Locating Your Gas Fireplace

 

 

E

A

B

 

Y

 

 

 

 

 

 

 

 

C

X

 

Y

 

D

 

 

 

 

 

 

 

X

 

 

 

F

 

 

 

 

 

LU584-3

Fig. 1

Locate gas fireplace.

 

A)

Flat on wall

B)

Cross corner

C)

**Island

D)

*Room divider

E)

*Flat on wall corner

F)

Chase installation

Y)

6" minimum

 

 

 

 

NOTE (Fig. 1):

**Island (C) and Room Divider (D) installation is possible as long as the horizontal portion of the vent system (X) does not exceed 20' (6m). See details in Venting Section.

* When you install your CFM Corporation fireplace in (D) Room divider or (E) Flat on wall corner positions (Y), a minimum of 6" (153mm) clearance must be maintained from the perpendicular wall and the front of the fireplace.

Clearance to Combustibles

Back

.............................................................. 0" (0 mm)

Side

0" (0 mm)

Floor

.............................................................. 0" (0 mm)

Top

0" (0 mm)

Flue

2" (51 mm) Top

..............................................

1" (25 mm) Sides/Bottom

Unit Assembly

The DVHVAC36 is shipped in three cartons. The first carton contains the fireplace cabinet. The second car- ton contains the air circulating blower section and the third carton contains the coil cabinet. Unpack all three sections before following the assembly instructions:

1.Place the air circulating blower section onto the left side of the fireplace cabinet. (Fig. 3)

2.Ensure the damper plate below the blower assembly works freely without binding. Rotate it downwards and ensure that it returns to a closed position.

3.Secure air circulating blower section to fireplace cabinet using 8 of the #8 screws provided.

4.Remove the access panel on the front of the air cir- culating blower section by removing the #10-24 nuts. Remove the jack plug from the air circulating blower motor by gently depressing tab.

DVHVAC36

5.Attach the metal conduit from the fireplace cabinet to the 7/8" diameter hole in the side of the air cir- culating blower section using the nut provided. Do not feed the two yellow wires which are outside the conduit through the hole. Insert the terminal on the white wire (common) into position 1 on the jack plug. Insert the terminal on the black wire (cooling speed) into position 2 on the jack plug. Insert the terminal on the red wire (heating speed), into position 3, 4 or 5 on the jack plug. If unsure, select position 4 on the jack plug for heating speed and adjust if necessary. If desired the speed selections can be changed later. Refer to Figure 8 Wiring Diagram.

WARNING: Ensure that all three wires are properly inserted into jack plug, even if an optional air condi- tioner is not to be used.

6.Reinstall jack plug into motor and replace access panel.

7.Place the coil cabinet section onto the right side of the fireplace cabinet so the access panel faces the front of the unit. (Fig. 3) Remove the access panel and secure the coil cabinet to the fireplace cabinet using 8 of the #8 screws provided.

8.Connect the 1/4" quick connect terminals of the two yellow wires from the fireplace cabinet to the high limit safety control located on the top of the coil cabi- net.

Blower Section

Coil Cabinet

Fireplace Cabinet

FP1399

Fig. 3 DVHVAC36 unit assembly.

10001195

5

Image 5
Contents Rear Direct Vent Model DVHVAC36 Table of Contents Please Review the Following Carefully Installation & Operating InstructionsDVHVAC36 Fireplace DimensionsClearance to Combustibles Unit AssemblyLocating Your Gas Fireplace Supply Air Duct Systems Framing and FinishingMantel Return Air PlenumFinal Finishing Gas Line InstallationHearth Gas Inlet & Manifold PressuresElectrical Specifications Typical gas supply installationLocation of Vent Termination ElectricalGeneral Venting General Venting Information Termination Location Canadian Installations1 US Installations2USA Installations Canadian InstallationsGeneral Information Assembling Vent Pipes Twist Lock PipesCorner Installation How to Use the Vent GraphRear Wall Installations Sidewall Venting GraphLocate vent opening on wall Vertical Sidewall Applications+ B = 17 5.2m Max Zero clearance sleeve is only required for combustible walls Vertical Sidewall InstallationsAlways install Horizontal vent Ing on a level Plane Below Grade InstallationVertical Through-the-Roof Applications Vertical Through-the-Roof InstallationTypical Ceil Twist Lock Venting Components Operating Instructions Flame Adjustment Setting Temperature RiseFlame Characteristics Lava RockInspecting the Venting System Ceramic Refractory InstallationInspecting the Venting/Heating Exchange System Mortar lines must be alignedWhat to do if YOU Smell GAS Lighting & Operating InstructionsTo Turn Off Gas To Heater SIT Nova 825 Millivolt Valve Troubleshooting the Gas Control SystemCleaning the Standing Pilot Control System MaintenanceDescription DVHVAC36DVHVAC36 Decorative Bay Window Optional AccessoriesDo not remove existing window frame as- sembly Remove all plastic from brass trimsDVHVAC36 Page Product Covered by this Warranty Limited Lifetime WarrantyAFUE% Efficiency Ratings