Vermont Casting DBR36, DBR39, DBR33 installation instructions Crimped END Pipes, Twist Lock Pipes

Page 8

GENERAL INFORMATION ON ASSEMBLING

THE VENT PIPES

CRIMPED END PIPES

Before joining elbows and pipes apply a bead of high temperature sealant to crimped end of elbow or pipe. (Fig. 10).

Join pipes and secure joints with three (3) sheetmetal screws. (See Fig. 10) Wipe off excess sealant.

1" From crimped end of pipe

 

1''

 

Screw Holes

 

BEAD LOCATION

Fig. 10

 

CANADIAN INSTALLATION

The venting system must be installed in accordance with the current CAN/CGA-B149 (.1 or .2) installation code.

U.S.A. INSTALLATIONS:

The venting system must conform with local codes and/or the current National Fuel Gas Code, ANSI Z223.1.

Only venting components manufactured by The CFM Majestics Products Company may be used.

TWIST LOCK PIPES

When using twist lock pipe it is not necessary to use sealant at the twist lock joints.

The only areas of the venting that need to be sealed with high temperature silicone sealant are the collars on the fireplace and termination, and the sliding joint of any telescopic vent pipes used in the system.

To join the twist lock pipes together, simply align the beads of the male end with the grooves of the female end, then while bringing the pipes together, twist the pipe until the flange on the female end contacts the external flange on the male end.

It is recommended that you secure the joints with 3 sheet metal screws however this is not mandatory with twist lock pipe.

To make it easier to assemble the joints we suggest putting a lubricant (Vaseline or similar) on the male end of the twist lock pipe.

TWIST LOCK PIPE JOINT

Screw Holes

Fig. 11

- 8 -

Image 8
Contents Builder Rear Vent Direct Vent Table of Contents Installation Instructions Locating Your GAS FireplaceFireplace Dimensions DBR33Framing and Finishing Mantel Chart Clearance to CombustiblesMantels Hearth GAS SpecificationsFinal Finishing GAS Line Installation Remote Switch Installation For RN/RPCrimped END Pipes Twist Lock PipesGeneral Venting Information Termination Clearances Rear Venting ApplicationsRear Wall Installations StepVertical Sidewall Applications HOW to USE the Vent Graph Vertical Sidewall Venting GraphVertical Sidewall Installation Vent Opening Noncombustible WallAlways install horizontal venting on a level plane Below Grade Installations Vertical Through Roof ApplicationsVertical Thru the Roof Installation Glass Cleaning General Glass InformationLouvre Removal Glass Frame RemovalInstallation of Logs Ember Material PlacementFlame Adjustment Lava RockFlame Characteristics MaintenanceCleaning the Standing Pilot Control System Inspecting the Venting SystemLighting and Operating Instructions Trouble Shooting the GAS Control System SIT 820 Nova Millivolt ValveHoneywell Millivolt Valve Replacement Parts List Rear Builder Series Replacement Parts Rear Builders Series Wiring Instructions Optional FAN KIT FK12 and FK24Optional BAY Window Installation Optional EB1 Receptacle Hook-UpOptional Remote Control Optional Screen KIT InstallationOptional Ceramic Refractory Installation Crimped Ends Venting Components Twist Lock Venting Components Page Limited Warranty & Extended Life Time Protection