Vermont Casting DBR33 Optional Screen KIT Installation, Optional Ceramic Refractory Installation

Page 28

OPTIONAL SCREEN KIT INSTALLATION

WARNING: DO NOT install the frame window screen with the fireplace ON

To install the Frame Window Screen:

OPTIONAL CERAMIC REFRACTORY

INSTALLATION

DBR33/DBR36/DBR39

1.Remove glass and logs.

2.Place refractory side supports so that the hole fits over the screw head on the firebox floor.

3.Place refractory base sides on the floor of the firebox.

4.Place back refractory - small brick edge down into support (See Fig. 59).

5.Attach adjustable tabs, packed with refractory, onto the studs found on the top of the firebox using the 2-10/ 24 nuts provided.

6.Slide side panels into side supports and behind side tab and adjust, fitting the ceramic tight to the side of the firebox. Tighten nuts. Fig. 58.

Mortar lines must be lined up.

7. Place refractory base centre in front of the burner.

1.Slide the top edge of the frame window screen through the slots beneath the main frame window top trim support.

2.Make the frame window screen parallel to the main frame window.

3.Slide the bottom edge of the frame window screen into the space that exist between the glass and the main frame window bottom trim support.

To remove the Frame Window Screen:

WARNING: If the fireplace is ON, turn it OFF and wait until the temperature of the window screen is cool enough to handle.

SIDE

TAB

SIDE

PANEL

BASE SIDE

REFRACTORY

BACK PANEL

LOG SUPPORT

BURNER TRAY

SIDE

TAB

SIDE

PANEL

BASE SIDE

REFRACTORY

1. Lift the frame window screen moving it parallel to the glass.

2.Move the bottom side of the frame window screen away from the glass.

3.Slide the frame window screen down from the top trim support.

TOP TRIM

SUPPORT

MAIN

FRAME

BOTTOM TRIM SUPPORT

Fig. 57

BASE SIDE SUPPORTS

Fig. 58

REFRACTORY

FIREBOX

BACK PANEL

BACK

REAR LOG

Fig. 59

SUPPORT

OPTIONAL REMOTE CONTROL

MRC1 - On/Off Button Remote Control MRC2 - Temperature Control Remote

MRC3 - Temperature Control w/digital display & 24 hour programmable clock

- 28 -

Image 28
Contents Builder Rear Vent Direct Vent Table of Contents Installation Instructions Locating Your GAS FireplaceFireplace Dimensions DBR33Mantels Mantel Chart Clearance to CombustiblesFraming and Finishing Final Finishing GAS SpecificationsHearth GAS Line Installation Remote Switch Installation For RN/RPCrimped END Pipes Twist Lock PipesGeneral Venting Information Termination Clearances Rear Venting ApplicationsRear Wall Installations StepVertical Sidewall Applications HOW to USE the Vent Graph Vertical Sidewall Venting GraphVertical Sidewall Installation Vent Opening Noncombustible WallAlways install horizontal venting on a level plane Below Grade Installations Vertical Through Roof ApplicationsVertical Thru the Roof Installation Glass Cleaning General Glass InformationLouvre Removal Glass Frame RemovalInstallation of Logs Ember Material PlacementFlame Adjustment Lava RockFlame Characteristics MaintenanceCleaning the Standing Pilot Control System Inspecting the Venting SystemLighting and Operating Instructions Trouble Shooting the GAS Control System SIT 820 Nova Millivolt ValveHoneywell Millivolt Valve Replacement Parts List Rear Builder Series Replacement Parts Rear Builders Series Wiring Instructions Optional FAN KIT FK12 and FK24Optional BAY Window Installation Optional EB1 Receptacle Hook-UpOptional Ceramic Refractory Installation Optional Screen KIT InstallationOptional Remote Control Crimped Ends Venting Components Twist Lock Venting Components Page Limited Warranty & Extended Life Time Protection