Weil-McLain
CGS-4E
manual
Operation sequence
Troubleshooting
Install
9b Operation wiring diagrams
Field wiring
Dimension
Base assembly
Check-out procedure checklist
Valve adjustment
Check pressure switch setting
Temperature gauges
Page 33
GOLD
CGs-4E
Gas-Fired
Water Boiler — Boiler Manual
Operation — sequence
Figure 18
Control module sequence of operation — status light indications
Part number
550-110-282/1108
33
Page 32
Page 34
Image 33
Page 32
Page 34
Contents
GOLDCGs-4E
How it works
Gold CGs-4EGas-Fired Induced-Draft Water Boiler
Contents
Installer
Please read before proceeding
User
1a Prepare boiler location codes & checklist
Installations must follow these codes
Before locating the boiler, check the following
1b Prepare boiler location clearances
1c Prepare boiler location vent system
When removing boiler from an existing common vent system
CGs-4E special vent system
Vent system
1d Prepare boiler location contamination
Products to avoid
Areas likely to have contaminants
Combustion air requirements
1e Prepare boiler location air openings
Special considerations
Sizing air openings
Sizing air openings for CGs-4E installations
Orifice replacement procedure
2a Prepare boiler placement & setup
Place boiler/crate near position
Inspect orifices and burners
Hydrostatic pressure test
2b Prepare boiler pressure test
Drain and remove fittings
Prepare boiler for test
3a Water piping general information
3b Water piping single-zone system
Install an automatic air vent in air vent tapping as shown
Piping multiple zones
3c Water piping multiple zones
System or zone circulator Zone valve Drain valve
Boiler isolation balancing valves Flow/check valve
Relief valve
Fill valve
Valve adjustment Figures 8 and 9 only
Temperature gauges
3d Piping low temp systems
Primary/secondary preferred bypass piping method
Boiler isolation balancing valves
Blend temperature gauge
BOILER-bypass piping method
Valve adjustment
Figures 8
SYSTEM-bypass piping method
3e Water piping refrigeration systems
Prevent chilled water from entering
Boiler
Venting and combustion air
Vent system
Combustion air openings Combustion air quality
Gas piping
Connecting gas supply piping to boiler
Natural Gas
Propane Gas
Electrical installation must comply with
Field wiring
Wiring connections
Thermostat
7a Start-up preparation
Freeze protection when used
Determine if water treatment is needed
Check for gas leaks
Inspect system water piping Inspect base insulation
7b Start-up operate boiler
Final check before starting boiler
Start the boiler
Check burner flames
Pilot burner flame Figure
Main burner flame Figure
7c Start-up if boiler doesn’t start
If none of the above corrects the problem, refer to
Check for
Gas not turned on at meter or boiler?
Installation and service certificate
Check-out procedure checklist
9a Operation sequence
Sequence returns to step
Boiler is now in the off cycle
Operation sequence
Wiring diagram
9b Operation wiring diagrams
9c Operating instructions CGs-4E
CMR 5.082a 1 through
Addendum Instruction for Commonwealth of Massachusetts
Exemptions The following equipment is exempt from
CMR 5.082a1 through
10a Service and maintenance schedule
10b Service & maintenance annual start-up
Burners, base and inlet air box
With boiler power off, place a few drops of S.A.E
Condensate drain system
Inducer motor
10b Service & maint. annual start-up
Relief valve, typical
Boiler relief valve
Review with owner
Clean between sections with wire flue brush
Shut down boiler
Place newspapers in base of boiler to collect soot
Before troubleshooting
11a Troubleshooting procedure
Check the following
Can result
Air pressure switch
11b Troubleshooting air pressure switch
Check pressure switch setting
Troubleshooting air pressure reading
Control indicator lights Lockout modes
11c Troubleshooting control module
Control indicator lights NON-LOCKOUT modes
Troubleshooting the control module
Control module connections
Chart 1 Troubleshooting Power light status
11d Troubleshooting control module lights
Chart 2 Tstat Circ & Power lights flashing
Chart 3 Press Switch & Power lights flashing
Chart 4 Flame & Power lights flashing
Does blower motor operate?
Item 8 ,
Verify Sequence of operation, ,
12a Replacement parts
Section assembly Base Jacket Trim Controls
Weil-McLain part numbers are found in Weil-McLain Boilers
Weil-McLain part number
12b Replacement parts section assembly
Base assembly
12c Replacement parts base
Description Weil-McLain Part number
Jacket assembly
12d Replacement parts jacket
Boiler
Fittings shown are factory-installed on boiler
12e Replacement parts trim
Propane gas components
12f Replacement parts controls
Dimensional drawing
13a Dimensions
Tested for 50 psi working pressure
13b Ratings
Handling ceramic fiber and fiberglass materials
This type of respirator is based on
Eye Irrigate immediately Breathing Fresh air
Related pages
Troubleshooting Maps for Blackberry 9800
Mechanical Specifications for Acumen SDR2-USB
Charging and LED Indicator Light Table for BMW Wireless Headphone
Conexión de las unidades Diagrama de conexión for Pioneer GM-6400F
How to set the Pizza function for Samsung NX583G0VB
Installation Instructions for Aprilaire 800
Parts List / Sensor XP18 for Windsor XP 18
TV Brand Code List for Samsung HT-DS400
Lower Display Upper Display Prompt Range of Setting for Honeywell UDC 3300
How do I troubleshoot my Liebherr freezer ice maker?
Learn more here
Top
Page
Image
Contents