Vermont Casting DBR33, DBR39, DBR36 Termination Clearances, Rear Venting Applications

Page 10

Termination Clearances

Termination clearances for buildings with combustible and noncombustible exteriors.

Inside Corner

A =

A Combustible 6"(152mm)

Noncombustible

V2"(50mm)

Outside Corner

B = Combustible

6"(152mm)

VNoncombustible

B

Recessed Location

D

CC

E

V

Balcony -

Balcony -

with no side wall

with perpendicular side wall

G

V

G=

Combustible& Non-Combustible

12"(305mm)

H

V

J

Combustible & Non-Combustible

H = 24"(610mm)

J = 20"(508mm)

C = Maximum depth of 48" (1219mm) for recessed location.

D = Minimum width for back wall of a recessed location. Combustible 38"(965mm) Noncombustible 24"(610mm)

E = Clearance from corner in recessed location. Combustible 6"(152mm) Noncombustible 2"(50mm)

Fig. 13

REAR VENTING APPLICATIONS

Note:

It is not necessary to seal the vent pipe joints for any straight out the wall rear vent applications.

Note:

Vent Starter Kit Model 7DVRVT must be

used in straight out the wall rear vent applications.

Maximum Vent Length

20" (508mm)- Fig. 14

 

Minimum clearance between vent pipes and combustible materials is one (1") inch (25 mm) on sides and bottom and two (2") inch (50 mm) on top.

When vent termination exits through foundation less than 20" (508mm) below siding outcrop, the vent pipe must flush up with the siding. A 7DVSS must also be used.

 

20"

20"

 

508mm

508mm

 

45°

45°

20" (508mm)

 

 

TOP VIEW

TOP VIEW

TOP VIEW

CROSS CORNER VENT

CROSS CORNER VENT

 

 

TO THE LEFT.

TO THE RIGHT.

 

 

Fig. 14

- 10 -

 

 

Image 10
Contents Builder Rear Vent Direct Vent Table of Contents Installation Instructions Locating Your GAS FireplaceFireplace Dimensions DBR33Mantels Mantel Chart Clearance to CombustiblesFraming and Finishing Final Finishing GAS SpecificationsHearth GAS Line Installation Remote Switch Installation For RN/RPCrimped END Pipes Twist Lock PipesGeneral Venting Information Termination Clearances Rear Venting ApplicationsRear Wall Installations StepVertical Sidewall Applications HOW to USE the Vent Graph Vertical Sidewall Venting GraphVertical Sidewall Installation Vent Opening Noncombustible WallAlways install horizontal venting on a level plane Below Grade Installations Vertical Through Roof ApplicationsVertical Thru the Roof Installation Louvre Removal Glass CleaningGeneral Glass Information Glass Frame RemovalFlame Adjustment Installation of LogsEmber Material Placement Lava RockCleaning the Standing Pilot Control System Flame CharacteristicsMaintenance Inspecting the Venting SystemLighting and Operating Instructions Trouble Shooting the GAS Control System SIT 820 Nova Millivolt ValveHoneywell Millivolt Valve Replacement Parts List Rear Builder Series Replacement Parts Rear Builders Series Wiring Instructions Optional FAN KIT FK12 and FK24Optional BAY Window Installation Optional EB1 Receptacle Hook-UpOptional Ceramic Refractory Installation Optional Screen KIT InstallationOptional Remote Control Crimped Ends Venting Components Twist Lock Venting Components Page Limited Warranty & Extended Life Time Protection