Desa CSDPBN, CSDBN installation manual Vertical Venting Configuration Using Two 90 Elbows

Page 18

18

VENTING INSTALLATION

Installation for Vertical Termination (Cont.)

VENTING INSTALLATION

Continued

Venting with Two 90° Elbows

 

Venting with Two

Vertical (V)

Horizontal (H1) +

 

 

90° Elbows

 

Horizontal (H2)

Vertical (V1)

Horizontal (H)

5' min. (1.52 m)

2' max. (0.61 m)

5' min. (1.52 m)

6' max. (1.83 m)

6' min. (1.83 m)

4' max. (1.22 m)

6' min. (1.83 m) 12' max. (3.66 m)

7' min. (2.13 m)

6' max. (1.83 m)

7' min. (2.13 m) 18' max. (5.49 m)

8' min. (2.44 m)

8' max. (2.44 m)

8' min. (2.44 m)

20' max. (6.1 m)

20' max. (6.1 m)

8' max. (2.44 m)

Note: Vertical (V1) +

 

 

 

 

 

 

Vertical

(V2) = 20' max.

 

Note: Install restrictor

 

 

 

 

into 4" (10.16 cm)

 

 

 

 

collar of burner

 

 

 

 

system as shown.

 

 

 

 

 

 

Note: Install restrictor

 

 

 

into 4" (10.16 cm)

 

 

 

collar of burner

 

 

 

system as shown.

Figure 39 - Vertical Venting Configuration Using Two 90° Elbows with Two Horizontal Runs

Figure 40 - Vertical Venting Configuration Using Two 90° Elbows

For..com

111739-01A

Image 18
Contents OWNER’S Operation and Installation Manual For Your SafetyFor Your Safety What to do if YOU Smell GAS Table of Contents Safety InformationProduct Identification ON/OFFPRE-INSTALLATION Preparation Product Features Local CodesGlossary of Terms PRE-INSTALLATION Preparation Stove and Burner System AssemblyUnpacking Stove Installing Optional Blower Accessory REMOVING/REPLACING Doors and GlassOperating mode Thermostat Blower Only Attach thermal switch and bracketAngle see . This will allow thermal switch to be Place the green ground wire between the bottom hole onInstalling PROPANE/LP Conversion KIT Burner, Main Burner Orifice, and Pilot Orifice ConversionConversion Labeling and Placement Gas Control Valve ConversionInstalling Rear Cover General VentingLocation of Vent Termination General Venting Venting Installation Installation PrecautionsInstallation Planning Installation for Horizontal Termination Installing Vent System in a ChaseInstalling Horizontal Vent Cap Noncombustible Exterior Horizontal Termination Configurations Horizontal VentingVenting with Two 90 Elbows Installation for Vertical Termination Flat Ceiling InstallationCathedral Ceiling Installation Vertical Termination ConfigurationsVenting with One 90 Elbow Vertical Venting Configuration Using Two 90 Elbows ElbowsVertical Venting High Altitude InstallationParts Lists for Venting Kits and Components Number DescriptionInstallation Items Needed Stove and Burner System InstallationInstalling GAS Piping to STOVE/ Burner System Location Check GAS TypeConnecting STOVE/BURNER System to GAS Supply Pressure Testing Gas Supply Piping SystemChecking GAS Connections Installing Optional Wall Mount Switch GWMS2 Pressure Testing Burner System Gas ConnectionsInstalling Optional Wall Mounted Thermostat GWMT1 Installing Remote Receiver and 9-volt Alkaline BatteryInstalling LOGS, Lava Rock and Glowing Embers Remove glass door. See Removing/Replacing Glass Door,For Your Safety Read Before Lighting Operating Stove with Burner SystemLighting Instructions Optional HAND-HELD Remote Operation Manual Lighting ProcedureTo Turn OFF GAS To Appliance Shutting Off Burners Only pilot stays litSafety Features Manual ModeAuto Thermostatic Mode ON/OFF Series Model GhrcbInspecting Burners Operating Optional Blower AccessoryPilot Assembly Operating Optional GWMT1 Wall Mounted ThermostatPilot and Burners Cleaning and MaintenanceGlass Door LogsTroubleshooting Observed Problem Possible CauseInlet gas pressure is too low Improper vent configurationOrifice CompanyGas leak. See Warning statement AboveReplacement Parts SpecificationsWiring Diagram Parts Under WarrantyIllustrated Parts Breakdown Model SdvbncParts List KEY Part Number DescriptionStove Chassis Models Csdbn and Csdpbn Stove Chassis KEY Part Number Csdbn Csdpbn Description QTYTechnical Service Service HintsAccessories Owners Registration Form Postage Required 111739-01A Warranty Information

CSDBN, CSDPBN specifications

Desa CSDPBN and CSDBN represent cutting-edge advancements in the realm of community-driven development and data-centric governance. These initiatives are designed to empower local communities by integrating technology with robust administration strategies to enhance public service delivery, economic development, and social welfare.

One of the main features of Desa CSDPBN is its focus on participatory governance, allowing community members to actively engage in decision-making processes. This framework encourages transparency and accountability, enabling citizens to voice their needs and priorities while fostering a sense of ownership over local projects. Such involvement helps create tailored solutions that effectively address the specific challenges faced by the community.

Technologically, Desa CSDPBN leverages an array of digital tools that facilitate real-time data collection and analysis. This includes geographic information systems (GIS) and mobile application development to gather insights on resource allocation, infrastructure needs, and demographic information. By employing data analytics, local governments can make informed decisions that enhance resource distribution and service delivery.

The characteristics of CSDPBN and CSDBN systems also extend to their adaptability and scalability. These frameworks are designed to be flexible, allowing them to be replicated across different regions with varying socio-economic contexts. This scalability ensures that diverse communities can benefit from the same foundational principles while customizing aspects to suit their unique environments.

Further enhancing their effectiveness, both initiatives incorporate capacity-building efforts aimed at training local leaders and stakeholders in the use of technology and project management. Such educational components empower communities to sustain development initiatives while fostering local expertise.

Additionally, the integration of social media and online platforms within the Desa CSDPBN framework promotes civic engagement and collaboration among community members. This connectivity nurtures a sense of unity and collective responsibility while improving communication between citizens and local authorities.

Ultimately, Desa CSDPBN and CSDBN embody a holistic approach to community development by harmonizing technology, governance, and citizen participation. They represent a transformative model that not only addresses immediate development needs but also lays the groundwork for sustainable growth and resilience in local communities. As these practices gain traction, they pave the way for a more equitable and inclusive future, where every voice contributes to the narrative of progress.