Desa (V)V36P Horizontal System Installation Using TWO 90 Elbows, Venting with Two 90 Elbows

Page 12

12

VENTING INSTALLATION INSTRUCTIONS

Installation Planning (Cont.)

 

 

VENTING INSTALLATION INSTRUCTIONS

Continued

HORIZONTAL SYSTEM INSTALLATION USING TWO 90° ELBOWS

The following configurations show the minimum vertical rise requirements for a horizontal system using two 90° elbows.

Venting with Two 90° Elbows

Vertical (V)

Horizontal (H1)

Horizontal (H1) +

 

 

Horizontal (H2)

5' min.

2' max.

6' max.

6' min.

4' max.

12' max.

7' min.

6' max.

18' max.

8' min.

8' max.

20' max.

20' max.

8' max.

20' max.

45° Elbow

Figure 17 - Horizontal Termination Configuration for Venting Using Two 90° Elbows

Venting with Two 90° Elbows

Vertical (V)

Horizontal (H1) +

 

Horizontal (H2)

5' min.

6' max.

6' min.

12' max.

7' min.

18' max.

8' min.

20' max.

20' max.

20' max.

45° Elbow

Figure 18 - Horizontal Termination Configuration for Venting Using Two 90° Elbows with Termination at 90° with Fireplace

For..com

108861-01D

Image 12
Contents TM OWNER’S Operation Installation Manual For Your SafetyFor Your Safety What to do if YOU Smell GAS Table of Contents Safety InformationSafety Information Product Identification Local CodesProduct Features PRE-INSTALLATION PreparationLocation and Space Requirements Clearances Framing and FinishingLocation of Termination CAP Balcony with Perpendicular Side WallVenting Installation Instructions Installation PrecautionsInstallation Planning Horizontal Termination Installation Installing Siding Standoff Horizontal Termination Configurations Vertical Horizontal H Models 32 3/ 4 minModels 36 3/ 4 min Corner Installation Horizontal System Installation Using TWO 90 Elbows Venting with Two 90 ElbowsInstallation for Vertical Termination Flat Ceiling InstallationVertical Termination Configurations Venting with One 90 ElbowHigh Altitude Installation Desa International 5/8 Pipe & Vent KitsDesa International Elbows Vertical VentingDesa International Venting Accessories Desa International TerminationsFireplace Installation Installing Optional Blower AccessoriesModel BK Installation Check GAS TypeModel BKT Installation Blower Model BKTInstalling GAS Piping to Fireplace Location Blower Wiring DiagramInstallation Items Needed Connecting Fireplace to GAS Supply Installation Items NeededPressure Testing Gas Supply Piping System Checking GAS ConnectionsPressure Testing Fireplace Gas Connections Checking Gas Joints for Propane/LP Gas FireplaceReplace the switch bracket Cleaning Glass Door REMOVING/REPLACING Glass DoorRemoving Louver Panels Removing Glass DoorsInstalling LOGS, Lava Rock and Glowing Embers Installing Rear Brick PanelInstalling Log No 36 and 42 Series and Log No 42 Series Only For Your Safety Read Before Lighting Manual Lighting ProcedureOperating Fireplace Lighting InstructionsOptional Remote Operation Cghrc Series OperationCghrcta Series Operation Operating Optional Blower Accessory Pilot AssemblyInspecting Burners Operating Optional GWMT1 Wall Mounted ThermostatCleaning Maintenance Glass DoorPilot and Burners LogsTroubleshooting Observed Problem Possible CauseObserved Problem Possible Cause Remedy Gas leak. See Warning statement AboveReplacement Parts Service HintsTechnical Service SpecificationsIllustrated Parts Breakdown Parts List CHDV36NR Description QTYIllustrated Parts Breakdown KEY Part Number Description QTY VV42P, V42PS, VV42PH, CHDV42NR Refractory Brick Panels CHDV42NR Illustrated Parts Breakdown KEY Part Number Description QTY Accessories Receiver and HAND-HELD ON/OFF Remote Control KIT Ghrc Series Wall Mounted Thermostat ControlWarranty Information