Weil-McLain 550-110-260/02002 2a Prepare boiler placement & setup, Inspect orifices and burners

Page 12

GOLD CGs Gas-Fired Water Boiler

2a Prepare boiler — placement & setup

Place boiler/crate near position

1.Leave boiler in crate and on pallet until installation site is ready.

2.Move entire crate and pallet next to selected location.

3.Remove crate.

4.Remove boiler from pallet.

Do not drop boiler or bump jacket on floor or pallet. Damage to boiler can result.

a.Tilt left side of boiler up and place a board under left legs.

b.Tilt boiler the other way and place a board under right legs.

c.Slide boiler backward off pallet and into position.

5.Check level.

a.Shim legs, if necessary.

b.Do not alter legs.

Inspect orifices and burners

1.Remove front jacket door. Remove inlet air box top panel (see Figure 27, item 13, page 54).

2.Check for correctly-sized manifold orifices. See Table 2 for sizing. (The orifice size is stamped on the orifice spud barrel.)

Correctly-sized manifold orifices must be used. Failure to do so will result in severe personal injury,

death or substantial property damage.

3. Reinstall inlet air box top panel.

Inlet air box top panel must be in position during boiler operation. Failure to do so could result in severe personal injury, death or substantial property damage.

Orifice replacement procedure

(when required)

1.Remove the screws securing the inlet air box top panel.

2.Remove inlet air box top panel and inspect the fiber gasket. Verify the gasket is in good condition and can seal around the complete perimeter of the air box. Replace the gasket if necessary.

3.Using a 7/16" open-end wrench, remove the burner orifices from the manifold.

4.Apply a small amount of pipe dope to each of the new orifices and install in the manifold using a 7/16" open-end wrench. Make sure the orifices are aligned correctly, not cross-threaded in the manifold tappings.

Use only pipe dope compatible with propane gas, even if boiler is to be operated on natural gas. Failure to comply could result in severe personal injury, death or substantial property damage.

5.Carefully replace the inlet air box top panel, making sure the gasket is in place will seal all around the perimeter.

6.Follow the check-out procedure, section 8 page 30, to assure the boiler is now operating properly after orifices are replaced.

Table 2 Manifold orifice sizing

 

Location

Natural gas

Propane gas

 

 

 

 

 

 

 

 

U. S.

0-2,000 ft

over 2,000 ft

0-2,000 ft

 

over 2,000 ft

 

 

 

 

 

 

 

2.70 mm

(Note 1)

1.65 mm

 

(Note 1)

 

 

 

 

 

 

 

 

 

 

 

Canada

0-2,000 ft

2,000-4,500

0-2,000 ft

 

2,000-4,500

 

2.70 mm

#38

1.65 mm

 

#53

 

 

 

 

 

 

 

 

 

 

Note 1: For elevations above 2,000 feet, contact your local Weil-McLain sales office for details.

12

 

 

 

 

 

 

 

 

 

 

Part number 550-110-260/0200

Image 12
Contents Page How it works ① Control modulePage Contents Installer Please read before proceedingUser 1a Prepare boiler location codes & checklist Residential garage installation 1b Prepare boiler location clearancesFlooring and foundation 1c Prepare boiler location vent system Removing from existing vent1d Prepare boiler location contamination Air contamination1e Prepare boiler location air openings CGs combustion air optionsSizing air openings for CGs installations 2a Prepare boiler placement & setup Orifice replacement procedurePlace boiler/crate near position Inspect orifices and burners2b Prepare boiler pressure test Perform hydrostatic pressure testPrepare boiler for test Fill and pressure test3a Water piping general information 3b Water piping single-zone system Expansion tankDiaphragm-type or bladder-type expansion tank Figure Closed-type expansion tank Figure3c Water piping multiple zones Converted gravity or steam systemsTypical piping multiple-zone installations Temperature gauges Valve adjustment 3d Water piping low temp systemsPrimary/secondary preferred bypass piping For radiant heating or converted gravity systems3e Water piping low temp systems Boiler-bypass alternate piping 3f Water piping low temp systems 3f system-bypass alternate piping 3g Water piping refrigeration systemPrevent chilled water from entering boiler Connecting gas supply piping to boiler Venting and combustion airGas piping Natural Gas LengthField wiring Wiring connectionsThermostat Junction Box furnishedFreeze protection when used 7a Start-up preparationDetermine if water treatment is needed Check for gas leaks7a Start-up preparation 7b Start-up operate boiler7c Start-up if boiler doesn’t start Check burner flamesCheck for Check-out procedure checklist Installation and service certificate9a Operation sequence Raise room thermostat to call for heat9b Operation wiring diagrams Schematic wiring diagramService For Your Safety Read Before Operating 9c Operation lighting instructions10a Service and maintenance schedule Service technician10b Service & maintenance annual start-up Burners, base and inlet air box Boiler heating surfacesCondensate drain system Inducer motor10b Service & maint. annual start-up Boiler relief valve Lever must be operated AT LeastReview with owner 11a Troubleshooting procedure Before troubleshooting11b Troubleshooting air pressure switch Check pressure switch setting11c Troubleshooting control module Control indicator lights lockout modesControl module connections 11d Troubleshooting control module lights Chart 1 Troubleshooting Power light statusChart 2 Tstat Circ & Power lights flashing Chart 3 Press Switch & Power lights flashing Chart 4 Flame & Power lights flashing Turn OFF Power to boiler at service switch or breaker Does blower motor operate? Verify Sequence of operation, , 12a Replacement parts Page Page Page Page Page 13a Dimensions Dimensional drawing13b Ratings DOEHandling ceramic fiber and fiberglass materials Removal of Combustion Chamber Lining or Base Panels

550-110-260/02002 specifications

Weil-McLain is a well-known manufacturer of high-quality heating systems and boiler solutions, and the 550-110-260/02002 model is a testament to the company's commitment to innovation and performance. This particular boiler is designed for commercial and residential applications, providing exceptional heating efficiency and reliability.

One of the standout features of the Weil-McLain 550-110-260/02002 is its robust construction. Built using durable materials, this boiler is engineered to withstand demanding environments while maintaining optimal performance. The unit boasts a high thermal efficiency rating, which translates to lower energy costs and reduced environmental impact. The advanced design ensures that fuel consumption is minimized while delivering consistent heat output.

The Weil-McLain 550-110-260/02002 utilizes a multi-stage burner that enhances combustion efficiency. This feature not only reduces emissions but also improves overall energy use, making it an environmentally friendly choice. The sophisticated control system allows for precise modulation of the burner, ensuring that the boiler operates at peak efficiency under various load conditions.

The boiler is equipped with a user-friendly digital control interface, providing operators with real-time monitoring and diagnostics. This allows for easy adjustments and troubleshooting, which helps to reduce maintenance downtime. The integrated safety features enhance the operational reliability of the unit, ensuring safe operation in any environment.

Another important characteristic of the Weil-McLain 550-110-260/02002 is its adaptability. It can be configured to work with various types of fuel including natural gas and propane, giving users the flexibility to choose the most cost-effective energy source. This versatility also helps to extend the lifespan of the boiler as it can be easily adapted to changing energy needs.

In conclusion, the Weil-McLain 550-110-260/02002 is a high-performance boiler that combines durability, efficiency, and advanced technology. With its robust construction, efficient burner system, and user-friendly controls, it stands out as a reliable heating solution for both commercial and residential applications. The commitment to quality and innovation makes this model a preferred choice for those seeking dependable heating systems. Whether for new installations or replacements, the Weil-McLain 550-110-260/02002 delivers exceptional performance and value.