Weil-McLain 550-110-260/02002 manual 9c Operation lighting instructions

Page 34

GOLD CGs Gas-Fired Water Boiler

9c Operation — lighting instructions

Figure 21 Lighting instructions

FOR YOUR SAFETY READ BEFORE OPERATING

If you do not follow these instructions exactly, a fire or explosion may result causing property damage, personal injury or loss of life.

A.This appliance does not have a pilot. It is equipped with an ignition device which automatically lights the burner. Do not try to light the burner by hand.

B.Before OPERATING, smell all around the appliance area for gas. Be sure to smell next to the floor because some gas is heavier than air and will settle on the floor. See below.

C.Use only your hand to turn the gas control knob. Never use tools. If the knob will not turn by hand, don't try to repair it, call a qualified service technician. Force or attempted repair may result in a fire or explosion.

D.Do not use this appliance if any part has been under water. Immediately call a qualified service technician to inspect the appliance and to replace any part of the control system and any gas control, which has been under water.

WHAT TO DO IF YOU SMELL GAS

Do not try to light any appliance.

Do not touch any electric switch; do not use any phone in your building.

Immediately call your gas supplier from a neighbor's phone. Follow the gas supplier's instructions.

If you cannot reach your gas supplier, call the fire department.

OPERATING INSTRUCTIONS

1.Stop! Read the safety information above on this label.

2.Set the thermostat to lowest setting.

3.Turn off all electrical power to the appliance.

4.Remove jacket front panel.

5.This appliance is equipped with an ignition device which automatically lights the burner. Do not try to light the burner by hand.

6.Turn Gas control knob clockwise to OFF.

7.Wait five (5) minutes to clear out any gas. Then smell for gas, including near the floor. If you smell gas, STOP! Follow "B" in the safety information above. If you don't smell gas, go to the next step.

8.Turn Gas control knob counterclockwise to ON.

9.Turn on all electric power to the appliance.

10.Set thermostat to desired setting.

11.If the appliance will not operate, follow the instructions "To Turn Off Gas To Appliance" below and call your service technician or gas supplier.

12.Replace jacket front panel.

26070

White-Rodgers 36C Gas valve

Position indicator

(shown in "ON" position)

Gas control knob

White-Rodgers 36E Gas valve

Position indicator

(shown in "ON" position)

Gas control knob

Honeywell

VR8204 or

VR8304

Gas valve

Position indicator

(shown in "ON" position)

Gas control knob

TO TURN OFF GAS TO THE APPLIANCE

1.Set the thermostat to lowest setting.

2.Turn off all electric power to the appliance if service is to be performed.

3.Remove jacket front panel.

4.Turn Gas control knob clockwise to OFF. Do not force.

5.Replace jacket front panel.

34

Part number 550-110-260/0200

Image 34
Contents Page How it works ① Control modulePage Contents Please read before proceeding InstallerUser 1a Prepare boiler location codes & checklist 1b Prepare boiler location clearances Residential garage installationFlooring and foundation 1c Prepare boiler location vent system Removing from existing vent1d Prepare boiler location contamination Air contamination1e Prepare boiler location air openings CGs combustion air optionsSizing air openings for CGs installations Place boiler/crate near position 2a Prepare boiler placement & setupOrifice replacement procedure Inspect orifices and burnersPrepare boiler for test 2b Prepare boiler pressure testPerform hydrostatic pressure test Fill and pressure test3a Water piping general information Diaphragm-type or bladder-type expansion tank Figure 3b Water piping single-zone systemExpansion tank Closed-type expansion tank Figure3c Water piping multiple zones Converted gravity or steam systemsTypical piping multiple-zone installations Temperature gauges Valve adjustment 3d Water piping low temp systemsPrimary/secondary preferred bypass piping For radiant heating or converted gravity systems3e Water piping low temp systems Boiler-bypass alternate piping 3f Water piping low temp systems 3g Water piping refrigeration system 3f system-bypass alternate pipingPrevent chilled water from entering boiler Venting and combustion air Connecting gas supply piping to boilerGas piping Natural Gas LengthThermostat Field wiringWiring connections Junction Box furnishedDetermine if water treatment is needed Freeze protection when used7a Start-up preparation Check for gas leaks7a Start-up preparation 7b Start-up operate boilerCheck burner flames 7c Start-up if boiler doesn’t startCheck for Check-out procedure checklist Installation and service certificate9a Operation sequence Raise room thermostat to call for heat9b Operation wiring diagrams Schematic wiring diagramService For Your Safety Read Before Operating 9c Operation lighting instructions10a Service and maintenance schedule Service technician10b Service & maintenance annual start-up Condensate drain system Burners, base and inlet air boxBoiler heating surfaces Inducer motor10b Service & maint. annual start-up Boiler relief valve Lever must be operated AT LeastReview with owner 11a Troubleshooting procedure Before troubleshooting11b Troubleshooting air pressure switch Check pressure switch setting11c Troubleshooting control module Control indicator lights lockout modesControl module connections 11d Troubleshooting control module lights Chart 1 Troubleshooting Power light statusChart 2 Tstat Circ & Power lights flashing Chart 3 Press Switch & Power lights flashing Chart 4 Flame & Power lights flashing Turn OFF Power to boiler at service switch or breaker Does blower motor operate? Verify Sequence of operation, , 12a Replacement parts Page Page Page Page Page 13a Dimensions Dimensional drawing13b Ratings DOEHandling ceramic fiber and fiberglass materials Removal of Combustion Chamber Lining or Base Panels

550-110-260/02002 specifications

Weil-McLain is a well-known manufacturer of high-quality heating systems and boiler solutions, and the 550-110-260/02002 model is a testament to the company's commitment to innovation and performance. This particular boiler is designed for commercial and residential applications, providing exceptional heating efficiency and reliability.

One of the standout features of the Weil-McLain 550-110-260/02002 is its robust construction. Built using durable materials, this boiler is engineered to withstand demanding environments while maintaining optimal performance. The unit boasts a high thermal efficiency rating, which translates to lower energy costs and reduced environmental impact. The advanced design ensures that fuel consumption is minimized while delivering consistent heat output.

The Weil-McLain 550-110-260/02002 utilizes a multi-stage burner that enhances combustion efficiency. This feature not only reduces emissions but also improves overall energy use, making it an environmentally friendly choice. The sophisticated control system allows for precise modulation of the burner, ensuring that the boiler operates at peak efficiency under various load conditions.

The boiler is equipped with a user-friendly digital control interface, providing operators with real-time monitoring and diagnostics. This allows for easy adjustments and troubleshooting, which helps to reduce maintenance downtime. The integrated safety features enhance the operational reliability of the unit, ensuring safe operation in any environment.

Another important characteristic of the Weil-McLain 550-110-260/02002 is its adaptability. It can be configured to work with various types of fuel including natural gas and propane, giving users the flexibility to choose the most cost-effective energy source. This versatility also helps to extend the lifespan of the boiler as it can be easily adapted to changing energy needs.

In conclusion, the Weil-McLain 550-110-260/02002 is a high-performance boiler that combines durability, efficiency, and advanced technology. With its robust construction, efficient burner system, and user-friendly controls, it stands out as a reliable heating solution for both commercial and residential applications. The commitment to quality and innovation makes this model a preferred choice for those seeking dependable heating systems. Whether for new installations or replacements, the Weil-McLain 550-110-260/02002 delivers exceptional performance and value.