Desa (V)T36EPA installation manual Installation Planning

Page 9

Venting Installation

instructions

Continued

INSTALLATION PLANNING

There are two basic types of direct-vent in- stallation:

Horizontal Termination

Vertical Termination

Horizontal Termination Installation IMPORTANT: Horizontal square terminations require only inner portion of wall firestop. Hori- zontal installations using round termination require exterior portion of wall firestop available only in vent kit HTK (see Figure 14, page 11).

1. Set the fireplace in its desired location and deter-

mine the route your horizontal venting will take.

Do not secure the fireplace until all venting has

been installed. Some installations require sliding

the fireplace in and out of position to make final

venting connections. Figures 14 through 18 on

5.Carefully determine the location where the vent pipe assembly will penetrate the outside wall. The center of the hole should line up with the center-line of the horizontal vent pipe. Mark the wall for a 10" x 10" square hole. Cut and frame the square hole in the exterior wall where the vent will be terminated. If the wall being penetrated is constructed of noncom- bustible material, such as masonry block or concrete, a 7 3/4" hole with zero clearance is acceptable (see Figure 9).

Male

Slots

Female

Locking Lugs

Figure 8 - Vent Pipe Connections

pages 10 through 13 show different configura-

tions for venting with horizontal termination that

will help you decide which application best suits

your installation. Check to see if wall studs or

roof rafters are in the path of your desired vent-

ing route. If they are, you may want to adjust the

location of the fireplace.

2. Direct vent pipe sections and components are

Vent Opening

Combustible Wall

10"

10"

10" Inside Framing

designed with special twist-lock connections.

(Framing

Twist-Lock Procedure: The female ends of

Vent Opening

Detail)

the pipes have locking lugs (indentations).

These lugs will slide straight into matching

slots on the male ends of adjacent pipes. Push

pipe sections together and twist one section

clockwise approximately one-quarter turn

until the sections are fully locked (see Figure

8). Note: Horizontal runs of vent must be

supported every three feet. Use wall straps

for this purpose.

3. Use a 45° elbow to connect venting system

to fireplace flue collar. The elbow is designed

to be twist-locked onto the flue collar as

described in step 2. IMPORTANT: Do not

attempt to alter the configuration of the elbow

by cutting, twisting, bending, etc.

4. Assemble the desired combination of pipe and

elbows to the fireplace flue collar. If there are

long portions of venting run, pre-assembled

pipe sections may be installed as subassem-

blies for convenience.

Noncombustible Wall

7 3/4"

Center of

Hole

Figure 9 - Vent Opening Requirements

111251-01Ewww.desatech.com

Image 9
Contents What to do if YOU Smell GAS Safety Information Table of ContentsSafety Information Local Codes Product FeaturesProduct Identification High traffic areasPre-Installation Preparation Location and space requirementsProper clearances must be maintained Framing and finishing ClearancesFront Top of Standoffs Vent See venting Venting clearancesBalcony with Perpendicular Side Wall Location of Termination CapInstallation Precautions Venting Installation InstructionsInstallation Planning Installing Horizontal Vent Cap Noncombustible Exterior 32 min Ground Floor InstallationRecommended Applications Corner ground floor installation Snorkel Termination InstallationHorizontal System Installation Using TWO 90 Elbows Installation for vertical termination Flat Ceiling InstallationConnect a section of pipe and extend up through the hole Twist-lock the vent cap onto the last section of vent pipe Vertical Venting High Altitude InstallationDesa Elbows Desa Venting AccessoriesDesa Terminations Number DescriptionInstalling optional blower accessories Fireplace InstallationModel BK Installation Check GAS TypePlug in blower power cord to duplex outlet Model BKT InstallationInstalling Gas Piping to Fireplace Location Blower Wiring DiagramInstallation Items Needed Checking GAS Connections Connecting Fireplace to GAS SupplyTest Pressures Equal To or Less Than Psig 3.5 kPa Pressure Testing Fireplace Gas ConnectionsRemoving/Replacing Glass Door Cleaning Glass DoorRemoving Louver Panels Removing Glass DoorClose top and bottom louvers Installing logs, lava rock and glowing embersInstalling Log No Optional Remote control Installation model WRC Wall Switch InstallationOpen lower louver panel of firebox Wiring Diagram Pilot GasLine For your safety Read before lighting Operating FireplaceLighting Instructions To Turn OFF GAS To Appliance Inspecting BurnersOptional Remote Operation Burner Flame PatternGlass Door Cleaning MaintenancePilot and burners LogsTroubleshooting Cleaning and MaintenanceObserved Problem Possible Cause Remedy Venting systemGas leak. See Warning Improper log placement Tery power is low RemoteClean out air holes at burner Glass soots Flame impingement on logsIllustrated Parts Breakdown Parts List Illustrated Parts Breakdown KEY Description Service Hints Replacement PartsTechnical Service SpecificationsAccessories Warranty Information Keep this WarrantyLimited Warranty DIRECT-VENT Fireplace