Desa CSDBN PRE-INSTALLATION Preparation, Stove and Burner System Assembly, Unpacking Stove

Page 5

PRE-INSTALLATION

PREPARATION

Continued

3.Proper clearances must be maintained, see Figures 3 and 4.

4.This stove is a freestanding unit designed to set directly on the floor. If your stove is to be installed directly on carpeting, vi- nyl tile, or any combustible material other than wood, it must be installed on a metal or wood panel extending the full width and depth of the stove. See Figure 5.

PRE-INSTALLATION PREPARATION

5

Location and Space Requirements (Cont.)

STOVE AND BURNER SYSTEM ASSEMBLY

 

Unpacking Stove

 

 

 

26 1/2"

(67.31 cm)

Front

19"

(48.26 cm)

Ceiling

42"

(106.68 cm)

36"

(91.44 cm)

from

Front

4"

(10.16 cm)

from

27"

Back

Figure 5 - Stove With Burner System Bottom Dimensions

STOVE AND BURNER

SYSTEM ASSEMBLY

UNPACKING STOVE

1.

Lift off corrugated box enclosing stove body crating.

2.

Remove screws fastening back and top of wood frame enclo-

 

sure. Two or more people must carefully lift stove up and out

 

of wooden crate.

3.

Remove plastic bag from stove body.

4.

Remove bubble-wrapped log set from stove (Doors must be re-

Wall

(68.58 cm)

moved to do this step. See Removing/Replacing Doors and Glass,

page 6). Remove all protective packaging applied for shipment.

5. Check all items for any shipping damage. If damaged, promptly

Floor

29"

(73.66 cm)

inform dealer where you bought heater. Some fiber flakes may

fall from logs. This is acceptable.

4"

(10.16 cm

6"

(15.24 cm)

Front

Figure 3 - Clearances for Standard Installation

6.Locate the product identification label on the back panel (see Figure 6) and record the model number and 7 digit serial num- ber in the space provided in the back of this owner’s manual, and on the owner's registration form, page 39. Retain this opera- tion and installation manual for future reference and warranty.

7.Place freestanding stove near desired location in room.

STOVE

Top of

TOP

Wood

 

Frame

 

Enclosure

4"

(10.16

cm)

 

STOVE

 

BACK

4"

Product

(10.16

cm)

Identification

 

Label

Back of Wood

Frame

Enclosure

Figure 4 - Clearance for Corner Installation

Figure 4 - Unpacking Stove from Wooden Shipping Enclosure

For morevisit www..com

111739-01A

Image 5
Contents For Your Safety What to do if YOU Smell GAS OWNER’S Operation and Installation ManualFor Your Safety Safety Information Table of ContentsON/OFF Product IdentificationGlossary of Terms PRE-INSTALLATION Preparation Product FeaturesLocal Codes Unpacking Stove PRE-INSTALLATION PreparationStove and Burner System Assembly REMOVING/REPLACING Doors and Glass Installing Optional Blower AccessoryAngle see . This will allow thermal switch to be Thermostat Blower Only Attach thermal switch and bracketOperating mode Place the green ground wire between the bottom hole onBurner, Main Burner Orifice, and Pilot Orifice Conversion Installing PROPANE/LP Conversion KITGas Control Valve Conversion Conversion Labeling and PlacementLocation of Vent Termination Installing Rear CoverGeneral Venting General Venting Installation Planning Venting InstallationInstallation Precautions Installing Vent System in a Chase Installation for Horizontal TerminationInstalling Horizontal Vent Cap Noncombustible Exterior Venting with Two 90 Elbows Horizontal Termination ConfigurationsHorizontal Venting Flat Ceiling Installation Installation for Vertical TerminationVenting with One 90 Elbow Cathedral Ceiling InstallationVertical Termination Configurations Elbows Vertical Venting Configuration Using Two 90 ElbowsParts Lists for Venting Kits and Components High Altitude InstallationVertical Venting Number DescriptionInstalling GAS Piping to STOVE/ Burner System Location Stove and Burner System InstallationInstallation Items Needed Check GAS TypeChecking GAS Connections Connecting STOVE/BURNER System to GAS SupplyPressure Testing Gas Supply Piping System Pressure Testing Burner System Gas Connections Installing Optional Wall Mount Switch GWMS2Installing Remote Receiver and 9-volt Alkaline Battery Installing Optional Wall Mounted Thermostat GWMT1Remove glass door. See Removing/Replacing Glass Door, Installing LOGS, Lava Rock and Glowing EmbersLighting Instructions For Your Safety Read Before LightingOperating Stove with Burner System To Turn OFF GAS To Appliance Manual Lighting ProcedureOptional HAND-HELD Remote Operation Shutting Off Burners Only pilot stays litAuto Thermostatic Mode Manual ModeSafety Features ON/OFF Series Model GhrcbPilot Assembly Operating Optional Blower AccessoryInspecting Burners Operating Optional GWMT1 Wall Mounted ThermostatGlass Door Cleaning and MaintenancePilot and Burners LogsObserved Problem Possible Cause TroubleshootingOrifice Improper vent configurationInlet gas pressure is too low CompanyAbove Gas leak. See Warning statementWiring Diagram SpecificationsReplacement Parts Parts Under WarrantyModel Sdvbnc Illustrated Parts BreakdownKEY Part Number Description Parts ListStove Chassis Models Csdbn and Csdpbn KEY Part Number Csdbn Csdpbn Description QTY Stove ChassisAccessories Technical ServiceService Hints Owners Registration Form Postage Required 111739-01A Warranty Information

CSDBN, CSDPBN specifications

Desa CSDPBN and CSDBN represent cutting-edge advancements in the realm of community-driven development and data-centric governance. These initiatives are designed to empower local communities by integrating technology with robust administration strategies to enhance public service delivery, economic development, and social welfare.

One of the main features of Desa CSDPBN is its focus on participatory governance, allowing community members to actively engage in decision-making processes. This framework encourages transparency and accountability, enabling citizens to voice their needs and priorities while fostering a sense of ownership over local projects. Such involvement helps create tailored solutions that effectively address the specific challenges faced by the community.

Technologically, Desa CSDPBN leverages an array of digital tools that facilitate real-time data collection and analysis. This includes geographic information systems (GIS) and mobile application development to gather insights on resource allocation, infrastructure needs, and demographic information. By employing data analytics, local governments can make informed decisions that enhance resource distribution and service delivery.

The characteristics of CSDPBN and CSDBN systems also extend to their adaptability and scalability. These frameworks are designed to be flexible, allowing them to be replicated across different regions with varying socio-economic contexts. This scalability ensures that diverse communities can benefit from the same foundational principles while customizing aspects to suit their unique environments.

Further enhancing their effectiveness, both initiatives incorporate capacity-building efforts aimed at training local leaders and stakeholders in the use of technology and project management. Such educational components empower communities to sustain development initiatives while fostering local expertise.

Additionally, the integration of social media and online platforms within the Desa CSDPBN framework promotes civic engagement and collaboration among community members. This connectivity nurtures a sense of unity and collective responsibility while improving communication between citizens and local authorities.

Ultimately, Desa CSDPBN and CSDBN embody a holistic approach to community development by harmonizing technology, governance, and citizen participation. They represent a transformative model that not only addresses immediate development needs but also lays the groundwork for sustainable growth and resilience in local communities. As these practices gain traction, they pave the way for a more equitable and inclusive future, where every voice contributes to the narrative of progress.