAX V2 MIN H2 MAX V3 MINClearances to Combustibles Prior to installing the gas applianceCoaxial to Colinear Venting Termination Cap Flue DamperFloor Hearth Connecting the DV-46DVA-GCL Adapter to Appliance Top VentConnecting the LINK-DV30B to the DV-46DVA-GCL adapter Termination CAP Inlet AIR Vent PipeWall Penetration Framing Vent Clearances and FramingPipe Clearances to Combustibles Combustible Wall PenetrationInstall the Ceiling Firestop Pipe SLPFlat Ceiling Installation Install Attic Insulation ShieldVaulted Ceiling Installation Appliance Preparation Top VentSecuring and Leveling the Appliance Proper Positioning, Leveling And Securing Of AnInstalling Vent Pipe SLP Pipe Assemble Vent SectionsAssemble Slip Sections Secure The Vent SectionsInstall Decorative Ceiling Components Disassemble Vent SectionsInstall Metal Roof Flashing Assemble and Install Storm CollarInstall Decorative Wall Components Install Vertical Termination CapHeat Shield Requirements for Horizontal Termination Install Horizontal Termination Cap 17 Venting through the wallFuel Conversion Access Through the Valve AssemblyGas Information Gas PressureGas Connection Disconnect Gas ValveIntelliFire Ignition System Wiring Wiring RequirementsOptional Accessories Requirements Electrical InformationElectrical Service and Repair Junction Box Installation Finishing Instructions FinishingFraming and Finishing Instructions Non-Combustible Materials SpecificationNON-COMBUSTIBLE Boar D Painting Finish and Sealing JointsFinishing Around Opening with Gypsum Wallboard Wallboard Joint-Crack Prevention and RepairCombustible Mantels MAX Measurement 14 IN. from TOP of MIN. Fireplace OpeningFacing Material Overlap Fit Method Tonic or Martini Decorative FrontHeat & Glo SLR-B 2195-900 Rev. P 12/11 Dimensions of Tonic Decorative Front Decorative FrontsAppliance Setup Pilot Shield Air Shutter Setting Install the MeshAir Shutter Settings Symptom Possible Cause Corrective Action TroubleshootingIntelliFire Ignition System With fi xed glass assembly in place, verify that fl ame is en Appliance Dimension Diagram Reference MaterialsCOOL-ADD Vent Components DiagramsDRC-RADIUS DVP-BEK2Extended Heat Shield SLP-45 45 ElbowSLP90- 90 Elbow Ceiling FirestopAdapter Snorkel Support Box-BlackBlack 305 mm 178 mm 15-1/2 394 mm SLP-TRAP SLP-HRC-SS SLP-HRC-ZC-SS Horizontal Termination CAPSLP-LPC Optional Wire HarnessPVI-SLP LINK-DV30B DVP-2SL DV-46DVA-GCLContact Information Do not Discard this Manual