INSTALLATION
Part # Description
Alternate Approved Caps
980 | Vertical Termination Cap |
991 | High Wind Cap |
923GK | 3" |
In areas on consistently high winds, we recom- mend using the Simpson
The Air Intake pipe must be attached to the inlet air collar of the termination cap.
5)Install flashing.
6)Insert both liners into chimney, passing through the damper opening.
7)Install termination cap.
8)Connect the marked end of the liner to the inlet collar of the vent connector plate marked with an "I", seal connection with high temperature silicone. Secure with gear clamp.
9)Connect the 2nd liner to the exhaust collar marked with an "E", seal connection with high temperature silicone. Secure with
gear clamp.
nections of liner to inlet and vent col- lars.
10)Attach the top shield to the top front lip of the firebox using 3 screws.
CONVERSION KIT
FROM NATURAL GAS TO PROPANE MODEL #260-960
for Emerald E61 Gas Insert
using SIT 820 NOVA Gas Valve
FLUE LINER
INSTALLATION
1)Cut the flex liner as required.
2)Mark the end of one liner to indicate Inlet.
3)Connect the other end of the above liner to the inlet side of the termination adaptor, seal connection with high temperature silicone. Secure with gear clamp.
4)Connect the 2nd liner to the exhaust side of the adaptor, seal connection with high tem- perature silicone. Secure with gear clamp.
NOTE:
1)Final gas connection should be made after unit is in place to avoid damage to line when pushing the unit into position.
2)
THIS CONVERSION MUST BE
DONE BY A QUALIFIED
GAS FITTER
IF IN DOUBT DO NOT DO THIS
CONVERSION!!
Conversion Kit Contains:
Qty.Part # | Description |
1
1
1
1
1
1
1)Shut off the gas supply.
2)Open the lower grill and remove the 2 screws holding the control panel in place.
Remove the 2 screws holding the
Control Panel in place.
Waterford E61 Gas Fireplace Insert | 9 |