REAR WALL INSTALLATIONS
STEP 1
Locate vent opening on wall. To locate hole centre consult with appropriate fireplace dimensions, page 4. Frame as shown below.
Straight Out Thru the Wall Application
Vent Opening —
Combustible Wall
(240mm)
(framing detail)
Vent Opening —
Noncombustible Wall
Fig. 15
Combustible Walls. Cut a
STEP 2
Measure wall thickness and cut adjustable zero clearance sleeve parts to proper length (MAXIMUM 12"/305mm). Adjust sleeve to maximum
| #8 | |
Maximum Length | SCREWS(2) | |
12" (294mm) | ||
| ||
#8 | ADJUSTABLE | |
ZERO CLEARANCE | ||
SCREWS(2) | ||
SLEEVE | ||
| ||
| #8 | |
| SCREWS(2) | |
ADJUSTABLE ZERO | FIRESTOP | |
CLEARANCE SLEEVE |
| |
| Fig. 16 |
STEP 3
Measure from fireplace collar or elbow face to face of outside wall (add 2" for vent pipe overlap. Mark pipes and cut to length. It is very important that the two pipes are flush with the outside wall once the fireplace is in its final location.
ZERO |
CLEARANCE |
SLEEVE |
FIRESTOP |
Fig. 17 |
STEP 4
Slip 4" and 7" pipes onto respective flue collars. Make sure to fix to the fireplace collar the 4" pipe with three (3) screws before fixing the 7" pipe on the 7" collar. Both pipes must be on a level plane. Fig. 17.
STEP 5
Guide the vent termination 4" collar into the 4" pipe then the 7" collar into the 7" pipe. Do not force the venting into position. If the pipes do not line up with the termination collars, disassemble pipes and reattach to the fireplace collar. (Fig. 18)
STEP 6
Secure fireplace to floor through floor holes and adjustable frame drywall strip (nailing flange) to frame. (See Framing & Finishing Section)
FINISHED | VENT | |
WALL | ||
| ||
| Fig. 18 |
- 11 -