
GOLD
4 Venting and combustion air
Install vent piping and air piping per appropriate Venting Supplement included in boiler envelope assembly.
Refer to Venting Supplements and to manual Section 1 regarding require- ments for:
•vent system
•combustion air openings
•combustion air quality
combustion and ventilation air as described in
Read and follow the special instructions for the Com- monwealth of Massachusetts, located on page 36 of this manual.
24
Part number