Installation Planning

VENTING INSTALLATION INSTRUCTIONS

Continued

2.Direct vent pipe sections and components are designed with special twist-lock connections.

Twist-Lock Procedure: The female ends of the pipes have lock- ing lugs (indentations). These lugs will slide straight into match- ing slots on the male ends of adjacent pipes. Push pipe sections together and twist one section clockwise approximately one-quar- ter turn until the sections are fully locked (see Figure 8). Note: Horizontal runs of vent must be supported every three feet. Use wall straps for this purpose.

3.Use a 45° elbow to connect venting system to fireplace flue col- lar. The elbow is designed to be twist-locked onto the flue collar as described in step 2. IMPORTANT: Do not attempt to alter the configuration of the elbow by cutting, twisting, bending, etc.

4.Assemble the desired combination of pipe and elbows to the fireplace. If there are long portions of venting run, pre-as- sembled pipe sections may be installed as subassemblies for convenience.

5.Carefully determine the location where the vent pipe assembly will penetrate the outside wall. The center of the hole should line up with the center-line of the horizontal vent pipe. Mark the wall for a 10" x 10" square hole. Cut and frame the square hole in the exterior wall where the vent will be terminated. If the wall being penetrated is constructed of noncombustible material, such as masonry block or concrete, a 7 3/4" hole with zero clearance is acceptable (see Figure 9).

Figure 8 - Vent Pipe Connections WARNING: Do not recess vent termination into any wall. This will cause a fire hazard.

6.Noncombustible Exterior Wall: Position the horizontal vent cap in the center of the 7 3/4" round hole and attach to the exte- rior wall with four wood screws provided. Before attaching the vent cap to exterior wall, run a bead of non-hardening mastic (pliable sealant) around the outside edges to make a seal be- tween it and the outside wall. Note: The four wood screws provided should be replaced with appropriate fasteners for stucco, brick, concrete, or other types of sidings.

Female

Locking Lugs Center

Male

Slots

Figure 8 - Vent Pipe Connections

Vent Opening

 

 

Combustible Wall

10" Inside Framing

 

 

10"

 

(254mm)

(254mm)

 

 

10"

 

 

(254mm)

 

 

 

(Framing

Vent Opening

 

Detail)

 

 

Noncombustible Wall

 

 

7 3/4"

 

 

(197mm)

 

 

 

 

Center

 

 

of Hole

Figure 9 - Vent Opening Requirements

Figure 9 - Vent Opening RequirementsManual backgroundManual backgroundManual backgroundManual backgroundForManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual backgroundManual background.Manual backgroundManual backgroundManual backgroundManual background.comManual backgroundManual backgroundManual backgroundManual backgroundManual background

111251-01D

Image 8
Contents DIRECT-VENTFIREPLACE OWNER’S OPERATION AND INSTALLATION MANUALTABLE OF CONTENTS SAFETY INFORMATIONPRODUCT IDENTIFICATION LOCAL CODESContinued SAFETY INFORMATIONLOCATION AND SPACE REQUIREMENTS PRODUCT FEATURESPRE-INSTALLATION PREPARATION PRE-INSTALLATION PREPARATION ContinuedCLEARANCES FRAMING AND FINISHINGLOCATION OF TERMINATION CAP D E B LV G V A LOCATION OF TERMINATION CAPVENTING INSTALLATION INSTRUCTIONS INSTALLATION PRECAUTIONSINSTALLATION PLANNING Horizontal Termination InstallationVENTING INSTALLATION INSTRUCTIONS VENTING INSTALLATION INSTRUCTIONSContinued Female Locking Lugs Male SlotsContinued VENTING INSTALLATION INSTRUCTIONSVENTING INSTALLATION INSTRUCTIONS VENTING INSTALLATION INSTRUCTIONS Horizontal Termination ConfigurationsVENTING INSTALLATION INSTRUCTIONS ContinuedRecommended Applications VENTING INSTALLATION INSTRUCTIONSContinued VENTING INSTALLATION INSTRUCTIONS ContinuedVenting with Two 90 Elbows Venting with Two 90 ElbowsVENTING INSTALLATION INSTRUCTIONS INSTALLATION FOR VERTICAL TERMINATIONFlat Ceiling Installation ContinuedVENTING INSTALLATION INSTRUCTIONS Vertical Termination ConfigurationsContinued Venting with Two 90 ElbowsVENTING INSTALLATION INSTRUCTIONS HIGH ALTITUDE INSTALLATIONContinued Vertical VentingFIREPLACE INSTALLATION VENTING INSTALLATION INSTRUCTIONSDESA Venting Accessories Model BK InstallationContinued FIREPLACE INSTALLATIONModel BKT Installation Continued FIREPLACE INSTALLATIONBlower Wiring Diagram Continued FIREPLACE INSTALLATIONINSTALLING GAS PIPING TO FIREPLACE LOCATION FIREPLACE INSTALLATION Installation Items NeededPressure Testing Gas Supply Piping System ContinuedFIREPLACE INSTALLATION Pressure Testing Fireplace Gas ConnectionsCleaning Glass Door See Cleaning and Maintenance on pageContinued FIREPLACE INSTALLATIONINSTALLING LOGS, LAVA ROCK AND GLOWING EMBERS FIREPLACE INSTALLATION FIREPLACE INSTALLATIONFigure 43 - Installing Log No Figure 44 - Installing Logs No. 5 and NoWIRING DIAGRAM FIREPLACE INSTALLATIONWALL SWITCH INSTALLATION OPTIONAL REMOTE CONTROL INSTALLATION Model WRCOPERATING FIREPLACE FOR YOUR SAFETY READ BEFORE LIGHTINGLIGHTING INSTRUCTIONS TO TURN OFF GAS TO APPLIANCEINSPECTING BURNERS see Troubleshooting, pageOPERATING FIREPLACE ContinuedCLEANING AND MAINTENANCE GLASS DOORPILOT AND BURNERS LOGSTROUBLESHOOTING OBSERVED PROBLEMPOSSIBLE CAUSE REMEDYTROUBLESHOOTING OBSERVED PROBLEMContinued POSSIBLE CAUSEVT36EPA22-5 VT36EPBA VT36EPRA VT36EPRBA ILLUSTRATED PARTS BREAKDOWNMODELS VT36EN, VT36ENB VT36ENRA, VT36ENRBA PARTS LIST For morevisit www PARTS LISTBURNER ASSEMBLY MODELS ILLUSTRATED PARTS BREAKDOWNModels VT36ENA, VT36ENBA, VT36ENRA VT36ENRBA, VT36EPA, VT36EPBA, VT36EPRA, VT36EPRBAPARTS LIST PARTS LISTBURNER ASSEMBLY MODELS REPLACEMENT PARTS SERVICE HINTSTECHNICAL SERVICE SPECIFICATIONSvisit www OWNERS REGISTRATION FORMFor more Postage Required TAPETAPE 111251-01DACCESSORIES WARRANTY INFORMATION LIMITED WARRANTY DIRECT-VENTFIREPLACE