Desa UNVENTED (VENT-FREE) NATURAL GAS FIREPLACE Installing, Continued, Crossover Log #3

Page 21
Figure 23 - Installing Crossover Log

INSTALLING

Continued

3.Place crossover log (#3) into place (see Figure 23). Be sure to place back of crossover log into notch on left side of rear log. The indentation under front left fork of crossover log must rest on rectangular knob of front log.

Crossover Log (#3)

Figure 23 - Installing Crossover Log

4.Place left front branch (#4) and right front branch (#5) into place (see Figure 24). Make sure notches on bottom rest on grates.

Left Front Branch (#4)

Notches

Right Front Branch (#5)

Notches

Figure 24 - Installing Left Front Branch and Right Front Branch

Continued

101742

21

Image 21
Contents OWNER’S OPERATION AND INSTALLATION MANUAL Save this manual for future referenceUNVENTED VENT-FREENATURAL GAS FIREPLACE WARNINGS CONTENTS SAFETY INFORMATIONDANGER Safety Information continues on next pageSAFETY INFORMATIONContinued PRODUCT IDENTIFICATION Figure 1 - Log Base AssemblyFigure 2 - Fireplace Safety Device LOCAL CODES UNPACKING PRODUCT FEATURESOperation Piezo Ignition SystemPROVIDING ADEQUATE VENTILATION AIR FOR COMBUSTION AND VENTILATIONVENTILATION AIR FORCOMBUSTION ContinuedContinued AIR FOR COMBUSTION AND VENTILATIONVENTILATION AIR Ventilation Air from Inside BuildingINSTALLING NOTICEContinued INSTALLING ContinuedASSEMBLING AND ATTACHING BRASS TRIM INSTALLATION CLEARANCES INSTALLINGContinued CONVENTIONAL FIREPLACE INSTALLATIONINSTALLING Continuedheads and putty over BUILT-INFIREPLACE INSTALLATION INSTALLINGContinued ContinuedFigure 13 - Attaching Nailing Flange Accessory INSTALLINGContinued 39 3/8 27 7/8 35 1/2 55 5/8Mantel Clearances for Built-InInstallation INSTALLINGContinued ContinuedINSTALLING GAS PIPING TO FIREPLACE LOCATION INSTALLINGInstallation Items Needed NOTICECONNECTING FIREPLACE TO GAS SUPPLY INSTALLINGInstallation Items Needed ContinuedINSTALLING G 001WARNINGNOTICE ContinuedPressure Testing Fireplace Gas Connections INSTALLINGContinued ContinuedINSTALLING LOGS INSTALLINGFigure 21 - Installing Rear Log Figure 22 - Installing Front LogFigure 23 - Installing Crossover Log INSTALLINGContinued ContinuedOPERATING FIREPLACE FOR YOUR SAFETY READ BEFORE LIGHTINGINSTALLING ContinuedFIREPLACE OPERATINGNOTICE LIGHTING INSTRUCTIONSTO TURN OFF GAS TO APPLIANCE MANUAL LIGHTING PROCEDUREVARIABLE OUTPUT CONTROL OPERATION OPERATING FIREPLACEBURNERS INSPECTINGNOTICE PILOT FLAME PATTERNCLEANING AND MAINTENANCE TROUBLE SHOOTING ODS/PILOT AND BURNERSLOGS Cleaning and Mainte TROUBLE- SHOOTINGContinued ContinuedCleaning and Mainte TROUBLE SHOOTINGCleaning and Mainte Cleaning and MainteSHOOTING TROUBLEContinued leaks see Checking GasREPLACEMENT PARTS SPECIFICATIONS TECHNICAL SERVICE SERVICE HINTSWhen gas pressure is too low When gas quality is badCABINET MANTEL GMC11F - Walnut Finished ACCESSORIESGMC12U - Unfinished HEARTH BASE GC3333F- Walnut FinishedILLUSTRATED Log Base AssemblyPARTS BREAKDOWNLog Base Assembly PARTS LISTPART NUMBER DESCRIPTIONILLUSTRATED FireplacePARTS BREAKDOWNFireplace PARTS LISTPART NUMBER DESCRIPTIONWARRANTY INFORMATION LIMITED WARRANTY VENT-FREENATURAL GAS FIREPLACEKEEP THIS WARRANTY