Weil-McLain CGS-4E manual 13b Ratings, Tested for 50 psi working pressure

Page 63

GOLD CGs-4E Gas-Fired Water Boiler — Boiler Manual

13b Ratings

 

 

 

 

 

 

 

DOE

 

 

 

 

 

 

 

 

 

 

(Note 5)

 

 

 

 

 

 

 

 

 

Table 7  Boiler ratings

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Boiler

DOE

0-2,000 feet

2,000-4,500 feet

Net

Boiler

DOE

Vent

model

Heating

 

 

 

 

I=B=R

water

Seasonal

size

Input

Output

Input

Output

number

capacity

ratings

content

efficiency

 

 

(Btuh)

(Btuh)

(Btuh)

(Btuh)

(Btuh)

(Btuh)

(gallons)

(% AFUE)

 

 

 

 

 

 

 

 

 

 

 

(Note 1)

(Note 2)

 

 

 

 

(Note 3)

 

(Note 5)

(Note 4)

 

 

 

 

 

 

 

 

 

 

CGs-4E

77,000

90,000

77,000

81,000

69,300

67,000

2.1

85.0

3”

(Note 5)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1.Add “PIN” for natural gas boiler - “PIL” for propane gas boiler.

2.Based on standard test procedures prescribed by the United States Department of Energy.

3.Net I=B=R ratings are based on net installed radiation of sufficient quantity for the requirements of the building

 

and nothing need be added for normal piping and pickup. Ratings are based on a piping and pickup allowance

Notes

of 1.15. An additional allowance should be made for unusual piping and pickup loads.

4.The CGs-4E boiler requires special venting, consistent with Category IV boiler. Use only the vent materials and methods specified in CGs vent supplements. The CGs-4E boiler MUST be direct-vented (using 3” diameter air piping) as specified in the direct vent supplements.

5.As an Energy Star Partner, Weil-McLain has determined that the CGs-4E meets the Energy Star guidelines for energy efficiency.

CGs-4E boilers used for residential radiant panel systems, converted gravity heating systems or other low water temperature applications should be installed with balancing valves and bypass piping equal to the supply and return size to avoid excessive flue gas condensation due to lower operating water temperatures. For alternate piping, contact your Weil-McLain sales office. CSA design certified for installation on combustible flooring.

Tested for 50 psi working pressure.

Part number 550-110-282/1108

63

Image 63
Contents GOLDCGs-4E How it works Gold CGs-4EGas-Fired Induced-Draft Water Boiler Contents Installer Please read before proceedingUser 1a Prepare boiler location codes & checklist Installations must follow these codesBefore locating the boiler, check the following 1b Prepare boiler location clearances Vent system When removing boiler from an existing common vent system1c Prepare boiler location vent system CGs-4E special vent system1d Prepare boiler location contamination Products to avoidAreas likely to have contaminants Sizing air openings 1e Prepare boiler location air openingsCombustion air requirements Special considerationsSizing air openings for CGs-4E installations Inspect orifices and burners 2a Prepare boiler placement & setupOrifice replacement procedure Place boiler/crate near positionPrepare boiler for test 2b Prepare boiler pressure testHydrostatic pressure test Drain and remove fittings3a Water piping general information 3b Water piping single-zone system Install an automatic air vent in air vent tapping as shownPiping multiple zones 3c Water piping multiple zonesFill valve Boiler isolation balancing valves Flow/check valveSystem or zone circulator Zone valve Drain valve Relief valvePrimary/secondary preferred bypass piping method Temperature gaugesValve adjustment Figures 8 and 9 only 3d Piping low temp systemsBoiler isolation balancing valves Blend temperature gaugeBOILER-bypass piping method Valve adjustmentFigures 8 SYSTEM-bypass piping method 3e Water piping refrigeration systems Prevent chilled water from enteringBoiler Venting and combustion air Vent systemCombustion air openings Combustion air quality Propane Gas Connecting gas supply piping to boilerGas piping Natural GasThermostat Field wiringElectrical installation must comply with Wiring connectionsCheck for gas leaks Freeze protection when used7a Start-up preparation Determine if water treatment is neededStart the boiler 7b Start-up operate boilerInspect system water piping Inspect base insulation Final check before starting boilerCheck burner flames Pilot burner flame FigureMain burner flame Figure Gas not turned on at meter or boiler? If none of the above corrects the problem, refer to7c Start-up if boiler doesn’t start Check forInstallation and service certificate Check-out procedure checklist9a Operation sequence Sequence returns to stepBoiler is now in the off cycle Operation sequence Wiring diagram 9b Operation wiring diagrams9c Operating instructions CGs-4E CMR 5.082a1 through Addendum Instruction for Commonwealth of MassachusettsCMR 5.082a 1 through Exemptions The following equipment is exempt from10a Service and maintenance schedule 10b Service & maintenance annual start-up Inducer motor With boiler power off, place a few drops of S.A.EBurners, base and inlet air box Condensate drain system10b Service & maint. annual start-up Relief valve, typical Boiler relief valvePlace newspapers in base of boiler to collect soot Clean between sections with wire flue brushReview with owner Shut down boilerCan result 11a Troubleshooting procedureBefore troubleshooting Check the followingTroubleshooting air pressure reading 11b Troubleshooting air pressure switchAir pressure switch Check pressure switch settingTroubleshooting the control module 11c Troubleshooting control moduleControl indicator lights Lockout modes Control indicator lights NON-LOCKOUT modesControl module connections Chart 1 Troubleshooting Power light status 11d Troubleshooting control module lightsChart 2 Tstat Circ & Power lights flashing Chart 3 Press Switch & Power lights flashing Chart 4 Flame & Power lights flashing Does blower motor operate? Item 8 , Verify Sequence of operation, , 12a Replacement parts Section assembly Base Jacket Trim ControlsWeil-McLain part numbers are found in Weil-McLain Boilers Weil-McLain part number 12b Replacement parts section assemblyBase assembly 12c Replacement parts baseDescription Weil-McLain Part number Jacket assembly 12d Replacement parts jacketBoiler Fittings shown are factory-installed on boiler 12e Replacement parts trimPropane gas components 12f Replacement parts controlsDimensional drawing 13a DimensionsTested for 50 psi working pressure 13b RatingsHandling ceramic fiber and fiberglass materials This type of respirator is based onEye Irrigate immediately Breathing Fresh air