Desa CSDPBN, CSDBN General Venting, Installing Rear Cover, Location of Vent Termination

Page 10

10

STOVE AND BURNER SYSTEM ASSEMBLY

Installing Rear Cover

GENERAL VENTING

Location of Vent Termination

STOVE AND BURNER

SYSTEM ASSEMBLY

Continued

INSTALLING REAR COVER

1.Place rear cover behind stove body. Rear cover will rest on the bottom ledge of the stove body.

2.Place wire harness from ON/OFF switch under the cast of stove body.

3.Using hex screws provided, attach rear cover to back of stove body. See Figure 21. IMPORTANT: This rear cover must be securely in place before venting pipes are installed.

4.Open lower door panel. The valve is attached to the underside of the burner system assembly.

5.Connect one terminal of the wire from ON/OFF switch to the THTP terminal on the valve. Connect remaining wire terminal to the TH terminal on the valve. Make sure that the wire terminals are in the positions on the unit as pictured in Figure 22. If wires are not connected as shown, the ON/OFF switch will not work.

6.Move stove to desired installation location. See Location and Space Requirements, page 4 for proper installation. Refer to step 17 under Safety Information, page 3, for acceptable floor- ing types.

7.Connect or reconnect gas supply, see Connecting Stove/Burner System to Gas Supply on page 21.

WARNING: A qualified installer or service per- son must connect fireplace to gas supply. Follow all local codes.

Hex Screws

 

ON/OFF Switch

 

 

Rear Cover

 

 

(Shown with

 

 

Optional

ON/OFF

Blower

Blower)

 

Power

 

Switch Wire

 

Cord

 

Harness

 

 

 

Figure 21 - Installing Rear Cover (Shown with Optional Blower Accessory)

To Control

Switch

TPTH TP TH

Figure 22 - Control Valve Terminals

GENERAL VENTING

Your stove with burner system is approved to be vented either through the side wall, or vertically using the following guidelines:

Use only venting components or kits specifically approved for use with this stove and burner system (see Parts Lists for Vent- ing Kits and Components, page 19).

IMPORTANT: Do not mix venting components made by differ- ent manufacturers.

Minimum clearance between vent pipes and combustible mate- rials is 1" (2.5 cm), except where stated otherwise.

Do not recess venting terminations into a wall or siding.

Install horizontal venting with a 1/4" rise for every 12" of run toward the termination.

You may paint the vent termination with 450ºF (232ºC) heat- resistant paint to coordinate with the exterior finish.

There must not be any obstruction such as bushes, garden sheds, fences, decks, or utility buildings within 24" from the front of the termination cap.

Do not locate termination cap where excessive snow or ice build up may occur. Be sure to clear vent termination area after snow falls to prevent accidental blockage of venting system. When using snow blowers, do not direct snow towards vent termina- tion area.

You must maintain minimum wall and ceiling clearances shown in Figures 3 and 4, page 5.

If installing horizontal vent termination cap on an exterior wall with siding, you must us a vinyl siding standoff (see Figure 29, page 14).

LOCATION OF VENT TERMINATION

When locating vent termination, it is important to observe the minimum clearances shown in Figure 23, page 11.

*Check with local codes or with the current CAN/CSA B149[.1 or .2] Installation Codes for Canada or the USA Installations follow the current National Fuel Gas Code, ANSI Z223.1/NFPA 54.

For..com

111739-01A

Image 10
Contents For Your Safety OWNER’S Operation and Installation ManualFor Your Safety What to do if YOU Smell GAS Table of Contents Safety InformationProduct Identification ON/OFFLocal Codes PRE-INSTALLATION Preparation Product FeaturesGlossary of Terms Stove and Burner System Assembly PRE-INSTALLATION PreparationUnpacking Stove Installing Optional Blower Accessory REMOVING/REPLACING Doors and GlassOperating mode Thermostat Blower Only Attach thermal switch and bracketAngle see . This will allow thermal switch to be Place the green ground wire between the bottom hole onInstalling PROPANE/LP Conversion KIT Burner, Main Burner Orifice, and Pilot Orifice ConversionConversion Labeling and Placement Gas Control Valve ConversionGeneral Venting Installing Rear CoverLocation of Vent Termination General Venting Installation Precautions Venting InstallationInstallation Planning Installation for Horizontal Termination Installing Vent System in a ChaseInstalling Horizontal Vent Cap Noncombustible Exterior Horizontal Venting Horizontal Termination ConfigurationsVenting with Two 90 Elbows Installation for Vertical Termination Flat Ceiling InstallationVertical Termination Configurations Cathedral Ceiling InstallationVenting with One 90 Elbow Vertical Venting Configuration Using Two 90 Elbows ElbowsVertical Venting High Altitude InstallationParts Lists for Venting Kits and Components Number DescriptionInstallation Items Needed Stove and Burner System InstallationInstalling GAS Piping to STOVE/ Burner System Location Check GAS TypePressure Testing Gas Supply Piping System Connecting STOVE/BURNER System to GAS SupplyChecking GAS Connections Installing Optional Wall Mount Switch GWMS2 Pressure Testing Burner System Gas ConnectionsInstalling Optional Wall Mounted Thermostat GWMT1 Installing Remote Receiver and 9-volt Alkaline BatteryInstalling LOGS, Lava Rock and Glowing Embers Remove glass door. See Removing/Replacing Glass Door,Operating Stove with Burner System For Your Safety Read Before LightingLighting Instructions Optional HAND-HELD Remote Operation Manual Lighting ProcedureTo Turn OFF GAS To Appliance Shutting Off Burners Only pilot stays litSafety Features Manual ModeAuto Thermostatic Mode ON/OFF Series Model GhrcbInspecting Burners Operating Optional Blower AccessoryPilot Assembly Operating Optional GWMT1 Wall Mounted ThermostatPilot and Burners Cleaning and MaintenanceGlass Door LogsTroubleshooting Observed Problem Possible CauseInlet gas pressure is too low Improper vent configurationOrifice CompanyGas leak. See Warning statement AboveReplacement Parts SpecificationsWiring Diagram Parts Under WarrantyIllustrated Parts Breakdown Model SdvbncParts List KEY Part Number DescriptionStove Chassis Models Csdbn and Csdpbn Stove Chassis KEY Part Number Csdbn Csdpbn Description QTYService Hints Technical ServiceAccessories Owners Registration Form Postage Required 111739-01A Warranty Information

CSDBN, CSDPBN specifications

Desa CSDPBN and CSDBN represent cutting-edge advancements in the realm of community-driven development and data-centric governance. These initiatives are designed to empower local communities by integrating technology with robust administration strategies to enhance public service delivery, economic development, and social welfare.

One of the main features of Desa CSDPBN is its focus on participatory governance, allowing community members to actively engage in decision-making processes. This framework encourages transparency and accountability, enabling citizens to voice their needs and priorities while fostering a sense of ownership over local projects. Such involvement helps create tailored solutions that effectively address the specific challenges faced by the community.

Technologically, Desa CSDPBN leverages an array of digital tools that facilitate real-time data collection and analysis. This includes geographic information systems (GIS) and mobile application development to gather insights on resource allocation, infrastructure needs, and demographic information. By employing data analytics, local governments can make informed decisions that enhance resource distribution and service delivery.

The characteristics of CSDPBN and CSDBN systems also extend to their adaptability and scalability. These frameworks are designed to be flexible, allowing them to be replicated across different regions with varying socio-economic contexts. This scalability ensures that diverse communities can benefit from the same foundational principles while customizing aspects to suit their unique environments.

Further enhancing their effectiveness, both initiatives incorporate capacity-building efforts aimed at training local leaders and stakeholders in the use of technology and project management. Such educational components empower communities to sustain development initiatives while fostering local expertise.

Additionally, the integration of social media and online platforms within the Desa CSDPBN framework promotes civic engagement and collaboration among community members. This connectivity nurtures a sense of unity and collective responsibility while improving communication between citizens and local authorities.

Ultimately, Desa CSDPBN and CSDBN embody a holistic approach to community development by harmonizing technology, governance, and citizen participation. They represent a transformative model that not only addresses immediate development needs but also lays the groundwork for sustainable growth and resilience in local communities. As these practices gain traction, they pave the way for a more equitable and inclusive future, where every voice contributes to the narrative of progress.