Weil-McLain 550-110-260/02002 Check-out procedure checklist, Installation and service certificate

Page 30

GOLD CGs Gas-Fired Water Boiler

8Check-out procedure — checklist

Boiler and heat distribution units filled with water?

Automatic air vent, if used, open one full turn?

Air purged from system?

Air purged from gas piping? Piping checked for leaks?

Correctly sized manifold orifices installed? Refer to manual section 2a to check size and fuel type.

Correctly sized manifold orifices must be used. Failure to do so will cause severe personal injury, death or substantial property damage.

Followed operating instructions on boiler or in manual section 9 for proper start-up?

Proper burner flame observed? Refer to Check burner flame, manual section 7b.

Test limit control — While burners are operating, move indicator on limit control below actual boiler water temperature. Burners should go off while circulator continues to operate. Raise setting on limit control above boiler water temperature and burners should reignite.

Test additional field-installed controls — If boiler has a low water cutoff, additional high limit or other controls, test for operation as outlined by manufacturer. Burners should be operating and should go off when controls are tested. When controls are restored, burners should reignite.

Test ignition system safety device:

a.Connect manometer to outlet side of gas valve.

b.Start boiler, allowing for normal start-up cycle to occur and main burners to ignite.

c.With main burners on, manually shut off gas supply at manual main shutoff gas valve. Burners should go off.

d.Open manual main shutoff gas valve. Manometer should confirm there is no gas flow.

e.Pilot will relight, flame sensing element will sense pilot flame and main burners will reignite.

Set limit control(s) to system temperature requirements. Adjust balancing valves and controls to provide design temperature to system.

For multiple zones, adjust flow so it is about the same in each zone.

Verify thermostat heat anticipator (if available) set properly? Refer to Field wiring, manual section 6a, Thermostat(s).

Cycle boiler with thermostat — Raise to highest setting and verify boiler goes through normal start-up cycle. Lower to lowest setting and verify boiler goes off.

Measure natural gas input:

a.Operate boiler 10 minutes.

b.Turn off other appliances.

c.At natural gas meter, measure time (in seconds) required to use one cubic foot of gas.

d.Calculate gas input:

3600 x 1000

 

= Btuh

number of seconds from step c

 

e.Btuh calculated should approximate input rating on boiler rating label.

Check manifold gas pressure by connecting manometer to downstream test tapping on main gas valve. Manifold pressure for natural gas should be 3.5" w.c. and for propane gas should be 10" w.c.

Observe several operating cycles for proper operation.

Set room thermostat to desired room temperature.

Fill in Installation and service certificate below?

Review all instructions shipped with this boiler with owner or maintenance person. Return instructions to envelope and give to owner or place in pocket inside front panel in boiler.

Installation and service certificate

Boiler model __________________

Measured Btuh input ____________

Series __________

CP number ___________

Date installed _______________

Installation instructions have been followed.

Check out sequence has been performed.

Above information is certified to be correct.

Information received and left with owner/maintenance person

Installer ________________________

________________________________

______________________________

(company)

(address)

(phone)

 

_____________________________________

 

 

(installer’s signature)

30

 

Part number 550-110-260/0200

Image 30
Contents Page How it works ① Control modulePage Contents Installer Please read before proceedingUser 1a Prepare boiler location codes & checklist Residential garage installation 1b Prepare boiler location clearancesFlooring and foundation 1c Prepare boiler location vent system Removing from existing vent1d Prepare boiler location contamination Air contamination1e Prepare boiler location air openings CGs combustion air optionsSizing air openings for CGs installations Place boiler/crate near position 2a Prepare boiler placement & setupOrifice replacement procedure Inspect orifices and burnersPrepare boiler for test 2b Prepare boiler pressure testPerform hydrostatic pressure test Fill and pressure test3a Water piping general information Diaphragm-type or bladder-type expansion tank Figure 3b Water piping single-zone systemExpansion tank Closed-type expansion tank Figure3c Water piping multiple zones Converted gravity or steam systemsTypical piping multiple-zone installations Temperature gauges Valve adjustment 3d Water piping low temp systemsPrimary/secondary preferred bypass piping For radiant heating or converted gravity systems3e Water piping low temp systems Boiler-bypass alternate piping 3f Water piping low temp systems 3f system-bypass alternate piping 3g Water piping refrigeration systemPrevent chilled water from entering boiler Connecting gas supply piping to boiler Venting and combustion airGas piping Natural Gas LengthThermostat Field wiringWiring connections Junction Box furnishedDetermine if water treatment is needed Freeze protection when used7a Start-up preparation Check for gas leaks7a Start-up preparation 7b Start-up operate boiler7c Start-up if boiler doesn’t start Check burner flamesCheck for Check-out procedure checklist Installation and service certificate9a Operation sequence Raise room thermostat to call for heat9b Operation wiring diagrams Schematic wiring diagramService For Your Safety Read Before Operating 9c Operation lighting instructions10a Service and maintenance schedule Service technician10b Service & maintenance annual start-up Condensate drain system Burners, base and inlet air boxBoiler heating surfaces Inducer motor10b Service & maint. annual start-up Boiler relief valve Lever must be operated AT LeastReview with owner 11a Troubleshooting procedure Before troubleshooting11b Troubleshooting air pressure switch Check pressure switch setting11c Troubleshooting control module Control indicator lights lockout modesControl module connections 11d Troubleshooting control module lights Chart 1 Troubleshooting Power light statusChart 2 Tstat Circ & Power lights flashing Chart 3 Press Switch & Power lights flashing Chart 4 Flame & Power lights flashing Turn OFF Power to boiler at service switch or breaker Does blower motor operate? Verify Sequence of operation, , 12a Replacement parts Page Page Page Page Page 13a Dimensions Dimensional drawing13b Ratings DOEHandling ceramic fiber and fiberglass materials Removal of Combustion Chamber Lining or Base Panels

550-110-260/02002 specifications

Weil-McLain is a well-known manufacturer of high-quality heating systems and boiler solutions, and the 550-110-260/02002 model is a testament to the company's commitment to innovation and performance. This particular boiler is designed for commercial and residential applications, providing exceptional heating efficiency and reliability.

One of the standout features of the Weil-McLain 550-110-260/02002 is its robust construction. Built using durable materials, this boiler is engineered to withstand demanding environments while maintaining optimal performance. The unit boasts a high thermal efficiency rating, which translates to lower energy costs and reduced environmental impact. The advanced design ensures that fuel consumption is minimized while delivering consistent heat output.

The Weil-McLain 550-110-260/02002 utilizes a multi-stage burner that enhances combustion efficiency. This feature not only reduces emissions but also improves overall energy use, making it an environmentally friendly choice. The sophisticated control system allows for precise modulation of the burner, ensuring that the boiler operates at peak efficiency under various load conditions.

The boiler is equipped with a user-friendly digital control interface, providing operators with real-time monitoring and diagnostics. This allows for easy adjustments and troubleshooting, which helps to reduce maintenance downtime. The integrated safety features enhance the operational reliability of the unit, ensuring safe operation in any environment.

Another important characteristic of the Weil-McLain 550-110-260/02002 is its adaptability. It can be configured to work with various types of fuel including natural gas and propane, giving users the flexibility to choose the most cost-effective energy source. This versatility also helps to extend the lifespan of the boiler as it can be easily adapted to changing energy needs.

In conclusion, the Weil-McLain 550-110-260/02002 is a high-performance boiler that combines durability, efficiency, and advanced technology. With its robust construction, efficient burner system, and user-friendly controls, it stands out as a reliable heating solution for both commercial and residential applications. The commitment to quality and innovation makes this model a preferred choice for those seeking dependable heating systems. Whether for new installations or replacements, the Weil-McLain 550-110-260/02002 delivers exceptional performance and value.