Vermont Casting DBR36, DBR39 Vent Opening Noncombustible Wall, Vertical Sidewall Installation

Page 14

VERTICAL SIDEWALL INSTALLATION

STEP 1

Locate vent opening on the wall. It may be necessary to first position the fireplace and measure to obtain hole location. Depending on whether the wall is combustible or non- combustible, cut opening to size. Fig. 25.

(For combustible walls first frame in opening).

VERTICAL SIDEWALL APPLICATION

Vent Opening —

Combustible Wall

(240mm) 9-3/8"

9-3/8" (240mm)

(framing detail)

Vent Opening —

Noncombustible Wall

7-1/2" (190mm)

COMBUSTIBLE WALLS (Fig. 25): Cut a 9-3/8"H x 9-3/8"W (240

mmx 240 mm) hole through the exterior wall and frame as shown (Fig. 24).

NON-COMBUSTIBLE WALLS (Fig. 25): Hole opening must be 7.5" (190 mm) in diameter.

Fig. 25

STEP 2

Fig. 26. Measure wall thickness and cut adjustable zero clearance sleeve parts to proper length (MAXIMUM 12"/ 305mm). Adjust sleeve to minimum (9-3/8" x 9-3/8") and attach to firestop with #8 sheet metal screws (supplied). Install firestop assembly.

Zero clearance sleeve is only required for combustible walls.

 

#8

Maximum Length

SCREWS(2)

12" (294mm)

 

#8

ADJUSTABLE

ZERO CLEARANCE

SCREWS(2)

SLEEVE

 

#8

 

SCREWS(2)

 

ADJUSTABLE ZERO

FIRESTOP

CLEARANCE SLEEVE

 

DRYWALL

 

WOOD FRAMING

 

 

WALL EXTERIOR

FIRESTOP

ZERO

 

 

CLEARANCE

 

SLEEVE

 

FLUSH WITH

 

WALL

VENT PIPE

EXTERIOR

 

 

Fig. 26

- 14 -

Image 14
Contents Builder Rear Vent Direct Vent Table of Contents Installation Instructions Locating Your GAS FireplaceFireplace Dimensions DBR33Framing and Finishing Mantel Chart Clearance to CombustiblesMantels Hearth GAS SpecificationsFinal Finishing GAS Line Installation Remote Switch Installation For RN/RPCrimped END Pipes Twist Lock PipesGeneral Venting Information Termination Clearances Rear Venting ApplicationsRear Wall Installations StepVertical Sidewall Applications HOW to USE the Vent Graph Vertical Sidewall Venting GraphVertical Sidewall Installation Vent Opening Noncombustible WallAlways install horizontal venting on a level plane Below Grade Installations Vertical Through Roof ApplicationsVertical Thru the Roof Installation Louvre Removal Glass CleaningGeneral Glass Information Glass Frame RemovalFlame Adjustment Installation of LogsEmber Material Placement Lava RockCleaning the Standing Pilot Control System Flame CharacteristicsMaintenance Inspecting the Venting SystemLighting and Operating Instructions Trouble Shooting the GAS Control System SIT 820 Nova Millivolt ValveHoneywell Millivolt Valve Replacement Parts List Rear Builder Series Replacement Parts Rear Builders Series Wiring Instructions Optional FAN KIT FK12 and FK24Optional BAY Window Installation Optional EB1 Receptacle Hook-UpOptional Remote Control Optional Screen KIT InstallationOptional Ceramic Refractory Installation Crimped Ends Venting Components Twist Lock Venting Components Page Limited Warranty & Extended Life Time Protection