Desa CSDBN, CSDPBN Installation for Horizontal Termination, Installing Vent System in a Chase

Page 13

VENTING INSTALLATION

Installation Planning (Cont.) Installation for Horizontal Termination

13

VENTING INSTALLATION

Continued

Installing Vent System in a Chase

A chase is a vertical box-like structure built to enclose venting that runs along the outside of a building. A chase is not required for such venting.

NOTICE: Treatment of firestops and construction of the chase may vary from building type to building type. These instructions are not substitutes for the requirements of local building codes. You must fol- low all local building codes.

Note: When installing in a chase, you should insulate the chase as you would the outside walls of your home. This is especially important in cold climates. Minimum air space clearance between vent pipes and combustible materials and/or insulation is 1" (2.54 cm).

INSTALLATION FOR HORIZONTAL TERMINATION

CAUTION: Horizontally terminated venting con- figurations require one foot of vertical rise from the 45° elbow before any horizontal run can be made. Failure to meet venting requirements may cause performance problems and possible damage to the fireplace.

1.Determine the route your horizontal venting will take. Note: The location of the horizontal vent termination on the exterior wall must meet all local and national building codes and must not be blocked or obstructed.

WARNING: Do not recess vent terminal into a wall or siding.

Snorkel terminations are available for terminations requiring a vertical rise on the exterior of the building (see Figures 24 and 25). Snorkel kit VKS-47-K is also available (see page 19). Fol- low the same installation procedures used for standard horizon- tal termination with the exception of the external wall firestop. The snorkel termination does not require the use of the external wall firestop. If installing the snorkel termination below grade (basement applications), you must provide proper drainage to prevent water from entering the snorkel termination (see Figure 25). Do not back fill around the snorkel termination.

2.Vent pipes and fittings have special twist-lock connections. As- semble the desired combination of pipe and elbows to the appli- ance adaptor with pipe seams oriented towards the wall or floor.

Twist-lock Procedure: The female ends of the pipes and fittings have four locking lugs (indentations). These lugs will slide straight into matching slots on the male ends of adjacent pipes and fit- tings. (All connections must be sealed with high temperature sili- cone sealant as specified in the second warning statement on page 12.) Push the pipe sections together and twist one section clock- wise approximately one-quarter turn until the sections are fully locked. See Figure 26. Note: Horizontal runs of vent must be supported every three feet. Use wall straps for this purpose.

Snorkel

12" Minimum

(30.5cm)

Figure 24 - Snorkel Termination

Snorkel

12" Minimum

(30.5cm)

Adequate drainage

Figure 25 - Snorkel Termination with Drainage Pipe

Female

Locking Lugs

Male

Slots

Vent Pipe

Figure 26 - Vent Pipe Connections

For morevisit www..com

111739-01A

Image 13
Contents For Your Safety OWNER’S Operation and Installation ManualFor Your Safety What to do if YOU Smell GAS Safety Information Table of ContentsON/OFF Product IdentificationLocal Codes PRE-INSTALLATION Preparation Product FeaturesGlossary of Terms Stove and Burner System Assembly PRE-INSTALLATION PreparationUnpacking Stove REMOVING/REPLACING Doors and Glass Installing Optional Blower AccessoryAngle see . This will allow thermal switch to be Thermostat Blower Only Attach thermal switch and bracketOperating mode Place the green ground wire between the bottom hole onBurner, Main Burner Orifice, and Pilot Orifice Conversion Installing PROPANE/LP Conversion KITGas Control Valve Conversion Conversion Labeling and PlacementGeneral Venting Installing Rear CoverLocation of Vent Termination General Venting Installation Precautions Venting InstallationInstallation Planning Installing Vent System in a Chase Installation for Horizontal TerminationInstalling Horizontal Vent Cap Noncombustible Exterior Horizontal Venting Horizontal Termination ConfigurationsVenting with Two 90 Elbows Flat Ceiling Installation Installation for Vertical TerminationVertical Termination Configurations Cathedral Ceiling InstallationVenting with One 90 Elbow Elbows Vertical Venting Configuration Using Two 90 ElbowsParts Lists for Venting Kits and Components High Altitude InstallationVertical Venting Number DescriptionInstalling GAS Piping to STOVE/ Burner System Location Stove and Burner System InstallationInstallation Items Needed Check GAS TypePressure Testing Gas Supply Piping System Connecting STOVE/BURNER System to GAS SupplyChecking GAS Connections Pressure Testing Burner System Gas Connections Installing Optional Wall Mount Switch GWMS2Installing Remote Receiver and 9-volt Alkaline Battery Installing Optional Wall Mounted Thermostat GWMT1Remove glass door. See Removing/Replacing Glass Door, Installing LOGS, Lava Rock and Glowing EmbersOperating Stove with Burner System For Your Safety Read Before LightingLighting Instructions To Turn OFF GAS To Appliance Manual Lighting ProcedureOptional HAND-HELD Remote Operation Shutting Off Burners Only pilot stays litAuto Thermostatic Mode Manual ModeSafety Features ON/OFF Series Model GhrcbPilot Assembly Operating Optional Blower AccessoryInspecting Burners Operating Optional GWMT1 Wall Mounted ThermostatGlass Door Cleaning and MaintenancePilot and Burners LogsObserved Problem Possible Cause TroubleshootingOrifice Improper vent configurationInlet gas pressure is too low CompanyAbove Gas leak. See Warning statementWiring Diagram SpecificationsReplacement Parts Parts Under WarrantyModel Sdvbnc Illustrated Parts BreakdownKEY Part Number Description Parts ListStove Chassis Models Csdbn and Csdpbn KEY Part Number Csdbn Csdpbn Description QTY Stove ChassisService Hints Technical ServiceAccessories Owners Registration Form Postage Required 111739-01A Warranty Information

CSDBN, CSDPBN specifications

Desa CSDPBN and CSDBN represent cutting-edge advancements in the realm of community-driven development and data-centric governance. These initiatives are designed to empower local communities by integrating technology with robust administration strategies to enhance public service delivery, economic development, and social welfare.

One of the main features of Desa CSDPBN is its focus on participatory governance, allowing community members to actively engage in decision-making processes. This framework encourages transparency and accountability, enabling citizens to voice their needs and priorities while fostering a sense of ownership over local projects. Such involvement helps create tailored solutions that effectively address the specific challenges faced by the community.

Technologically, Desa CSDPBN leverages an array of digital tools that facilitate real-time data collection and analysis. This includes geographic information systems (GIS) and mobile application development to gather insights on resource allocation, infrastructure needs, and demographic information. By employing data analytics, local governments can make informed decisions that enhance resource distribution and service delivery.

The characteristics of CSDPBN and CSDBN systems also extend to their adaptability and scalability. These frameworks are designed to be flexible, allowing them to be replicated across different regions with varying socio-economic contexts. This scalability ensures that diverse communities can benefit from the same foundational principles while customizing aspects to suit their unique environments.

Further enhancing their effectiveness, both initiatives incorporate capacity-building efforts aimed at training local leaders and stakeholders in the use of technology and project management. Such educational components empower communities to sustain development initiatives while fostering local expertise.

Additionally, the integration of social media and online platforms within the Desa CSDPBN framework promotes civic engagement and collaboration among community members. This connectivity nurtures a sense of unity and collective responsibility while improving communication between citizens and local authorities.

Ultimately, Desa CSDPBN and CSDBN embody a holistic approach to community development by harmonizing technology, governance, and citizen participation. They represent a transformative model that not only addresses immediate development needs but also lays the groundwork for sustainable growth and resilience in local communities. As these practices gain traction, they pave the way for a more equitable and inclusive future, where every voice contributes to the narrative of progress.