Weil-McLain
CGS-4E
manual
9b Operation wiring diagrams, Wiring diagram
Troubleshooting
Install
9b Operation wiring diagrams
Field wiring
Dimension
Base assembly
Check-out procedure checklist
Valve adjustment
Check pressure switch setting
Temperature gauges
Page 34
GOLD
CGs-4E
Gas-Fired
Water Boiler — Boiler Manual
9b
Operation — wiring diagrams
Figure 19
Wiring diagram
34
Part number
550-110-282/1108
Page 33
Page 35
Image 34
Page 33
Page 35
Contents
GOLDCGs-4E
How it works
Gold CGs-4EGas-Fired Induced-Draft Water Boiler
Contents
Please read before proceeding
Installer
User
Installations must follow these codes
1a Prepare boiler location codes & checklist
Before locating the boiler, check the following
1b Prepare boiler location clearances
CGs-4E special vent system
When removing boiler from an existing common vent system
1c Prepare boiler location vent system
Vent system
Products to avoid
1d Prepare boiler location contamination
Areas likely to have contaminants
Special considerations
1e Prepare boiler location air openings
Combustion air requirements
Sizing air openings
Sizing air openings for CGs-4E installations
Place boiler/crate near position
2a Prepare boiler placement & setup
Orifice replacement procedure
Inspect orifices and burners
Drain and remove fittings
2b Prepare boiler pressure test
Hydrostatic pressure test
Prepare boiler for test
3a Water piping general information
Install an automatic air vent in air vent tapping as shown
3b Water piping single-zone system
3c Water piping multiple zones
Piping multiple zones
Relief valve
Boiler isolation balancing valves Flow/check valve
System or zone circulator Zone valve Drain valve
Fill valve
3d Piping low temp systems
Temperature gauges
Valve adjustment Figures 8 and 9 only
Primary/secondary preferred bypass piping method
Blend temperature gauge
Boiler isolation balancing valves
Valve adjustment
BOILER-bypass piping method
Figures 8
SYSTEM-bypass piping method
Prevent chilled water from entering
3e Water piping refrigeration systems
Boiler
Vent system
Venting and combustion air
Combustion air openings Combustion air quality
Natural Gas
Connecting gas supply piping to boiler
Gas piping
Propane Gas
Wiring connections
Field wiring
Electrical installation must comply with
Thermostat
Determine if water treatment is needed
Freeze protection when used
7a Start-up preparation
Check for gas leaks
Final check before starting boiler
7b Start-up operate boiler
Inspect system water piping Inspect base insulation
Start the boiler
Pilot burner flame Figure
Check burner flames
Main burner flame Figure
Check for
If none of the above corrects the problem, refer to
7c Start-up if boiler doesn’t start
Gas not turned on at meter or boiler?
Check-out procedure checklist
Installation and service certificate
Sequence returns to step
9a Operation sequence
Boiler is now in the off cycle
Operation sequence
9b Operation wiring diagrams
Wiring diagram
9c Operating instructions CGs-4E
Exemptions The following equipment is exempt from
Addendum Instruction for Commonwealth of Massachusetts
CMR 5.082a 1 through
CMR 5.082a1 through
10a Service and maintenance schedule
10b Service & maintenance annual start-up
Condensate drain system
With boiler power off, place a few drops of S.A.E
Burners, base and inlet air box
Inducer motor
10b Service & maint. annual start-up
Boiler relief valve
Relief valve, typical
Shut down boiler
Clean between sections with wire flue brush
Review with owner
Place newspapers in base of boiler to collect soot
Check the following
11a Troubleshooting procedure
Before troubleshooting
Can result
Check pressure switch setting
11b Troubleshooting air pressure switch
Air pressure switch
Troubleshooting air pressure reading
Control indicator lights NON-LOCKOUT modes
11c Troubleshooting control module
Control indicator lights Lockout modes
Troubleshooting the control module
Control module connections
11d Troubleshooting control module lights
Chart 1 Troubleshooting Power light status
Chart 2 Tstat Circ & Power lights flashing
Chart 3 Press Switch & Power lights flashing
Chart 4 Flame & Power lights flashing
Does blower motor operate?
Item 8 ,
Verify Sequence of operation, ,
Section assembly Base Jacket Trim Controls
12a Replacement parts
Weil-McLain part numbers are found in Weil-McLain Boilers
12b Replacement parts section assembly
Weil-McLain part number
12c Replacement parts base
Base assembly
Description Weil-McLain Part number
12d Replacement parts jacket
Jacket assembly
Boiler
12e Replacement parts trim
Fittings shown are factory-installed on boiler
12f Replacement parts controls
Propane gas components
13a Dimensions
Dimensional drawing
13b Ratings
Tested for 50 psi working pressure
This type of respirator is based on
Handling ceramic fiber and fiberglass materials
Eye Irrigate immediately Breathing Fresh air
Related pages
All Diagram page
Schematic Diagrams 4TTR5048 for Trane XR15
Reheating charts for Panasonic NN-CT559W
Logic Block Diagram CY7C1518KV18 for Cypress CY7C1516KV18
Montage Betrieb Wartungsdiagramm Fehlersuchdiagramm for Simplicity H924RX
10Reading command diagram for Mitsubishi Electronics HL650U
DN1 Parts Finder Diagram for Ramsey Electronics DN1
Cycle Chart for Samsung DC68-02312A-04
Wiring Diagram for Aube Technologies TH123
Antenna Lubrication Chart for Andrew ES45T
Wiring Diagram for Yazoo/Kees 968999506
What are the sorting options available on the
DigiPal 2
program list?
Top
Page
Image
Contents