Weil-McLain
CGS-4E
manual
12c Replacement parts base, Base assembly
Troubleshooting
Install
9b Operation wiring diagrams
Field wiring
Dimension
Base assembly
Check-out procedure checklist
Valve adjustment
Check pressure switch setting
Temperature gauges
Page 56
GOLD
CGs-4E
Gas-Fired
Water Boiler — Boiler Manual
12c
Replacement parts — base
Figure 27
Base assembly
56
Part number
550-110-282/1108
Page 55
Page 57
Image 56
Page 55
Page 57
Contents
GOLDCGs-4E
How it works
Gold CGs-4EGas-Fired Induced-Draft Water Boiler
Contents
User
Installer
Please read before proceeding
Before locating the boiler, check the following
1a Prepare boiler location codes & checklist
Installations must follow these codes
1b Prepare boiler location clearances
When removing boiler from an existing common vent system
1c Prepare boiler location vent system
CGs-4E special vent system
Vent system
Areas likely to have contaminants
1d Prepare boiler location contamination
Products to avoid
1e Prepare boiler location air openings
Combustion air requirements
Special considerations
Sizing air openings
Sizing air openings for CGs-4E installations
2a Prepare boiler placement & setup
Orifice replacement procedure
Place boiler/crate near position
Inspect orifices and burners
2b Prepare boiler pressure test
Hydrostatic pressure test
Drain and remove fittings
Prepare boiler for test
3a Water piping general information
Install an automatic air vent in air vent tapping as shown
3b Water piping single-zone system
3c Water piping multiple zones
Piping multiple zones
Boiler isolation balancing valves Flow/check valve
System or zone circulator Zone valve Drain valve
Relief valve
Fill valve
Temperature gauges
Valve adjustment Figures 8 and 9 only
3d Piping low temp systems
Primary/secondary preferred bypass piping method
Blend temperature gauge
Boiler isolation balancing valves
Valve adjustment
BOILER-bypass piping method
Figures 8
SYSTEM-bypass piping method
Boiler
3e Water piping refrigeration systems
Prevent chilled water from entering
Combustion air openings Combustion air quality
Venting and combustion air
Vent system
Connecting gas supply piping to boiler
Gas piping
Natural Gas
Propane Gas
Field wiring
Electrical installation must comply with
Wiring connections
Thermostat
Freeze protection when used
7a Start-up preparation
Determine if water treatment is needed
Check for gas leaks
7b Start-up operate boiler
Inspect system water piping Inspect base insulation
Final check before starting boiler
Start the boiler
Main burner flame Figure
Check burner flames
Pilot burner flame Figure
If none of the above corrects the problem, refer to
7c Start-up if boiler doesn’t start
Check for
Gas not turned on at meter or boiler?
Check-out procedure checklist
Installation and service certificate
Boiler is now in the off cycle
9a Operation sequence
Sequence returns to step
Operation sequence
9b Operation wiring diagrams
Wiring diagram
9c Operating instructions CGs-4E
Addendum Instruction for Commonwealth of Massachusetts
CMR 5.082a 1 through
Exemptions The following equipment is exempt from
CMR 5.082a1 through
10a Service and maintenance schedule
10b Service & maintenance annual start-up
With boiler power off, place a few drops of S.A.E
Burners, base and inlet air box
Condensate drain system
Inducer motor
10b Service & maint. annual start-up
Boiler relief valve
Relief valve, typical
Clean between sections with wire flue brush
Review with owner
Shut down boiler
Place newspapers in base of boiler to collect soot
11a Troubleshooting procedure
Before troubleshooting
Check the following
Can result
11b Troubleshooting air pressure switch
Air pressure switch
Check pressure switch setting
Troubleshooting air pressure reading
11c Troubleshooting control module
Control indicator lights Lockout modes
Control indicator lights NON-LOCKOUT modes
Troubleshooting the control module
Control module connections
11d Troubleshooting control module lights
Chart 1 Troubleshooting Power light status
Chart 2 Tstat Circ & Power lights flashing
Chart 3 Press Switch & Power lights flashing
Chart 4 Flame & Power lights flashing
Does blower motor operate?
Item 8 ,
Verify Sequence of operation, ,
Weil-McLain part numbers are found in Weil-McLain Boilers
12a Replacement parts
Section assembly Base Jacket Trim Controls
12b Replacement parts section assembly
Weil-McLain part number
12c Replacement parts base
Base assembly
Description Weil-McLain Part number
12d Replacement parts jacket
Jacket assembly
Boiler
12e Replacement parts trim
Fittings shown are factory-installed on boiler
12f Replacement parts controls
Propane gas components
13a Dimensions
Dimensional drawing
13b Ratings
Tested for 50 psi working pressure
Eye Irrigate immediately Breathing Fresh air
Handling ceramic fiber and fiberglass materials
This type of respirator is based on
Related pages
All Assembly page
Sail Switch Assembly Gas Models Only for American Dryer Corp AD-95
JHS-2200A Pump Assembly Exploded View for Jet Tools JHS-2200A
4. Remove the fan/heat sink assembly 3 by lifting straight up for HP CQ62z-300
Repeat this step for remaining blade assembly for Westinghouse ETL-ES-Harmony-WH11
Lift Assembly for Poulan 178500
4WD Axle Assembly for Cub Cadet 7304
Assembly Instructions Montage Instrucciones DE Ensamble for McCulloch MB3202
Operating Manual Instrucciones DE Seguridad Assembly Armado for Dyson DC65
LEVER/CABLE Rotator Assembly for Poulan 425353
Pole Assembly Parts for Coleman 9230-174c
What features does the regnmätare med solcell include?
Learn more here
Top
Page
Image
Contents