Weil-McLain CGS-4E manual Verify Sequence of operation

Page 53

GOLD CGs-4E Gas-Fired Water Boiler — Boiler Manual

11d Troubleshooting — control module lights (cont.)

CHART 7 — Insufficient heat or no heat to system (POWER light on steady)

Electrical shock hazard — Wherever you see TURN OFF POWER, follow the instructions. Failure to follow instructions could result in severe personal injury, death or substantial property damage.

• Has it been at least 5 minutes since setting thermostat to call for heat? If not, wait 5 minutes. Is system heating?

• Is thermostat set to call for heat? Remove thermostat wires at boiler and check continuity across the two wires. If circuit isn't closed, check external thermostat (zone valve, relay, etc.) wiring. Correct problems and retry.

• Reconnect external thermostat wiring at boiler.

Is thermostat circuit closed (continuity across wires)?

No

 

Yes

 

 

 

 

Is boiler System circulator operating?

No

Yes

Remove CIRCULATOR harness plug from CIRCULATOR plug receptacle (Figure 25, Item 7, page 46). Check with voltmeter across pins of control module receptacle.

Does voltmeter show 120 VAC across pins?

No

Yes

Are all red lights off?

No Yes

Wait 30 seconds. Are all red lights off?

No Yes

Replace control module. Retest.

Boiler is in standby.

Set thermostat to call for heat and recheck

operation.

Verify Sequence of operation, Figure 18, page 33.

Replace control

 

Repair/replace

 

module.

 

 

circulator. Retest.

Retest.

 

Repair/replace

 

 

 

 

wiring. Retest.

 

 

 

 

 

 

 

 

 

• Wait 5 minutes.

• If you have sufficient heat — boiler should be in normal

operating sequence. (See normal sequence of operation, Figure 18, page 33.)

• If you have less than sufficient heat —

Are vent and combustion air piping free of blockage?

No

Yes

 

Is FLAME light on?

Yes

No

 

Is LIMIT light on?

No

Yes

Correct conditions and

 

Is manifold pressure:

 

 

 

recheck operation.

 

 

3.50" w.c. on natural gas?

• See Figure 18, page 33

 

 

10.0" w.c. on propane?

 

for normal sequence of

 

 

Yes

 

 

 

No

 

operation.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

• Check heat loss calculation

 

 

 

 

 

 

 

 

 

versus boiler size.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Clock gas input.

 

 

• Replace timer relay.

Wait for boiler water to cool to temperature 20 to 30 °F lower than temperature set on limit switch.

Are limit switch contacts closed?

Check limit switch

 

 

Replace control module.

 

contacts with continuity

 

 

Retest.

 

 

 

 

checker.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Are limit switch contacts

 

 

 

 

 

 

 

 

 

 

closed?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Check rollout switch

 

 

 

 

 

 

 

 

 

 

 

 

No

 

 

Yes

 

 

 

 

 

 

 

 

 

 

continuity — is switch

 

 

 

 

 

 

 

 

 

 

 

 

closed?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

No

 

 

Yes

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Replace rollout switch.

 

 

 

 

 

 

No

Replace limit switch.

Retest.

Yes

Figure 18, page 33

Also check setting on limit switch (should be above 140°F.).

 

 

 

 

If rollout thermal fuse element has

 

Check any other

 

 

limit controls wired

opened, determine cause and

 

 

into the limit

correct condition. Failure to do so

 

 

circuit. If all are

will cause severe personal injury,

 

 

OK, then replace

death or substantial property

 

 

control module.

damage.

 

Retest.

Part number 550-110-282/1108

53

Image 53
Contents GOLDCGs-4E How it works Gold CGs-4EGas-Fired Induced-Draft Water Boiler Contents User InstallerPlease read before proceeding Before locating the boiler, check the following 1a Prepare boiler location codes & checklistInstallations must follow these codes 1b Prepare boiler location clearances 1c Prepare boiler location vent system When removing boiler from an existing common vent systemCGs-4E special vent system Vent systemAreas likely to have contaminants 1d Prepare boiler location contaminationProducts to avoid Combustion air requirements 1e Prepare boiler location air openingsSpecial considerations Sizing air openingsSizing air openings for CGs-4E installations Orifice replacement procedure 2a Prepare boiler placement & setupPlace boiler/crate near position Inspect orifices and burnersHydrostatic pressure test 2b Prepare boiler pressure testDrain and remove fittings Prepare boiler for test3a Water piping general information 3b Water piping single-zone system Install an automatic air vent in air vent tapping as shownPiping multiple zones 3c Water piping multiple zonesSystem or zone circulator Zone valve Drain valve Boiler isolation balancing valves Flow/check valveRelief valve Fill valveValve adjustment Figures 8 and 9 only Temperature gauges3d Piping low temp systems Primary/secondary preferred bypass piping methodBoiler isolation balancing valves Blend temperature gaugeBOILER-bypass piping method Valve adjustmentFigures 8 SYSTEM-bypass piping method Boiler 3e Water piping refrigeration systemsPrevent chilled water from entering Combustion air openings Combustion air quality Venting and combustion airVent system Gas piping Connecting gas supply piping to boilerNatural Gas Propane GasElectrical installation must comply with Field wiringWiring connections Thermostat7a Start-up preparation Freeze protection when usedDetermine if water treatment is needed Check for gas leaksInspect system water piping Inspect base insulation 7b Start-up operate boilerFinal check before starting boiler Start the boilerMain burner flame Figure Check burner flamesPilot burner flame Figure 7c Start-up if boiler doesn’t start If none of the above corrects the problem, refer toCheck for Gas not turned on at meter or boiler?Installation and service certificate Check-out procedure checklistBoiler is now in the off cycle 9a Operation sequenceSequence returns to step Operation sequence Wiring diagram 9b Operation wiring diagrams9c Operating instructions CGs-4E CMR 5.082a 1 through Addendum Instruction for Commonwealth of MassachusettsExemptions The following equipment is exempt from CMR 5.082a1 through10a Service and maintenance schedule 10b Service & maintenance annual start-up Burners, base and inlet air box With boiler power off, place a few drops of S.A.ECondensate drain system Inducer motor10b Service & maint. annual start-up Relief valve, typical Boiler relief valveReview with owner Clean between sections with wire flue brushShut down boiler Place newspapers in base of boiler to collect sootBefore troubleshooting 11a Troubleshooting procedureCheck the following Can resultAir pressure switch 11b Troubleshooting air pressure switchCheck pressure switch setting Troubleshooting air pressure readingControl indicator lights Lockout modes 11c Troubleshooting control moduleControl indicator lights NON-LOCKOUT modes Troubleshooting the control moduleControl module connections Chart 1 Troubleshooting Power light status 11d Troubleshooting control module lightsChart 2 Tstat Circ & Power lights flashing Chart 3 Press Switch & Power lights flashing Chart 4 Flame & Power lights flashing Does blower motor operate? Item 8 , Verify Sequence of operation, , Weil-McLain part numbers are found in Weil-McLain Boilers 12a Replacement partsSection assembly Base Jacket Trim Controls Weil-McLain part number 12b Replacement parts section assemblyBase assembly 12c Replacement parts baseDescription Weil-McLain Part number Jacket assembly 12d Replacement parts jacketBoiler Fittings shown are factory-installed on boiler 12e Replacement parts trimPropane gas components 12f Replacement parts controlsDimensional drawing 13a DimensionsTested for 50 psi working pressure 13b RatingsEye Irrigate immediately Breathing Fresh air Handling ceramic fiber and fiberglass materialsThis type of respirator is based on