Heat & Glo LifeStyle SLR-B (COSMO) Top Vent Horizontal Termination Venting with 3 elbows, Slr-B

Page 27

1. Top Vent - Horizontal Termination - (continued)

Top Vent - Horizontal Termination

Venting with 3 elbows

SLR-B

V1 Minimum

H1 + H2 Maximum

V2

V1 + V2 Minimum

90° Elbow

6 ft.

1.8 m

*

*

1 ft.

305 mm

10 ft.

3.0 m

*

*

2 ft.

610 mm

12 ft.

3.7 m

*

*

3 ft.

914 mm

14 ft.

4.3 m

*

*

H1 + H2 MAX. =14 ft. (4.3 m)

V1 + V2 + H1 + H2 MAX. = 40 ft. (12.2 m)

*No specifi c restrictions on this value EXCEPT V1 + V2 + H cannot exceed 40 ft. (12.2 m)

Note: Use SLP Series components only.

Note: There MUST be a 25% reduction in total H when using

ex vent except when using the simple up and out installation (see Figure 7.3).

H2

CAUTION: The SLP-HRC-SS and SLP-HRC-ZC-SS termination caps are not approved for use with pro- pane (LP) fuel. May lead to elevated glass temper- ature that may cause tempered glass breakage.

V2

H1

V1

Figure 7.6

Heat & Glo • SLR-B2195-900 Rev. P • 12/11

27

Image 27
Contents Model What to do if you smell gasHOT Surfaces Homeowner Reference Information CongratulationsUser Guide Table of ContentsReference Materials Appliance SetupTroubleshooting FinishingLimited Lifetime Warranty Limited Lifetime WarrantyWarranty Conditions Listing and Code Approvals Requirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsGas Fireplace Safety Operating Instructions User GuideYour Fireplace Decorative Doors and Fronts Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Clear SpaceGAS Valve Lighting Instructions IPIFinal inspection by What to do if YOU Smell GASAfter Fireplace is Lit Frequently Asked QuestionsInitial Break-in Procedure Issue SolutionsRemote Control Maintenance and ServiceMaintenance Tasks-Homeowner Glass CleaningFirebox Maintenance Tasks-Qualified Service TechnicianGasket Seal and Glass Assembly Inspection VentingTypical Appliance System Getting StartedDesign and Installation Considerations Tools and Supplies NeededInspect Appliance and Components Selecting Appliance Location Framing and ClearancesConstructing the Appliance Chase Clearances Minimum Framing DimensionsMantel and Wall Projections Combustible Mantels IN. Thick Wall Sheathing12Non-combustible Mantels Thick Wall Sheathing Non-Combustible Zone Vent Termination Minimum Clearances Termination LocationsMinimum Clearances for Termination Covered Alcove Applications Vent Information and Diagrams Top Vent Horizontal Termination Venting with 1 elbow Top Vent Horizontal Termination Venting with 2 elbows SLR-B Top Vent Horizontal Termination Venting with 3 elbowsInstalled Horizontally Exhaust restrictor Instructions Top Vent Vertical Termination No Elbows V1 = 44 ft. Max .4 mV1 Minimum Maximum V1 + V2 Minimum Top Vent Vertical Termination Venting with 2 elbowsTop Vent Vertical Termination Venting with 3 elbows V1 MIN H1 MAX V2 MIN H2 MAX V3 MIN Top Vent Vertical Termination Venting with 4 elbowsTermination Cap Flue Damper Prior to installing the gas applianceCoaxial to Colinear Venting Clearances to CombustiblesTermination CAP Inlet AIR Vent Pipe Connecting the DV-46DVA-GCL Adapter to Appliance Top VentConnecting the LINK-DV30B to the DV-46DVA-GCL adapter Floor HearthCombustible Wall Penetration Vent Clearances and FramingPipe Clearances to Combustibles Wall Penetration FramingPipe SLP Install the Ceiling FirestopInstall Attic Insulation Shield Flat Ceiling InstallationVaulted Ceiling Installation Top Vent Appliance PreparationProper Positioning, Leveling And Securing Of An Securing and Leveling the ApplianceAssemble Vent Sections Installing Vent Pipe SLP PipeSecure The Vent Sections Assemble Slip SectionsDisassemble Vent Sections Install Decorative Ceiling ComponentsAssemble and Install Storm Collar Install Metal Roof FlashingInstall Vertical Termination Cap Install Decorative Wall ComponentsHeat Shield Requirements for Horizontal Termination 17 Venting through the wall Install Horizontal Termination CapGas Pressure Access Through the Valve AssemblyGas Information Fuel ConversionDisconnect Gas Valve Gas ConnectionElectrical Information Wiring RequirementsOptional Accessories Requirements IntelliFire Ignition System WiringElectrical Service and Repair Junction Box Installation Non-Combustible Materials Specification FinishingFraming and Finishing Instructions Finishing InstructionsNON-COMBUSTIBLE Boar D Wallboard Joint-Crack Prevention and Repair Finish and Sealing JointsFinishing Around Opening with Gypsum Wallboard PaintingMAX Measurement 14 IN. from TOP of MIN. Fireplace Opening Combustible MantelsOverlap Fit Method Tonic or Martini Decorative Front Facing MaterialHeat & Glo SLR-B 2195-900 Rev. P 12/11 Decorative Fronts Dimensions of Tonic Decorative FrontAppliance Setup Pilot Shield Install the Mesh Air Shutter SettingAir Shutter Settings Troubleshooting Symptom Possible Cause Corrective ActionIntelliFire Ignition System With fi xed glass assembly in place, verify that fl ame is en Reference Materials Appliance Dimension DiagramDVP-BEK2 Vent Components DiagramsDRC-RADIUS COOL-ADDCeiling Firestop SLP-45 45 ElbowSLP90- 90 Elbow Extended Heat ShieldSnorkel Support Box-Black AdapterBlack 305 mm 178 mm 15-1/2 394 mm SLP-HRC-SS SLP-HRC-ZC-SS Horizontal Termination CAP SLP-TRAPLINK-DV30B DVP-2SL DV-46DVA-GCL Optional Wire HarnessPVI-SLP SLP-LPCDo not Discard this Manual Contact Information